1、program is enacted, implementation of in-house security training programmes managed by the authority; responsible for the regulated enterprises new project preparation, proactive coordination, responsible for new employee safety, technical training; (I) the construction, reconstruction and expansion

2、 engineering design, construction, commissioning process management, supervision of construction and expansion project ready for production work; ensure that relevant state labor safety and industrial sanitation simultaneously with the principal part of the project design, construction, and commissi

3、oning procedure implementation; (J) development of production information management system, establishing and perfecting the company produces information management network, post production operation management information in a timely manner, guiding the enterprises to develop information exchange;

4、(11) to contribute to the safety offered to praise or reward, to have those responsible for the accident, be criticized and punished; (12) actively promote the safety quality standardization, clean production work, exploring new management methods and means of production safety, establishing the lon

5、g-term mechanism of safe production; (13) according to the carbon company, combined with the companys actual, organized safety evaluation, critical incident management, technology monitoring, dam safety, reliability, management, flood control and other safety work, and check for implementation; (14)

6、 in its investigation on an accident of personal death and above; unit of organization that belong to major accidents investigation; typical accident analysis system of the company, develop corrective actions. Supervision of four no principles implementation; complete accident statistics, analysis,

7、and reporting; Eighth: Workshop safety responsibilities for related infrastructure projects in the area of safety supervision, guidance, coordination, and assume the corresponding responsibility. (A) the implementation of national safety-related laws, regulations and industry codes, standards, super

8、vision of implementation; (B) in accordance with the regulations to the relevant departments for safety information, and to communicate and coordinate with the relevant departments on relevant issues; (C) supervision of dam safety and flood prevention work and timely reporting to the carbon company

9、relevant information; (D) urged to report carbon the rules of safety indicators, reflect the internal safety critical issues; (E) the production of safe and civilized construction and infrastructure projects, such as checks, and urge rectification of identified problems, significant problems in time

10、 to report to the company; (F) the related security supervision, inspection, assessment, technology monitoring, reliability, management found in . (A) implementation of safety laws, regulations and safety regulations, requirements for parent company. Make perfect production safety rules, regulations

11、 and procedures; (B) according to the request of the parent company, this annual safety targets and implementation; (C) establish and improve the responsibility system for production safety at all levels strengthen safety assurance system and the functions of the security monitoring system; three-le

12、vel safety net role into full play; four to realize safety production control; (D) establishment of safety education and training system and dynamic assessment mechanism, enhance employees锄沟小学第一部分 施工组织设计一、 工程范围1 工程概况1.1 总体概况 1.2 建筑工程1.3 结构工程1.4 给排水工程1.5 暖通工程1.6 电气工程2 施工范围和主要工程量2.1 施工范围2.2 主要工程量3 材料供

13、应范围二、 总平面图1 场地布置2 施工道路3 临建4 排水5 机械布置6 施工用水7 现场用电三、 现场管理组织机构和劳动力计划1 现场管理组织机构2 项目经理及主要技术管理人员情况2.1 项目经理及主要技术管理人员情况表2.2 岗位职责 3 劳动力计划四、 施工管理1 施工管理制度1.1 技术交底制度1.2 材料进场检验制度1.3 样板引路制度1.4 施工挂牌制度1.5 过程三检制度1.6 质量否决制度1.7 成品保护制度:1.8 培训上岗制度:2 施工计划管理3 施工技术管理4 文件管理5 设计变更管理6 和其他单位的配合6.1 与设计单位协调6.2 与业主监理工程师工作的协调五、 施工

14、机械配备和进出计划六、 人员培训及资格评定1 人员资格评定2 人员培训七、 物资管理1 总则2 物资供应商的控制3 采购物资的质量控制4 物资和设备的保管5 采购物资的质量证明文件管理八、 对本工程的建议九、 主要施工技术方案和措施1 总体施工方案1.1 测量放线1.2 基础工程1.3 主体结构1.4 墙体砌筑1.5 内装饰工程1.6 楼地面工程1.7 顶棚工程1.8 门窗工程1.9 外墙保温涂料墙面工程1.10 屋面工程1.11 管道工程1.12 电气工程2 其它施工技术方案2.1 季节性施工措施2.2 专项施工技术方案3 环保措施3.1 施工现场环保措施3.2 废弃物的管理3.3 施工污染

15、控制措施3.4 施工现场消防措施4 特殊施工措施4.1 后浇带施工4.2 地下防水第二部分 工程进度、质量控制和安全文明施工管理一 进度计划和保证进度的措施1 里程牌进度2 二级计划进度3 保证进度的主要措施3.1 组织措施3.2 计划措施3.3 技术措施3.4 资源配置措施二 质量目标和质量管理措施1 质量目标2 质量管理措施2.1 组织保证措施2.3 技术保证措施2.4 施工过程保证措施2.5 激励创优奖罚措施2.6 工程质量回访程序3 质量通病的控制措施3.1 钢筋工程3.2 混凝土工程3.3 防水工程4 成品保护措施4.1 成品保护管理办法4.2 主要分项工程的成品保护措施三 质量标准和质保体系1 质量标准2质保体系3质保计划四 安全和文明施工1 安全工作目标2 安全管理体系2.1 安全管理组织机构2.2 安全管理体系3 安全控制措施4 文明施工管理目标5 文明施工管理制度和措施第三部分 附图、附表1 附图1.1