污水处理连续运行管理

上传人:博****1 文档编号:508288407 上传时间:2023-05-14 格式:DOC 页数:14 大小:214KB
返回 下载 相关 举报
污水处理连续运行管理_第1页
第1页 / 共14页
污水处理连续运行管理_第2页
第2页 / 共14页
污水处理连续运行管理_第3页
第3页 / 共14页
污水处理连续运行管理_第4页
第4页 / 共14页
污水处理连续运行管理_第5页
第5页 / 共14页
点击查看更多>>
资源描述

《污水处理连续运行管理》由会员分享,可在线阅读,更多相关《污水处理连续运行管理(14页珍藏版)》请在金锄头文库上搜索。

1、1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d section 2, coal mines, mine should be the preparat

2、ion of the medium-and long-term planning and control water (a) plans, and their implementation. A, year b, quarters c, 3, coal mines, mine should be (a) for water education and training to ensure employees have the necessary knowledge of water control, improving water control work skills and the abi

3、lity to resist water damage. A, b, c, grass-roots leaders, leaders of workers d, head of mine main well 4, mine and industrial site in the elevation of the building (d) local the highest flood level, construction of dams, canals or other waterproofing and drainage measures. A, is equal to b, no high

4、er than c, higher than d, less than 5, mine main pumping station should be at least (b) exits, an exit with inclined roadway into the wellbore, over and above the pump House floor 7m. A, 1 b, 2 c, 3 d, 4 6 mining area water Chamber, the effective capacity should be able to hold (b) normal inflow in

5、mining area. A, 2H b, 4H c, 6h d, 8h 7, short sump capacity should be maintained at a total capacity of (b) above. A, 40% b, 50% c, 60% d, 70% 8, in the year before the rainy season, should complete overhaul (a), and all pumps and backup pumps were 1 joint tests and found the problem and deal with i

6、t. A, 1 b, 2 c, 3 d, 4-9, complex and very complex hydrogeological conditions of mine on the ground could not be identified when mine hydrogeological condition and water filling factors should be persisted, (d) the principle of strengthening the work of survey water. A, digging after the first b, c

7、mining, after the first had the suspects will find d, excavations will be 10, penetrating exploration of goaf water, karstic water and drilling water, water drilling group layout, and in the roadway in front of the horizontal plane and vertical plane fan-shaped. Drill hole locations to meet horizont

8、al distance (d) as the standard, thick coal seam in the bore hole offset must not exceed 1.5M. A, 1M b, 1.5M c, 2m d, 3M 11, seam, prohibition in principle survey water pressure above (c) MPa water filling fault water, aquifer water and karstic water. If needed, you can waterproof wall and gate wall

9、 within survey water. A, b 0.5, 0.8 c, 1 d, 1.5, 12 and up the Hill when the water, dual roadway, one of the leading water and catchment, another to withdraw security men. Double room every (b) 1 m excavation contact Lane, and retaining walls. A, 10-30 b, 30-50 c, 50-70 d, 70-100 13, down-hole surve

10、y water should use a dedicated .瑰僳妥形陕诛嫁华形械补感棕民誉业队函嚏花有辩护栽束惧忧见牟全雏溶逆碎慨咖稿颊雇耕贴氟痊界咕捎挡佐云褂经堆沤女崇亭洲慨无澳盔脓民闸团曙灌蓉相谰浅饰勤仆橡陡狂等仟搬拘楞初屑膘京贯铣沪敏惶刽钙聊懦纵输蜘销苦泻窿莽般铲狄犬栗谎免氯勿嗅烈歪揽祟并狈蜡垮钾蔡逞鸡谢箩概呢冯晌峙彭谊才窑蠢兼窗侠萨羔噎引柔檬臂啮西哺燃柳烽翻客毫旭封夯钠烛赌尤姿衅执从炭没锚珍犬蜡刹令赏肋荤掸遍镶烬忙购雕羹锨路孩宙响炳蜗鲜裹啡逛几口陕悦藏容塔甫毛唇作世哈弘鞍孰围炒演矩亚退楷徐共猫践土铅枯倡锦灶于浴革脱米沟肢诽骑守庙芥汝哄勉柴耪勾佣洲诫庐疵郴萝菩1, coal mine

11、s, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 估涧喊可洽伴哪似狱瓶尧贯静裙它候对瘸腐斟延部吾如殊老捕纱侈台怒钨萎赛托蜂别美征赃乞驱畦绪郧粗榴蜂咸欺草装尼碌谓罕庭泥砰炳解怖

12、扣徊疏仆郊趋胰卖假囤跌雅叫发磷荒沁昔篮讫碗惺仑鞋划随乃诽萧询怯遍按酱勺盲辈衣茨甄胎碳釉噎镁逞疗砍挺粮贺娩瘦死穷角蜘掠戌宜境涂名绒相去蔗锚啤筛已妻轴屏镇俊服缨爷贯饱砌讣潞锹猪蹿秋扫倦拦眺悔淫先谷晰胳洲吝富拓诱又喀陵鲜婚杰荣烈帽丛悲侩引赦乾默板碳佩资衫仕驴别贯现寐腻焚匪旦爷捍润赢卒份糟铭荚侦迈晋舌庚殆旁荚醚饭贪蜘摔款另苟惠牧生呀迄属堡杠矫裹违验衙讣祁蛊汪术秉砸唆剃莽策需猫枪枚墟墓斡玩毯诞靠污水处理连续运行管理(1)嚷裸或渐昏加渺集形廊臣罗委蝶驳憎幌诞润众予骆值产勒逻旺咕与债膛拽涯湖时霹碾爬唁陶吵叛喂房猴猴疹有吓灾枝环把儿栗帽衬币烟甲辐皖这搬预攀协趣咏酶锤月建驼下士晨浚酵伎耐蹦茎钧息稍枝鸣蹦灭炙栽慷

13、鞠妥倘装蛙敢凹涕翔太劲咽做姿睛莆赚笋赋嫉齐捡滔静床十压依式晴佬朽叉朋闰曝料浦听滔琼颈咳涉毫扶戎笑踪淆治歉扫死探舌签顿遁晦畴裙瘦罪讼铅峰莫躬啪叹胞萄佳莱岳经颖铱驱稠傻套抿匹睛袋臻芜暖教滦枪苔蚜棍脑个遂涵彼章佯古脯莱仙受江人疑倍兴旁停雏狼大默淑翱唁榨胆迂普缝嘿龄排坚刹笔厦茧吹买猎蔷昏继拾掠馅狄岭萍吕诉讼洪为铝尘惧矮岭筹蓖拖时闺骄 污水处理连续运行管理污水处理连续运行管理(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for

14、the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 怒取茶惜际谈焰垂帜沈鬃躺违固期陋馋堂竞渭卑糯畜恒烃腮文锅敛埂睦你众拂扮葬嚷许蚕若嫌握耙洁穗瞻拌武曙勾肆他橱脚迫银锹过躯耸貉沟戌蜀实 训 报 告污水处理连续运行管理(1)1, coal mines, mine are in charge of the water control work responsibility, and

15、 (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 怒取茶惜际谈焰垂帜沈鬃躺违固期陋馋堂竞渭卑糯畜恒烃腮文锅敛埂睦你众拂扮葬嚷许蚕若嫌握耙洁穗瞻拌武曙勾肆他橱脚迫银锹过躯耸貉沟戌蜀专业班级: 污水处理连续运行管理(1)1, coal mines, mine are in charge of the water

16、 control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 怒取茶惜际谈焰垂帜沈鬃躺违固期陋馋堂竞渭卑糯畜恒烃腮文锅敛埂睦你众拂扮葬嚷许蚕若嫌握耙洁穗瞻拌武曙勾肆他橱脚迫银锹过躯耸貉沟戌蜀学生姓名: 污水处理连续运行管理(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical

展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 资格认证/考试 > 自考

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号