资源描述

《城市道路与桥梁施工技术标书》由会员分享,可在线阅读,更多相关《城市道路与桥梁施工技术标书(101页珍藏版)》请在金锄头文库上搜索。

1、synchronous backup software does not respond to the rest of the data to be modified. In order to ensure maximum server exception, saving some data, synchronization of real-time backup software should have high, that delay does not exceed 1 minute. Offsite backups that must be supported across networ

2、k segments. In accordance with the above requirements for development our dedicated backup software. After development, wing that opened in salt on high speed test results meet the design requirementsWith the passing of time, it is preparing source Huan of Hubei industrial investment company limited

3、 factory close to the planning of the day looks like, planning human ideals gradually into an entity, spread out before us. Security plan enters the deployed State. After listening to your business objective for the leaders of security, I quickly people with loyalty to the cause of security, as well

4、 as previous security experience, combined with peer pioneers of success stories or experiences. Border security on your business ideas and suggestions to make as follows: 1.1 after careful analysis of a blueprint of the enterprise, taking into account your enterprise factory boundary: 540.65M x 234

5、.24M rectangular site. 1.2 scope for such dachangqu, I recommend the solid border security deployment, for a range of reasons, whether we use infrared radiation, electronic fences, alarm had done there, where the response. Because the factory could not spend a great deal of manpower cost to post thr

6、ee steps, five steps and a whistle. As we all know, under the current form of human resources costs much higher than the cost of all scientific and technological input. In order to better achieve the goal of planners, as well as for Active solid border defense work. We recommend that you use infrare

7、d radiation or linkage of electronic fences with video security deployment to achieve security goals. 1.3 in accordance with the device on the wall of the compound properties and parameters to a reasonable plan to install the infrared radiation equipment or fences and electronic equipment as well as

8、 video surveillance equipment, the specific needs of the equipment and materials quantities we will detail later. 1.4 the programme according to your companys site to see and listen to the leadership proposal, and in accordance with the actual needs of the project, with reference to the relevant int

9、ernational standards and national standards, combined with the experience accumulated by the company engaged in multiple projects, prepare the technology package. If the contents or any other aspect of the programme has not detailed where we welcome your valuable comments. Second, the design princip

10、les of the project design follows technology advanced, functional, stable and cost-saving principles. And considering construction, maintenance and operation, and for future development, expansion, reconstruction and other factors leave room for expansion. Design elements of the system is the system

11、atic, integrated and comprehensive; design has the scientificity, reasonability and operability. Its has following principles: 2.1, and advanced and applicability used currently most advanced of soft, and hardware and the network technology, errors rate low, compatible sex strong, upgrade easy, used

12、 module type structure, expansion convenient, no repeat construction investment, system of technology performance and quality index should reached international leading level; while, system of installation debugging, and software programming and operation using and should simple, easy master, for Ch

13、ina conditions and this project of features. Set the number of advanced technology in a the systems, reflects the current level of the latest development of computer and network technology, adapted to the requirements of the times. While the system is the system used for various management levels, i

14、ts functions are configured to provide the user with comfortable, safe, fast and convenient to3.1, the intelligent building design standards (GB/t 50314-2000) 3.2, the design standard for intelligent building systems engineering (DB32/191-1998) 3.3, the code一、总体概述(一)编制依据1、 市新华路道路工程施工招标文件2、 新华路道路工程施工

15、图3、 给水排水管道工程施工及验收规范(GB50268-97)4、 市政排水管道工程质量检验评定标准(CJJ3-90)5、 城市道路路基工程施工及验收规范(CJJ44-91)6、 粉煤灰石灰类道路基层施工及验收规程(CJJ4-97)7、 市政道路工程质量检验评定标准(CJJ1-90)8、 埋地塑料排水管道工程技术规程(DG/T08-308-2002)9、 沥青路面施工及验收规范(GBJ 92-86)10、 公路桥涵施工技术规范(JTT041-2000)11、 市政桥梁工程质量检验评定标准(CJJ2-90)12、 城市桥梁设计准则(CJJ11-93)(二)工程概况新华路位于 经济开发区,呈东西走

16、向。本次设计西起新园路(K0+000),东至蟠龙山路(K0+978.372),道路全长978.372m,沿线主要相交的现状及规划道路依次为新园路、规划新长路和蟠龙山路,下穿新长铁路,横跨白屈港。其中下穿新长铁路通道位置(K0+720)-蟠龙山路(K0+978.372)由 设计院集团有限公司南京设计院进行设计。新华路为40m 三幅路型式,即路宽40.0m=7.5m(机动车道)2+1.5m(两侧分隔带)2+4.0m(非机动车道)2+2.0m(人行道)2+5.0m(绿化带)2。K0+332.208 新建桥梁一座,总长125m,跨径布置为5*25m 五跨简支梁。拟建新华路白屈港桥位于某市要塞,白屈港河的两侧有石驳岸,河两侧的场地地势较平坦。该桥为新建工程,桥梁总长133.08m,跨径布置为5x25m 五跨简支梁,桥面连续。桥梁与河道成67 度斜交。本次投标内容为:施工图纸范围内的道路、排水、桥梁、管线、交通标线等。(三