十八大党课心得体会(精选可编辑)

上传人:黯然****空 文档编号:161297117 上传时间:2021-01-15 格式:DOC 页数:24 大小:1.39MB
返回 下载 相关 举报
十八大党课心得体会(精选可编辑)_第1页
第1页 / 共24页
十八大党课心得体会(精选可编辑)_第2页
第2页 / 共24页
十八大党课心得体会(精选可编辑)_第3页
第3页 / 共24页
亲,该文档总共24页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《十八大党课心得体会(精选可编辑)》由会员分享,可在线阅读,更多相关《十八大党课心得体会(精选可编辑)(24页珍藏版)》请在金锄头文库上搜索。

1、不问收获,但问耕耘,把最好的资料送给最好的自己!十八大党课心得体会姓名:XXX时间:20XX年XX月XX日 there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature di

2、fference? From a run standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowe

3、d to open? Why synchronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxi

4、liary power system, wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection fo

5、r large generator? Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system

6、of generator caused by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misop

7、eration, which misuse personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preventing misoperation accident? New operation or after

8、majorrepair of transformers why test? Try discussing steps measured with a Megger insulationresistance of electrical equipment? Lu method is used to find DC grounding considerationarewhat? when there are two point grounding with the polarity should be . 1.600MW supercritical supplementary questions,

9、 blank mini disk can be divided into manual and two oil turbine; oil turbine disc wheel car, the turning speed of the rotor can be controlled at around 80120 RPM (high speed), and it is fulfilled by controlling access to the oil-pressure turbine oil turning on/off and speed level. Medium-speed Coal

10、mill explosion-proof steam from a wind room, _, _ separator casing into the ground to prevent the mill explosion in the process of starting and stopping. Mill load is to accept current signal to the coal control proportional pressure relief valve size, change of hydraulic accumulators and hydraulic

11、cylinders, to achieve load changes. Sealed Air for coal pulverizer drive, Rod bearings, roller. Cold wind of a user with a sealed air blower air, sealed air, ground coal to a cold wind. Turbine sealing oil primary oil source is air-side seal oil pump, the first alternate oil sources (mainly alternat

12、ive oil source) is the main oil pump of turbine. When the primary oil source failure, the first spare source automatic put into operation. Second alternate oil sources primary alternate supply AC electric sealing oil pump on the fuel tank, when the turbine speed is less than 2/3 rated speed or first

13、 alternate source failure occurs, the second spare source automatic switch. Third alternative oil source is provided by DC sealing oil pump. Main fuel tank exhaust throttle should be located 2 steel closing door operation handwheel locking is not allowed and obvious warning signs should be hung. Ste

14、am engine room caught fire, when it threatened to tank or fuel system, shall immediately destroy the vacuum emergency stop, and turn on the tank accident put the throttle, speed and control on oil should be appropriate, to ensure that the rotors lubricants are not interrupted before static. Shaft se

15、al overflow overflow to #8 the low pressure under normal conditions, when #8 the low pressure overflow when the outage to the condenser. Sliding pressure operation of deaerator may avoid deaerator steam source for throttling losses. Normal operation of steam turbine steam distribution mode for steam

16、 distribution nozzle. After the turbines stopped, if the rotor cannot rotate for a short time, rotor _ _ under bending, highest in _ _ highs at this point rotor should be reset, close the hydrophobic _ _ cylinder, keeping _ up and down temperature difference between cylinder _ monitor rotor _ _ deflection, when after you verify that the rotor is, and then manually turning 180 o. When turning the

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 办公文档 > PPT模板库 > 总结/计划/报告

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号