1、 AFRICAN MINERALS CONSTRUCTION Occupational Health shall be the appointed AML representative who is in overall management and control of the Project. 1.2.3. Construction Manager (CM): shall mean the AML Representative, appointed as the Resident Construction Manager by the AML Project Manager, to be

2、responsible for the management of all aspects on the AML construction site. 1.2.4. Safety, Health and Environmental Superintendent (OH R/A (JHA job hazard analysis): A task specific document assessing/analyzing the risks/hazards involved in the work steps of a task and the controls required to elimi

3、nate or minimize the exposure levels to the identified risks/hazards. 1.2.20. Daily Safe Task Instruction (DSTI): a pre start task document for the use by supervisors with memory joggers to instruct the workforce on potential hazards involved in the days task as well as safety documentation required

4、 to cover the task at hand i.e. work permits, R/As etc 1.3. OBJECTIVE: As per the African Mineral Limited, Construction OH Port Pepel upgrade, upgrade and construction of railway line and mine site construction. 3.4. CONTRACTORS OH repetitive Vehicle and mobile equipment - trucks, service vehicle, f

5、orklifts, and cranes Tools and machinery - maintenance equipment and tools High pressure gases - compressed air, acetylene, argon, oxygen Workplace hazards - falling (high places, excavations), rolling, sliding, slipping Noise and vibration - mobile equipment, equipment and process Electricity - med

6、ium and high voltage supply Fire and explosion - fuels and compression Stress related - shift work, heat, working environment Environmental related - space, heat, waste, ventilation, illumination, amenities Presence of snakes and spiders Health Malaria, TB, Lassa Fever, Cholera, Yellow Fever, Hepati

7、tis, HIV/ Aids, Bilharzia. Should the AML - CM or his duly nominated alternative identify hazardous activities being performed by the Contractor on site, for which the Contractor has not submitted a risk assessment, the work shall be stopped and the Contractor will be required to do so before contin

8、uing the work. The Contractor is therefore required to ensure that the activities are continuously assessed for risks and managed accordingly. When a risk is rated as high or medium, a safe work procedure (SWP) has to be developed which will detail the steps to be followed to ensure that the activit

9、ies / work will be completed safely risks must be reduced to “As Low as Reasonably Practical” (ALARP) prior to undertaking the activity. An activity SL03-AML-00-00000-SR-PLN-20000 Operational Plan Construction Plan Revision: A Page 10 Of 29 This document is uncontrolled once printed AFRICAN MINERALS

10、 CONSTRUCTION Construction Plan may be classified as high or medium by the decision of the AML- CM or the AML OH an initial Residual Risk Rating can be calculated and applied. Determine the most likely or typical Consequence resulting from exposure to the hazard. This may involve either injury to pe

11、rsons or damage to property or the environment. The next step is to determine the Likelihood phrase which best describes the chance of the event occurring. The Risk Assessment Rating is the point on the matrix where Likelihood and Consequence meet. Risk assessments shall be compiled by the relevant

12、stakeholders, who will submit a copy of the completed and signed off risk assessment to the AML - OH Consequence 1 Minor First Aid Injury $10k - $100k 2 Medium MTI $100k - $500k 3 Serious RWI $500K $2M 4 Major LTI $2M $20M 5 Catastrophic Fatality $20M Likelihood A - Almost Certain 1 per week (25%) M

13、ODERATE 11 HIGH 16 EXTREME 20 EXTREME 23 EXTREME 25 B - Likely 1/week 1/month (10-25%) MODERATE 7 HIGH 12 HIGH 17 EXTREME 21 EXTREME 24 C - Possible 1/month 1/year (1-10%) LOW 4 MODERATE 8 HIGH 13 HIGH 18 EXTREME 22 D - Unlikely 1/year 1/10 years (0.1-1%) LOW 2 LOW 5 MODERATE 9 HIGH 14 HIGH 19 E - R

14、are one day). Ensuring that the applicable OH Sub/Contractor OH Mgt rep. Minutes Contractor OH Employee; OH AML- OH / Contractor Letter drops Interested Parties As authorised by AML- CM AML-CM/OH grinding, chipping and chasing. Screens shall be provided to protect onlookers and passers-by. 4.4.10. W

15、elders, Arc & gas welding/cutting, shall wear suitable eye protection, gloves and apron with spats. 4.4.11. Anti flash screens shall be provided to protect onlookers and passers-by. 4.4.12. When handling corrosive liquids (e.g. acids or caustic) suitable eye protection, gloves and special overalls s

16、hall be worn in accordance with the requirements of the applicable Material Safety Data Sheet (MSDS). 4.4.13. Suitable eye protection shall be worn by all persons including visitors, in all areas of the construction site. 4.4.14. Ear protection shall be worn in any designated noise zone. 4.4.15. Suitable respirators, as well as rescue perso