资源描述

《浆砌石坝施工方案》由会员分享,可在线阅读,更多相关《浆砌石坝施工方案(10页珍藏版)》请在金锄头文库上搜索。

1、many other precious cold water fish. Mineral resources, has proved many of the gold ore body, high grade, large reserves, reserves of more than 170 million tons of lignite, iron, vanadium and titanium magnetite reserves proven 6 million cubic meters, 40 million tons of quartz sand deposit reserves,

2、the rare. ) From the short plate, Woods continued industry weak, support is not strong, especially inadequate for processing, there are no resources to make good products, marketing is not enough, there are no good products sell for a good price. Livelihood weakness, my district is located in the bo

3、rder area, the climate is cold, for many years of the masses of workers have a hard life, and complete the building of forest societys weaknesses are mainly concentrated in the area of peoples livelihood, especially in terms of poverty, the task is still very arduous. From the perspective of short-t

4、erm capital, district financial situation at present tense, some financial debts to repay, is basically living money, no money for development, transformation where did the money come from still outstanding. From the perspective of talent short Board, my talent shortage, low overall quality, irratio

5、nal structure, weak overseas talents into local serious brain-drain, especially high-end talents badly, has become the development of controlKey issues. If these short Board neither avoid nor overcome, not padded, transformation and development cannot be achieved in forest areas. Second, think calml

6、y, calmly. A local economic development, strengths and weaknesses are dynamic and reciprocal transformation, there is no absolute advantages and disadvantages, advantages and disadvantages of nothing, as the time, place, and changes in external conditions, advantages could become disadvantages, disa

7、dvantages may also be to your advantage. For example, my good ecological environment, land development later, is the nations most dare ring of green and organic food, but these years are basically kind of traditional crops such as soybean, wheat, especially the heavy use of chemical fertilizers and

8、pesticides, the ecological advantages of agricultural development are being degraded. For example, ice and snow were our weaknesses, sought after now, with visitors to the snow and ice in the South, but the development of eco-tourism of gold and silver. For example, our region is located in the bord

9、er area, has been our weakness today as the country along the way, and long Jiang Silk Road building farther forward, but is expected to be opened to the Russian frontier. (From XXs situation, while our railways, ports and other projects has not fought for, but with the Mongolia-Russia economic corr

10、idors 65 policy and steady growth benefits of further releases, provide opportunities for our projects, paving projects in the early County, in the Thirteen-Five period will very likely get a specific implementation). Practice has proved that adversity is short or long目录一、工程概况及编制依据.02二、施工准备03三、施工工艺0

11、4四、 质量标准.08五、 施工注意事项.09六、 工程质量记录.09一、 工程概况及编制依据1.1、工程概况工程名称:龙泉市高塘生活垃圾卫生填埋场改建工程(一期)调节池工程建设单位:龙泉市环境卫生管理处设计单位:中国水电顾问集团华东勘探设计研究院监理单位:杭州诚信投资咨询管理有限公司施工单位:深圳市中兰实业有限公司杭州中兰环保工程有限公司(联合体)工程简介:龙泉市高塘生活垃圾卫生填埋场改建工程(一期)调节池工程位处龙泉市剑池街道曾家村高塘,工程内容包括调节池土石方、底部防渗、浮动盖系统、气体收集系统、膜上压重物及雨水收集系统、周边锚固及稳定等。工程合同工期120日历天,中标合同价为271.9

12、762万元。本工程的浆砌石坝为M10浆砌块石重力坝,坝顶高程321m(高程采用1985国家高程基准,下同),石坝上游坝坡为1:0.1,石坝下游坝坡为1:0.7,坝顶宽度为3.0m,坝轴线长度为33.91m,坝底高程307m,最大坝高14m。浆砌石坝的主要工程量有:1、土方开挖1575m3(估算值,因地貌变化,具体以实际施工测量为准);2、浆砌石坝4026.99m3;3、浆砌块石面勾平缝575m2;4、各类预制件及栏杆等附属设施。1.2、编制依据1、施工合同及设计施工图2、设计交底及施工图会审纪要3、浆砌石坝施工技术规定SD120-844、砌体工程施工质量验收规范GB50203-20025、混凝

13、土结构工程施工质量验收规范GB50204-2002二、施工准备2.1 材料及机具1、水泥:普通硅酸盐32.5R水泥,运到现场时必须有出厂合格证和出厂质量验收单,方可验收入库,水泥运到工地后,必须通过国家质量检测机构检验,其品种强度,性能必须符合设计要求。2、砂浆:采用M10(砌筑)及1:2水泥砂浆(勾缝及抹面),机械拌和。砂浆有良好的和易性,保水性和水透水性,稠度一般为4-6cm;砂浆采用天然砂,砂料质地坚硬、清洁,级配良好,最大粒径不超过5mm,平均料径不小于0.25mm。砂的含泥量不超过5%。3、块石:砌体所用块石采用坚硬、密实,无风化无裂缝,无粘附物质,清洁的石料,其强度满足设计要求(M

14、U20)。5、主要机具:挖掘机、自卸车、砂浆拌合机、斗车另备有大铲、灰刀、扁子、线坠、小白线、卷尺、水平尺、皮数杆、小水桶、灰槽等。2.2 劳动力部署针对本工程特点,我们将认真组织施工,并充分发挥企业的管理力量和技术装备优势。我公司将安排具有丰富施工经验的工程师承担本工程项目经理,项目经理部拟投入一支30人左右的施工队伍,拟投入管理人员6人,技术工人约20人,并且在全公司范围内抽调骨干力量参加本工程的施工,加强工程现场施工管理,从各个方面保证工程建设顺利、高效、优质完成。三、施工工艺3.1 测量放线采用NTS-320南方全站仪对石坝的主要四大角轴线相关尺寸进行测量放线。根据测量放线结果设置定位

15、桩,采用外控轴线向设计轴线量取。 采用S3水准仪对开挖部位的原始地貌进行复测,并做好记录。用石灰洒出开挖线,进行基础开挖。3.2 土方开挖1、土方开挖采用挖掘机及自卸车配合进行,由边到中,自上而下,分层循序进行取土。当开挖到接近路基设计顶面时,根据土质情况注意预留碾压沉落高度,严防超挖。挖土过程中,基底工作面按设计保持一定的纵、横坡度。2施工注意事项(1)、根据土方工程开挖深度和工程量的大小,选择机械和人工挖土或机械挖土方案。(2)、开挖应保持一定的距离和坡度,以保持开挖边坡部位的稳定,如现场条件不满足要求,应采取边坡支撑加固措施。并在施工中进行沉降和位移观测。(3)、弃土应及时运出,如需要临时堆土,或留作回填土,堆土坡脚至坑边距离应按开挖深度、边坡坡度和土的类别确定(应考虑堆土附加侧压力)。(4)、土方开挖工程完成后要尽量减少暴露时间,及时进行下一道工序的施工。如不能立即进行下一道工序。要预留1530cm厚覆盖土层,待基础施工时再挖去。(5)、工作前应查明施工场地明、暗障碍物(如电线、地下电缆、管道、坑道等)地点及走向,保证机械安全作业。(6)、机械行驶时,禁止搭乘其他人员。(7)、机械行走前,必须确认机械前没有人或障碍物,发出信号(按喇叭)后方能移动机械。工作中司机离岗时,必须将机械可靠