交通工程专业外文翻译外文文献英文文献教学教材

上传人:youn****329 文档编号:129140483 上传时间:2020-04-22 格式:DOC 页数:10 大小:87.50KB
返回 下载 相关 举报
交通工程专业外文翻译外文文献英文文献教学教材_第1页
第1页 / 共10页
交通工程专业外文翻译外文文献英文文献教学教材_第2页
第2页 / 共10页
交通工程专业外文翻译外文文献英文文献教学教材_第3页
第3页 / 共10页
交通工程专业外文翻译外文文献英文文献教学教材_第4页
第4页 / 共10页
交通工程专业外文翻译外文文献英文文献教学教材_第5页
第5页 / 共10页
点击查看更多>>
资源描述

《交通工程专业外文翻译外文文献英文文献教学教材》由会员分享,可在线阅读,更多相关《交通工程专业外文翻译外文文献英文文献教学教材(10页珍藏版)》请在金锄头文库上搜索。

1、 2012 土木工程学院交通工程专业中英文翻译Road Design专 业: 交 通 工 程 英文原文The Basics of a Good RoadWe have known how to build good roads for a long time. Archaeologists have found ancient Egyptian roadsthat carried blocks to the pyramids in 4600 BCE. Later,the Romans built an extensive road system, using the same principl

2、es we use today. Some of these roads arestill in service.If you follow the basic concepts of road building, you will create a road that will last. The ten commandments of a good road are:(1)Get water away from the road(2)Build on a firm foundation(3)Use the best materials(4)Compact all layers proper

3、ly(5)Design for traffic loads and volumes(6)Design for maintenance(7)Pave only when ready(8)Build from the bottom up(9)Protect your investment(10) Keep good records1Get water away from the roadWe cant overemphasize the importance of good drainage.Engineers estimate that at least 90% of a roads probl

4、ems can be related to excess water or to poor waterdrainage. Too much water in any layer of a roadsstructure can weaken that layer, leading to failure.In the surface layer, water can cause cracks and potholes. In lower layers it undermines support, causing cracks and potholes. A common sign of water

5、 in an asphalt road surface is alligator cracking an interconnected pattern of cracks forming small irregular shaped pieces that look like alligator skin. Edge cracking, frost heaves, and spring breakup of pavements also point to moisture problems.To prevent these problems remember that water: flows

6、 downhill needs to flow someplace is a problem if it is not flowingEffective drainage systems divert, drain and dispose of water. To do this they use interceptor ditches and slopes,road crowns, and ditch and culvert systems.Divert Interceptor ditches, located between the road and higher ground along

7、 the road, keep the water from reaching the roadway. These ditches must slope so they carry water away from the road.Drain Creating a crown in the road so it is higher along the centerline than at the edges encourages water to flow off the road. Typically a paved crown should be 14 higher than the s

8、houlder for each foot of width from the centerline to the edge. For gravel surfaces the crownshould be 12 higher per foot of width. For this flow path to work, the road surface must be relatively water tight. Road shoulders also must be sloped away from the road to continue carrying the flow away. S

9、uperelevations (banking) at the outside of curves will also help drainthe road surface.Dispose A ditch and culvert system carries water away from the road structure. Ditches should be at least one foot lower than the bottom of the gravel road layer that drains the roadway. They must be kept clean an

10、d must be sloped to move water into natural drainage. If water stays in the ditches it can seep back into the road structure and undermine its strength. Ditches should also be protected from erosion by planting grass, or installing rock and other erosion control measures. Erosion can damage shoulder

11、s and ditches, clog culverts, undermine roadbeds, and contaminate nearby streams and lakes. Evaluate your ditch and culvert system twice a year to ensure that it works. In the fall, clean out leaves and branches that can block flow. In spring, check for and remove silts from plowing and any dead pla

12、nt material left from the fall.2 Build on a firm foundationA road is only as good as its foundation. A highway wears out from the top down but falls apart from the bottom. The road base must carry the entire structure and the traffic that uses it.To make a firm foundation you may need to stabilize t

13、he roadbed with chemical stabilizers, large stone called breaker run, or geotextile fabric. When you run into conditions where you suspect that the native soil is unstable, work with an engineer to investigate the situation and design an appropriate solution.3 Use the best materialsWith all road mat

14、erials you “pay now or pay later.” Inferior materials may require extensive maintenance throughout the roads life. They may also force you to replace the road prematurely.Crushed aggregate is the best material for the base course. The sharp angles of thecrushed material interlock when they are compa

15、cted. This supports the pavement and traffic by transmitting the load from particle to particle. By contrast, rounded particles act like ballbearings, moving under loads.Angular particles are more stable than rounded particles.Asphalt and concrete pavement materials must be of the highest quality, d

16、esigned for the conditions, obtained from established firms, and tested to ensure it meets specifications.4Compact all layersIn general, the more densely a material is compacted, the stronger it is. Compaction also shrinks or eliminates open spaces (voids) between particles. This means that less water can enter the struc

展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 高等教育 > 大学课件

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号