1、Covidien / Tyco Medical Phase 1 Proposal,2008.05.30,Fasai Road Current Tyco Layout,Fasai Road Facility - Proposed Improvements,Expand current space by 197 sqm increase working area and pallet positions Dust reduction Expansion of temporary wall from floor to ceiling Installation of air curtain at do

2、ck door Repair floor damage Label storage area segregated by fence and access control Fenced area on 2nd floor mezzanine for hold and damaged goods Segregated area in racking for quarantine products (16 pallet positions) clearly identified with signage and blocked in system Security Improvements Two

3、 CCTV cameras Card access control system (two access points) Alarms installed on two pedestrian doors and dock door,Fasai Road Facility Operational Restrictions,Ambient storage (minus 25 degrees) Two dock doors Dock levelers Increased ceiling height Increased office capacity,Improvements Option 1 -

4、Install New Racking,Move temporary wall and expand space by 197 sqm Remove existing racking (1000 x 2600 x 4 levels) and replace with new racking (900 x 2700 x4 levels) increase 97 pallet positions Increase inbound/outbound work area by 50 sqm Increase labeling area by 50 sqm (label storage will be

5、a point of use and access controlled) Additional space for block storage of packing materials and overflow,Improvements Option 1 - Install New Racking,Improvements Option 2 Existing Racking,Move temporary wall and expand space by 197 sqm Utilize existing racking (1000 x 2600 x 4 levels) and install

6、decking due to increased width or rack increase 94 pallet positions at current configuration Increase inbound/outbound work area by 50 sqm Increase labeling area by 50 sqm (label storage will be a point of use and access controlled) Additional space for block storage of packing materials and overflo

7、w,Improvements Option 2 - Existing Racking,Improvements - Detailed View of Mezzanine,Covidian/Tyco Medical Incremental Monthly Costs,Covidian / Tyco Medical One-Time Costs,Covidien / Tyco Medical Phase 2 New Facility,2008.05.30,DHL Proposed Warehouse Locations,DHL Fengxian,Phase II Covidian/Tyco Fac

8、ility Requirements,KangQiao Geographic Location,Address: 3398 Xiu Pu Road, Shanghai Road: Approximately 15 km from city center Air: 12 km from the Pudong International Airport and 22 km from the Hongqiao Domestic Airport Sea: 25km from the Waigaoqiao Port and 60km from the Yangshan Deepwater Port Ra

9、ilway: 10km from the Zhuqiao Station of the Pudong Railway, a railway that is built for the transportation of containers to and from the Yangshan Deepwater Port,KangQiao Facility Overview,New built-to-suit warehouse, started operation by Sept. 2007 Total Construction Area: 55,055 sqm. Expansion avai

10、lable to support customer growth 12.5 meter clear height ceiling 50 covered docks with dock levelers 24/7 site security with CCTV and card access control 2,000 sqm of on-site office space 2,200 sqm of ambient storage (16-26 degrees) 160 sqm of cold storage space (0-5 degrees) Complies to all local f

11、ire regulations with in-rack sprinkler and fire alarm system,Kangqiao - Draft Covidien/Tyco Medical Layout,Warehouse 1 2nd Floor,Kangqiao - Draft Covidien/Tyco Medical Layout,Kangqiao - Draft Covidien/Tyco Medical Layout,Pallet position: 312 Total space: 1,636 sqm (including 160 sqm of cold storage)

12、 Aisles width: 3,300 mm Racking dimensions: 2700L*900W*6300H. Packing area: 35 sqm (20 pallet capacity) On-site office area: 80 sqm (15 person capacity) Caged area for label storage: 20 sqm,Fengxian Facitliy Overview,Three warehouses (31.500 sqm each) Approximately 140,000 pallet locations 10.9 mete

13、r clear ceiling height with sprinkler Approximately two years old Direct highway access 110 covered docks (some with dock levelers) More than 1,000 employees 24/7 operations and security,Fengxian - Overall Site Layout,Covidian/Tyco Medical Phase II Next Steps,Determine optimal facility (Kangqiao or Fengxian) June 6, 2008 (Covidian) Confirm operational requirements June 6, 2008 (Covidian/DHL) Finalize layout and submit for approval June 13, 2008 (DHL) Prepare pricing and submit June 27, 2008 (DHL) Covidian/Tyco Medical review and feedback July 11, 2008,