1、INJECTION MOULDING PROCESSThe moulding process refers to shaping of plastic melt inside the mould. This involvesFilling phase, Switchover point, peak pressure occur after slight delay. Pressure phase, Cooling phase. Sequence in the processIt is desirable to have highest possible filling speed (Injec

2、tion Rate) during filling phase. Filling speed is normally limited by limitation of shearing in engineering polymers. Highly thermally stable material - commodity polymers- can be filled at high filling rate with out any fear of degradation of polymers melt. Filling phase covers 85 to 98% of total i

3、njection stroke. High speed filling is terminated at Switch-over point and low speed Pressure phase commences. Due to relaxation of compression (10-15%) of melt during injection stroke, melt expands and fills up remaining empty space in the mould. It overfills to raise the cavity pressure as relaxat

4、ion completes. If we dont leave any space for relaxation of melt then, tremendous amount of pressure generated. This can damage the mould. Since mould surface is maintained at lower temperature (than that of melt), melt cools and hence tries to lower its volume as per the pvT characteristics. At thi

5、s point the compensation for shrinkage is supplied at lower speed. Since less than 10% of space is to be filled, it does not require high speed filling. The cavity pressure is just to be maintained in such a manner to compensate for void created by the shrinking melt on account of falling melt tempe

6、rature. The pressure phase has to be maintained till the melt transfer stops. There after the melt has to be cooled further, below heat defection temperature of material. This would prevent deformation of moulding during ejection. Important noteDuring filling phase, pressure value should be set 15-2

7、5 bar above the actual pressure encountered in the cavity. This is because if the relief valve is actuated during the filling phase, oil would drain and you loss control over the speed. In case of doubt, it is ok to set value at about 80% of maximum pressure for the machine through out the filling p

8、hase. The value of maximum hydraulic system pressure is recommended in the manual. To maintain the constant melt front velocity, it is required to adjust the injection speed in stroke dependent multiple steps.During pressure phase, the filling speed is low and constant through out the pressure phase

9、 and pressure can be adjusted in time dependent multiple steps to avoid moulded-in stress.SETTING POSITION SPEED AND PRESSUREPRINCIPLEPRINCIPLE forfor SETTINGSETTING OFOF INJECTIONINJECTION SPEED,SPEED, PRESSUREPRESSURE ANDAND POSITIONPOSITIONPOSITIONPOSITIONSPEEDSPEEDPRESSUREPRESSUREFILLINGFILLING

10、PHASEPHASEAlsoAlso knownknown asas Select end of 1st step and start of 2nd Set SPEED 1Try to set OnlyOnly oneone pressurepressure settingsetting isis requiredrequired SpeedSpeed phase.phase.step.high.AlsoAlso knownknown asas SpeedSpeed phase.phase.ThereThere maymay bebe no.no. ofof stepssteps availa

11、bleavailable onon machine.machine.Select end of 2nd step and start of 3rd stepSet SPEED 2Lower speed for crossing narrow passage / gateStepsSteps areare positionposition controlled.controlled.Select end of 3rd step and start of SWITCH OVER POINT. This point is at around 80-95% of the injection strok

12、e.Set SPEED 3Reduce to lower sink mark / increase to shift weld line.duringduring FILLINGFILLING PHASE.PHASE.PressurePressure SettingSetting shouldshould bebe moremore thanthan actualactual fillingfilling pressure.pressure. asas reliefrelief valvevalve shouldshould notnot bebe actuated.actuated. IfI

13、f itit isis actuated,actuated, thenthen speedspeed controlcontrol willwill bebe lost.lost.FillingFilling pressurepressure dependsdepends onon resistanceresistance toto movemove thethe melt.melt. ItIt dependsdepends onon flowflow ratioratio andand viscosityviscosity ofof melt.melt.PRESSUREPRESSURE PH

14、ASE-PHASE-HoldingHolding phase.phase.ThereThere maymay bebe no.no. ofof stepssteps availableavailable onon machine.machine.Timer controls the Holding pressure steps if available on machine.Holding pressure time for step 1 is set on a timer,Holding pressure 1 set just enough to fill cavity without ov

15、erpacking.StepsSteps areare timerstimers controlled.controlled.Holding pressure time for step 2 is set on a timer,Holding pressure 2 set just enough to fill cavity without overpacking.Holding pressure time for step 3 is set on a timer,SetSet SPEEDSPEED lowlow valuevalue saysay upup toto 35%35% notno

16、t more.more.ThisThis cancan bebe oneone stepstep ofof speedspeed forfor differentdifferent HoldingHolding steps.steps.SpeedSpeed setset isis low,low, asas therethere isis lessless oror nono spacespace toto movemove thethe melt.melt.Holding pressure 3 set just enough to fill cavity without overpacking.