{企业通用培训}Ford某汽车GDT形位公差讲义全集43741251

上传人:精****库 文档编号:140132136 上传时间:2020-07-27 格式:PPTX 页数:115 大小:1.91MB
返回 下载 相关 举报
{企业通用培训}Ford某汽车GDT形位公差讲义全集43741251_第1页
第1页 / 共115页
{企业通用培训}Ford某汽车GDT形位公差讲义全集43741251_第2页
第2页 / 共115页
{企业通用培训}Ford某汽车GDT形位公差讲义全集43741251_第3页
第3页 / 共115页
{企业通用培训}Ford某汽车GDT形位公差讲义全集43741251_第4页
第4页 / 共115页
{企业通用培训}Ford某汽车GDT形位公差讲义全集43741251_第5页
第5页 / 共115页
点击查看更多>>
资源描述

《{企业通用培训}Ford某汽车GDT形位公差讲义全集43741251》由会员分享,可在线阅读,更多相关《{企业通用培训}Ford某汽车GDT形位公差讲义全集43741251(115页珍藏版)》请在金锄头文库上搜索。

1、GD Influence Fit and Finish Reduce Reworks Increase Reliability Affects Assembly Process Reduce cost,10,GD Past evidence, past experience, can sometimes hinder rather than assist the new design concept Result of meeting May be documented in CAD, or paper form,16,GD 0,0,0,29,GD 1PERPENDICULARITY 2POS

2、ITION 3PROFILE,47,GD First to be verified is that the top and bottom limits of size have not been violated (Taylors Principle). A full form check at the MMC and a two pointed instrument check at the LMC. Secondly the features “Position” must be verified. GD,72,GD,82,GD,The upper FCF is the PROFILE o

3、f the Surface, for SIZE, FORM, ORIENTATION and LOCATION controls,The Lower FCF is the ELEMENT Lines of the surface FORM control. No LOCATION or ORIENTATION is implied (No Datums of Reference),100,GD Function Cost Manufacturing Process From agreed generic tolerance data (see Cad Methods) Do Not “pick

4、 tolerances out of the air”, without documented data with which to supports your decision. Do not copy tolerances blindly from previous data,106,GD&T for Body Engineering,Diametral Features,Clearance Holes Holes with specific function,107,GD&T for Body Engineering,ClearanceHoles,Tolerance of feature

5、 size should be derived from the generic tolerance specification, unless otherwise required, and stated on the 3D model,20.0,108,GD&T for Body Engineering,Holes with specific function,20.0,Feature Size and Tolerance of Feature Size to be functionally derived and stated on the 3D model,109,GD&T for B

6、ody Engineering,Slotted Features,Clearance Slots Slots with specific function,110,GD&T for Body Engineering,Clearance,20.0,BOUNDARY,111,GD&T for Body Engineering,Slots with specific function,A,B,2.0,C,BOUNDARY,20.0,112,GD&T for Body Engineering,Step 5,Final Approval of GD&T on the CAD Data,113,GD&T

7、for Body Engineering,Final Approval of GD&T on the CAD Data,Verification required from the core team for Steps One to Four. The goal of this process should be to prevent any changes associated with incorrectly specified PMI after engineering release. This process allows input and participation from all activities affected by the data.,114,GD&T for Body Engineering,Thank you for your attention,115,GD&T for Body Engineering,

展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 商业/管理/HR > 企业文档

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号