xxx工程合同中英文版

上传人:第*** 文档编号:32819482 上传时间:2018-02-12 格式:DOCX 页数:8 大小:36.52KB
返回 下载 相关 举报
xxx工程合同中英文版_第1页
第1页 / 共8页
xxx工程合同中英文版_第2页
第2页 / 共8页
xxx工程合同中英文版_第3页
第3页 / 共8页
xxx工程合同中英文版_第4页
第4页 / 共8页
xxx工程合同中英文版_第5页
第5页 / 共8页
点击查看更多>>
资源描述

《xxx工程合同中英文版》由会员分享,可在线阅读,更多相关《xxx工程合同中英文版(8页珍藏版)》请在金锄头文库上搜索。

1、xxx engineering contractxxx 工程合同Contract No.: 合同编号: Party A: xxxCompany Limited甲方:xxx 有限公司Party B:xxx Company Limited乙方:xxx 有限公司This contract is made and entered into on the day of , 2014 by the following Parties in .本合同于 2014 年 月 日由以下当事方在 签署。Party A: xxx Company Limited, 甲方:xxx 有限公司,xxx 经营的公司,住所地为

2、xxx,(下称“甲方”),法定代表人:xxxParty B: xxx Company Limited, 乙方:xxx 有限公司,一家 xxx 经营的公司,注册地址是:xxx,(下称“乙方”),法定代表人:xxx Party A and Party B are called by a joint name of Both Parties under this contract, each of which is called as A Party.甲方和乙方在本合同项下统称为“双方”,单独称为“一方”。1. Work Content and Requirements1. 工作内容、要求1.1 I

3、n accordance with the items stipulated in this Contract, Party B shall conduct the project as per the Project standard and quality standard stipulated by Ministry of Engineering of the Union of xx.1.1 依据本合同所限定的条款,乙方应以 xx 工程部规定的建筑标准和质量要求执行本工程。2. Contract Period2. 合同期限2.1 Work period for the Road Cons

4、truction Project: the work shall be completed within 2 month upon signing the Contract. The condition of handover is that the Project Inspection & Acceptance Team constituted by Party A, shall issue the Inspection & Acceptance Sheet after onsite inspection. 2.1 本次工程时间周期:合同签订后 14 个工作日内完成,并以甲方组成的竣工验收小

5、组现场检验并出具验收单为竣工交接条件。2.2 This contract shall be implemented after this is duly signed by the legal representatives or authorized representatives of the Parties and stamped with the seals of the Parties, and closed after the onsite acceptance of the Project and Contract payment.2.2 本合同自双方法定代表人或授权代表人签字盖

6、章后生效,现场验收合格、款项支付完毕后关闭。3. Health, Safety and Environment Principles (HSE)3. 健康、安全和环境原则(HSE)3.1 The staff from Party B shall follow the arrangement of Local government and Party A (or its representatives), and comply with the laws and regulations of Myanmar as well as rules and regulations on Health,

7、Safety and Environment (HSE) of Party A.3.1 乙方工作人员必须听从地方政府、甲方人员(或代表)的安排,遵守缅甸法律、法规和甲方的安全环境健康规章制度等。3.2 Before or during the implementation of this Project, Party B shall acknowledge, avoid and prevent the possible damage of the Project to the surrounding environment and other affiliated facilities, an

8、d the resulting losses shall be borne by Party B.3.2 在工程实施之前或进行当中,乙方应识别工程可能对周边环境及原有设施造成的危害,应进行规避和防护,对由此带来的损失,应由乙方承担。3.3 During the performance of this Contract, Party B shall bear the personal and property losses of Party B or Party Bs personnel injury by itself, if the losses are not caused by Part

9、y A.3.3 在合同履行过程中,若发生非甲方原因导致的乙方或乙方人员人身或财产损失的,由乙方自行承担。4. Contract Price, Payment and Taxes4. 合同价格、付款事宜及税费4.1 As per the stipulated construction contents, both Parties agree that this Contract is a lump sum contract. The contract payment includes all construction costs and related cost for construction

10、 preparation and construction implementation .Please refer to the following table for the details4.1 按照本合同所确定的工程内容,甲方与乙方确定本次马德岛岗亭工程为费用总包合同,合同费用包含全部工程施工费用及其他与工程准备、工程执行相关的费用。详见下表警务室预算报表(USD)NO. particular Qity Rate(usd) Amount(usd)123456789101112 NO.123456789101112 13 14 NO.12345The total amount: 费用合计

11、:xxx 美金4.2 The Contract shall be valued in USD, and the payment shall be settled in equivalent value of KYAT. The exchange rate shall be at the spot exchange rate from USD to KYATon the day of payment by the handling bank of Party A. Unless otherwise specified by Party B and agreed by Party A, Party

12、 A shall only conduct payment in accordance with the bank account of Party B agreed in this contract.Party B shall be responsible for the authenticity, safety and accuracy of its designated account information. If Party A fails to pay or delays payment due to the causes of Party Bs account, all resp

13、onsibilities and consequences hereof shall be undertaken by Party B itself. The account information assigned by Party B is as follows:4.2 本合同以美金计价,以美元或等值缅币结算。汇率为付款银行付款当天美元兑缅币的即时汇率。除非乙方有特别说明并经甲方同意,甲方仅按本合同约定的乙方银行帐号付款,乙方应对其指定的账户信息真实性、安全性、准确性负责。因乙方账户的原因造成甲方不能付款或付款迟延的,由此引起的一切责任及后果由乙方自己承担。乙方指定的账户信息如下:Acco

14、unt Name: 账户名:Account Number: 账号:Beneficiarys Bank:收款银行:SWIFT/BIC Code: 银行国际代码:Correspondent Bank:代理银行:Swift Code of Correspondent Bank 代理银行国际代码:Address:地址:Tel 电话:4.3 Both Parties shall perform their respective taxation obligations in accordance with the tax laws and regulations of the Union of Myan

15、mar. The Contract Price includes withholding tax and other taxes of Party B. .4.3 本合同签约双方应依照缅甸国家的相关税收法律法规,履行纳税义务,乙方在合同总价中包含有预扣所得税和其他税费部分。4.4 The payment of this Contract shall be conducted in three instalments:4.4 本合同付款一次付清,付款方式为电汇:Within 10 working days after signing this Contract, Party A shall ma

16、ke the first payment equals to 30% of the total Contract Price.验收合格后,甲方向乙方支付全部合同金额。5. Alterations5. 变更事宜5.1 Party A shall have the right to require increasing the work scope (hereinafter referred to as “Alterations”) on the basis of this Contract.5.1 甲方有权在此合同的基础上,要求增加工作范围(以下称之为“变更”)。5.2 All the requirements on alteration shall be in the written form, clearly defining necessary alterations. Party B shall submit corresponding work plan

展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 建筑/环境 > 工程造价

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号