Hotel Nikko Hongkong

上传人:s9****2 文档编号:507912543 上传时间:2023-10-09 格式:DOC 页数:96 大小:1.73MB
返回 下载 相关 举报
Hotel Nikko Hongkong_第1页
第1页 / 共96页
Hotel Nikko Hongkong_第2页
第2页 / 共96页
Hotel Nikko Hongkong_第3页
第3页 / 共96页
Hotel Nikko Hongkong_第4页
第4页 / 共96页
Hotel Nikko Hongkong_第5页
第5页 / 共96页
点击查看更多>>
资源描述

《Hotel Nikko Hongkong》由会员分享,可在线阅读,更多相关《Hotel Nikko Hongkong(96页珍藏版)》请在金锄头文库上搜索。

1、Hotel Generic HongkongDocument No.: OCP-RRRevision No.:Page 2 of 2Signature of General Manager:Date:Revision RecordIn the EMS for Hotel Generic Hongkong senior executives are responsible for checking the operational control procedures for the departments for which they are responsible. The General M

2、anager is responsible for ensuring that the EMS is being followed and for confirming changes to the operational control procedures. Department Heads in consultation with staff in their department/sections, the executive responsible for their department, the Deputy EMS Manager and the EMS Manager com

3、pile the OCPs. The same parties agree changes to an OCP. OCPs are issued to departments, or for large departments, to sections. This is to ensure staff in the department/section understand the operation of the EMS and their role in fulfilling its requirements. Consequently a number of generic OCPs a

4、re repeated in this document. Each OCP is given a checkbox to allow department heads to check compliance.Document Ref:Rev.DateNature of ChangesAuthorisationSignatureOCP-EHHVAC SectionDirector of EngineeringOCP-EEElectrical SectionDirector of EngineeringOCP-EMMechanical SectionDirector of Engineering

5、OCP-EPPlumbing, Drainage and Fire Services SectionDirector of EngineeringOCP-EBBuilding and Decoration SectionDirector of EngineeringOCP-ETTechnical Store SectionDirector of EngineeringOCP-EOEngineering Office SectionDirector of EngineeringOCP-HRHuman Resources Deputy General ManagerOCP-SDSecurity D

6、epartmentDirector of EngineeringOCP-FKKitchensF&B ManagerOCP-FSServices SectionsExecutive ChefOCP-FAAdministration OfficeExecutive ChefOCP-HKHousekeepingDeputy General ManagerOCP-LDLaundryExecutive HousekeeperOCP-FOFront OfficeDeputy General ManagerOCP-EXExecutive OfficesDeputy General ManagerOCP-PR

7、Public RelationsDeputy General ManagerOCP-SMSales & MarketingDeputy General ManagerOCP-PDPurchasingFinancial ControllerOCP-AOAccounts OfficesPurchasing ManagerOCP-ASAccounts StoresPurchasing ManagerOperational Control ProceduresHotel Generic HongkongDocument No.: OCP-EHDepartment: Engineering Depart

8、mentRevision No.:Date:Section: HVAC SectionCompiled by: Chief EngineerSignature:Page 1 of 6PurposeTo maintain the heating, ventilation and air-conditioning (HVAC) system and equipment, perform monitoring and measurements so as to minimise the health/safety/environmental impact, prolong system and eq

9、uipment life, optimise the use of natural resources, and comply with legal requirements.ScopeMaintenance of HVAC system includes: central chiller plant; seawater cooling equipment; air handling units; fan coil units; fresh and exhaust air fans; refrigerators; system control devices, etc.Resource con

10、sumption includes: material use / waste disposal; chemicals handling; and energy and water conservation.ResponsibilitiesThe responsibilities are the same for all sections in the Engineering Department.The staff of the section are responsible for following the established engineering and resources co

11、nservation practices. (Staff are encouraged to be actively involved in the execution of the EMS and for suggesting improvements).The Chief EngineerIn Hotel Generic Hongkong the day-to-day management of activities is the responsibility of the Chief Engineer. These could be delegated to a section head

12、. is responsible for: ensuring all staff understand and implement the prescribed engineering and resources conservation practices; organising monthly meeting to obtain feedback from the staff and respond to their inquiries; maintaining the OCPs for the Engineering Department (in consultation with th

13、e Director of Engineering and the EMS Manager); and maintaining relevant records. The Director of EngineeringThe Director of Engineering is responsible to monitor and regularly audit the activities of the Engineering Department. Responsibilities may vary according to the management structure of a ho

14、tel and/or the responsibilities assigned under the hotels EMS. is responsible for: auditing and monitoring the routine activities in the Engineering Department; arrange training for the staff on an as-needed basis; updating the chemicals handling, system operation and maintenance manual, etc; checki

15、ng the material and chemical storage areas; and checking whether appropriate notices are clearly visible and in the correct locations.ProceduresGeneral:q Damaged HVAC equipment and electrical control devices shall be repaired and reused if possible, otherwise are disassembled to recycle reusable components.q Water pipes shall be checked quarterly, and

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 商业/管理/HR > 营销创新

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号