JTLS-GO6.0最新研发计划1

举报
资源描述
JTLS-GO 6.0Design PlanJTLS-GO 6.0Design PlanJanuary 2020January 2020JOINT THEATER LEVEL SIMULATION-GLOBAL OPERATIONS(JTLS-GO 6.0.0.0)JOINT THEATER LEVEL SIMULATION-GLOBAL OPERATIONS(JTLS-GO 6.0.0.0)DEPARTMENT OF DEFENSEJOINT STAFF J7116 LAKE VIEW PARKWAYSUFFOLK,VA 23435-2607JTLS-GO Document 18Blank PageROLANDS&ASSOCIATES CorporationJTLS-GO Document 18December 17,2019iiiDesign PlanABSTRACTABSTRACTThe Joint Theater Level Simulation-Global Operations(JTLS-GO)is an interactive,multi-sided,joint(air,land,naval,and special operations)and combined(coalition warfare)constructivesimulation model.This computer-based wargame system uses inherent functionssea,air,land,special operations,intelligence,and logisticsto model conflict(pre-combat,combat operations,and post-combat)at the operational level of war with tactical fidelity.This JTLS-GO 6.0 Design Plan describes the functional changes proposed for this JTLS-GOversion release.Each Enhancement Change Proposal(ECP)design description includes asummary of the associated Model Change Request(MCR),as well as a detailed explanation ofthe software modifications proposed to implement the requested capability.Test plans,whichwill be executed prior to approving the design changes for release as part of JTLS-GO 6.0,areincluded.Corrections,additions,or recommendations for improvement must reference specific sections,pages,and paragraphs with appropriate justification and be forwarded to:JTLS-GO Development Team LeaderROLANDS&ASSOCIATES Corporation120 Del Rey Gardens DriveDel Rey Oaks,California 93940 USAJTLS-GOCopyright 2018-ROLANDS&ASSOCIATES CorporationJTLS-GO Document 18ROLANDS&ASSOCIATES CorporationDesign PlanivDecember 17,2019Blank PageDesign Plan ROLANDS&ASSOCIATES CorporationJTLS-GO 6.0.0.0 v17 December 2019 TABLE of CONTENTS TABLE of CONTENTSABSTRACT.iiiJTLS-2011-10948 Multiple Names For Air Missions.11.0 Summary of Model Change Request.12.0 Design Summary.13.0 Detailed Design.14.0 Data Changes.25.0 Order Changes.26.0 JODA Changes.27.0 Test Plan.2JTLS-2013-11707 Improve Simscript Debugging Capability.51.0 Summary of Model Change Request.52.0 Design Summary.53.0 Detailed Design.54.0 Data Changes.65.0 Order Changes.66.0 JODA Changes.67.0 Test Plan.7JTLS-2016-12714 Build An Inherent JTLS-GO MSEL Tool.91.0 Summary of Model Change Request.92.0 Design Summary.93.0 Detailed Design.94.0 Data Changes.95.0 Order Changes.96.0 JODA Changes.97.0 Test Plan.9JTLS-2017-13132 Allow HRUs To Gather Intel From DSAs.111.0 Summary of Model Change Request.112.0 Design Summary.113.0 Detailed Design.124.0 Data Changes.145.0 Order Changes.146.0 JODA Changes.157.0 Test Plan.15JTLS-2017-13139 Better Location Information In IIR Messages.171.0 Summary of Model Change Request.17ROLANDS&ASSOCIATES CorporationDesign Plan 17 December 2019viJTLS-GO 6.0.0.02.0 Design Summary.173.0 Detailed Design.174.0 Data Changes.175.0 Order Changes.176.0 JODA Changes.177.0 Test Plan.17JTLS-2019-14350 Detailed Engagement Report For User.191.0 Summary of Model Change Request.192.0 Design Summary.193.0 Detailed Design.194.0 Data Changes.195.0 Order Changes.196.0 JODA Changes.197.0 Test Plan.19JTLS-2019-14351 Allow Viewing Multiple Messages.211.0 Summary of Model Change Request.212.0 Design Summary.213.0 Detailed Design.214.0 Data Changes.215.0 Order Changes.216.0 JODA Changes.217.0 Test Plan.21JTLS-2019-14352 Develop a Maritime Specific DSA Report.231.0 Summary of Model Change Request.232.0 Design Summary.233.0 Detailed Design.244.0 Data Changes.295.0 Order Changes.296.0 JODA Changes.297.0 Test Plan.29JTLS-2019-14353 Convoy Data In AAR.311.0 Summary of Model Change Request.312.0 Design Summary.313.0 Detailed Design.314.0 Data Changes.315.0 Order Changes.316.0 JODA Changes.317.0 Test Plan.31Design Plan ROLANDS&ASSOCIATES CorporationJTLS-GO 6.0.0.0 vii17 December 2019JTLS-2019-14354 All WHIP Objects Searchable.331.0 Summary of Model Change Request.332.0 Design Summary.333.0 Detailed Design.344.0 Data Changes.435.0 Order Changes.436.0 JODA Changes.437.0 Test Plan.43JTLS-2019-14356 Attacking Mission ROE Help.511.0 Summary of Model Change Request.512.0 Design Summary.514.0 Data Changes.525.0 Order Changes.526.0 JODA Changes.527.0 Test Plan.52JTLS-2019-14357 Move From Oracle To PostgreSQL.531.0 Summary of Model Change Request.532.0 Design Summary.533.0 Detailed Design.534.0 Data Changes.535.0 Order Changes.536.0 JODA Changes.537.0 Test Plan.53JTLS-2019-14400 GlobalSim Improvements.551.0 Summary of Model Change Request.552.0 Design Summary.553.0 Detailed Design.554.0 Data Changes.555.0 Order Changes.556.0 JODA Changes.557.0 Test Plan.55JTLS-2019-14464 Expand TACELINT Data Fields.571.0 Summary of Model Change Request.572.0 Design Summary.573.0 Detailed Design.574.0 Data Changes.625.0 Order Changes.656.0 JODA Changes.657.0 Test Plan.66ROLANDS&ASSOCIATES CorporationDesign Plan 17 December 2019viiiJTLS-GO 6.0.0.0JTLS-2019-14476 Move To Adopt OpenJDK.691.0 Summary of Model Change Request.692.0 Design Summary.693.0 Detailed Design.694.
展开阅读全文
温馨提示:
金锄头文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。
相关搜索

当前位置:首页 > 学术论文 > 期刊/会议论文


电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号