变电站电缆自动化系统的有效计划 电气工程及其自动化专业毕业设计外文翻译-中英文对照

上传人:夏** 文档编号:470259517 上传时间:2023-06-22 格式:DOC 页数:11 大小:369.50KB
返回 下载 相关 举报
变电站电缆自动化系统的有效计划 电气工程及其自动化专业毕业设计外文翻译-中英文对照_第1页
第1页 / 共11页
变电站电缆自动化系统的有效计划 电气工程及其自动化专业毕业设计外文翻译-中英文对照_第2页
第2页 / 共11页
变电站电缆自动化系统的有效计划 电气工程及其自动化专业毕业设计外文翻译-中英文对照_第3页
第3页 / 共11页
变电站电缆自动化系统的有效计划 电气工程及其自动化专业毕业设计外文翻译-中英文对照_第4页
第4页 / 共11页
变电站电缆自动化系统的有效计划 电气工程及其自动化专业毕业设计外文翻译-中英文对照_第5页
第5页 / 共11页
点击查看更多>>
资源描述

《变电站电缆自动化系统的有效计划 电气工程及其自动化专业毕业设计外文翻译-中英文对照》由会员分享,可在线阅读,更多相关《变电站电缆自动化系统的有效计划 电气工程及其自动化专业毕业设计外文翻译-中英文对照(11页珍藏版)》请在金锄头文库上搜索。

1、Efficient Planning of Substation AutomationSystem CablesThanikesavan Sivanthi and Jan PolandABB Switzerland Ltd, Corporate Research,Segelhofstrasse 1K, 5405, Baden-Dattwil, Aargau, SwitzerlandAbstract The manual selection and assignment of appropriate cables to the interconnections between the devic

2、es of a substation automation system is a major cost factor in substation automation system design. This paper discusses about the modeling of the substation automation system cable planning as an integer linear optimization problem to generate an efficient cable plan for substation automation syste

3、ms.1 IntroductionCabling between different devices of a substation automation system (SAS) is a major cost factor in the SAS design process. Usually computer aided design software is used to create the design templates of SAS devices and their interconnections. The design templates are then instanti

4、ated in a SAS project and the cables are manually assigned to the connections. The selection and assignment of cables to connections must follow certain engineering rules. This engineering process is usually time consuming and can cause engineering errors, thereby increasing the engineering cost. Ap

5、parently, the SAS cable planning is related to the well known bin packing problem. The SAS cable planning can be formulated as an integer linear optimization problem with the cable engineering rules expressed as a set of linear constraints and a cost objective for minimizing the total cable cost. Th

6、is paper describes the formulation of SAS cable planning problem as an integer linear optimization problem and presents the results for some representative test cases. To the best of the authors knowledge the work is the first of the kind to study SAS cable planning. The paper is organized as follow

7、s. Section 2 presents an overview of the SAS cable planning process. Section 3 expresses the SAS cable planning problem as an integer linear optimization problem. The results obtained by solving the optimization problem using some solvers is presented in Section 4. Section 5 draws some conclusions o

8、f this work.2 SAS Cable PlanningThe SAS cable planning begins after the system design phase of a SAS project.The SAS cable planning is at present done manually by computer aided designT. Achterberg and J.C. Beck (Eds.): CPAIOR 2011, LNCS 6697, pp. 210214, 2011.cSpringer-Verlag Berlin Heidelberg 2011

9、Efficient Planning of Substation Automation System Cables 211Fig. 1. Fields, devices and their interconnections(CAD) engineers. The different design templates corresponding to the actual devices of a SAS are instantiated in one or more CAD jobs. Each job consists of one or more sheets and each sheet

10、 has fields which are logical groups of devices as shown in Figure 1. Moreover, a field corresponds to a physical assembly interface class e.g. Metering box, Protection cubicle etc. Each device has pins which are the physical interconnection interfaces of the device. A valid connection is a unique p

11、ath between exactly two pins and every connection carries a physical signal. A signal can traverse over one or more connections. Each connection is assigned to exactly one of the conductors of a cable. The type of cables to which the connections are assigned is based on cable engineering rules. The

12、cable engineering rules can be classified into two types, namely the cable rules and the signal rules. The cable rules specify the allowed cable types for a set of connections. It can also specify the number of spare conductors which must be left free in each instance of the allowed cable types. The

13、 signal rules specify restrictions on allocation of connections which carry signals that should not be allocated to the same cable or preferably allocated to the same cable. The current practice is to manually select and assign cables to connections according to the cable engineering rules. This pro

14、cedure is time consuming and can cause engineering errors thereby increasing the engineering cost. In what follows is the formulation of the SAS system cable planning as an integer linear optimizationproblem with which a more efficient cable plan for SAS can be generated.3 Integer Linear Program For

15、mulationThe SAS cable planning problem is divided into sub problems where each sub problem considers connections between distinct set of field pairs within a given set of CAD jobs. The rationale behind this decomposition is that the cable plan should consider the physical assembly interface classes

16、and should not mix connections between two different source or destination physical assembly interface classes in one cable. This is ensured by deriving a cable plan for each distinct field pairs. Let C = 1, 2, 3, . . .,N represent the set of all connections between two field pairs, where N is the total number of connections, and K = 1, 2, 3, . . .,M212 T. Sivanthi and J. Polandrepresent the set of all cable types, where M is the tota

展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 办公文档 > 工作计划

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号