成本管理计划支持系统——工程造价控制策划和规划的新范例-毕业设计外文翻译

上传人:suns****4568 文档编号:82908876 上传时间:2019-02-25 格式:DOCX 页数:27 大小:61.21KB
返回 下载 相关 举报
成本管理计划支持系统——工程造价控制策划和规划的新范例-毕业设计外文翻译_第1页
第1页 / 共27页
成本管理计划支持系统——工程造价控制策划和规划的新范例-毕业设计外文翻译_第2页
第2页 / 共27页
成本管理计划支持系统——工程造价控制策划和规划的新范例-毕业设计外文翻译_第3页
第3页 / 共27页
成本管理计划支持系统——工程造价控制策划和规划的新范例-毕业设计外文翻译_第4页
第4页 / 共27页
成本管理计划支持系统——工程造价控制策划和规划的新范例-毕业设计外文翻译_第5页
第5页 / 共27页
点击查看更多>>
资源描述

《成本管理计划支持系统——工程造价控制策划和规划的新范例-毕业设计外文翻译》由会员分享,可在线阅读,更多相关《成本管理计划支持系统——工程造价控制策划和规划的新范例-毕业设计外文翻译(27页珍藏版)》请在金锄头文库上搜索。

1、COMPASS-NEW PARADIGM FOR PROJECT COST CONTROL STRATEGY AND PLANNING By Makarand Hastak/ Associate Member, ASCE, Daniel W. Halpin,2 Member, ASCE, and Jorge Vanegas/ Associate Member, ASCE ABSTRACT: The need to remain competitive while generating profit requires management to develop innovative. cost

2、management strategies that will allow them to distinguish and control early-on factors that might adversely. impact the cost of a project. This paper describes a decision support system, COMPASS (Cost Management Planning Support System) for project cost control strategy and planning. Throughout the

3、life cycle of a project, COMPASS methodology assists management in evaluating the potential degree of cost escalation. It also identifies attributes such as management errors, regulatory approval, and error/rework, that might be the cause for project cost escalation. Furthermore, COMPASS assists man

4、agement in formulating a cost control strategy while utilizing their experience and past project performance data. The attributes identified by the cost control strategy, if controlled, would minimize the expected loss.INTRODUCTION Project ost scalation and cost management are clearly two of the mos

5、t important management concernsin the intensely competitive environment of the construction industry. Consequently, it s very important for management to detect at an early stage of a project the actual or potential cost overruns. To remain competitive while generating profit, management needs to id

6、entify and adopt in novative cost management strategies. These strategies should allow them to identify and control early on factors that might adversely impact the cost of a project. To date, various methodologies have been developed for project cost control such as earned value system management.

7、exception reporting, and cost trend analysis. However, none of these methods considers at a macro level the influence of many important factors (or attributes) such as waste, project management practices, change orders, and error/rework on the project cost. Existing methods of cost control focus on

8、identifying and controlling line items (cost components) that have already experienced a cost escalation. In other words, existing methods of cost control relate to symptoms rather than the cause. What is required, however, is a paradigm shift. A new method is needed that, in addition to recognizing

9、 he symptoms, identifies and focuses our attention on the attributes that are a potential cause for escalation in the line items for a given project. The new paradigm should have the capability to analyze a given project while incorporating the past project performance data and the experience of the

10、 project team. This analysis should identify and suggest control of attributes such as management errors, regulatory approval, and error/rework, which have a potential to instigate cost escalation in the line item estimate. Moreover, it is of importance to identify and control these attributes befor

11、e they influence the project cost.Identification of attributes that might be responsible for project cost escalation is not sufficient in itself. What is equally important is to control the influence of the identified attributes on the project cost. This would require developing a projectcost contro

12、l strategy to either eliminate or reduce the impact of identified attributes on the line items, thereby minimizing the expected loss.Existing methods of cost control do not assist management in developing a cost control strategy to minimize the impact of all such attributes on the project cost. The

13、optimum strategy would identify and suggest control of a set of attributes to minimize the probable project cost escalation.To analyze and control the impact of these attributes on the project cost, it is important to collate the past project performance data available with the user firm. Furthermor

14、e, these data should be analyzed with respect to the new project characteristics by using an appropriate analytical medium. A computerized decision support system (DSS) would therefore be advantageous to assist the user in developing a suitable project cost control strategy. ATTRIBUTE VERSUS LINE IT

15、EMS The tenn attribute (as used in the present paper) does not refer to the conventional tenn line items. However, it pertains to the factors that might be responsible for generating cost escalation in the line items of a project. The difference is emphasized to delineate the point of departure for this research. In recent years, many researchers have addressed the issue of cost control by using techniques such as Monte C