PPT创意设计方案

上传人:创****公 文档编号:136633332 上传时间:2020-06-30 格式:PPT 页数:25 大小:4.78MB
返回 下载 相关 举报
PPT创意设计方案_第1页
第1页 / 共25页
PPT创意设计方案_第2页
第2页 / 共25页
PPT创意设计方案_第3页
第3页 / 共25页
PPT创意设计方案_第4页
第4页 / 共25页
PPT创意设计方案_第5页
第5页 / 共25页
点击查看更多>>
资源描述

《PPT创意设计方案》由会员分享,可在线阅读,更多相关《PPT创意设计方案(25页珍藏版)》请在金锄头文库上搜索。

1、Preliminary Design of the eXTP Satellite Institute of Spacecraft System Engineering , CAST Hong Bin Mar 22th , 2017 , Beijing,1. General Description 2. Design Evolution 3. Basic Parameters 4. Preliminary Design 5. Programme Schedule 6. Problems 7. Conclusions,Outlines,General Description,eXTP , the

2、enhanced X-ray Timing and Polarimetry mission, is a science mission designed to study the state of matter under extreme conditions of density , gravity , and magnetism. Its the next generation of the X-ray detected telescope after HXMT in China.,HXMT,eXTP,2007 The conception of XTP was put forward b

3、y IHEP; 2008-2012 An advanced research of the XTP was carried out by ISSE; 2013-2014 Completed the system analysis and achieved the missions basic parameters . The first step design of the XTP was finished; 2015-2016 With the LAD and WFM adding into the XTP and the parameters of SFA new orbit;new pa

4、yload;So we update the design of the eXTP satellite.,2. Design Evolution,3. Basic Parameters,LM-7 launch vehicle ,has a big fairing with diameter of 4200mm a total height of 10300 mm, has maximum capacity for 550km circular orbit at 0 deg. inclination is 4500kg.,4. Preliminary Design,Launch Vehicle,

5、Telemetry and Control system,The TC system applies the international USB system . Low tilt angle communication is achieved through utilizing relay satellites or building new TC station.,Satellite ground application system,Data receiving is achieved by stations at Sanya. Or using the ground station a

6、t Malindi (3S Kenya), built by Italian (LOFT team).,The X axis point to the specific objects in the inertial space ; The sun vector is controlled in XOZ plane and in a obtuse angle with the +Z axis; The sun vector will perpendicular to the solar array by rotate it; According to the users observation

7、 plan to carry out attitude maneuver,aiming at the burst objects to carry on the observation.,4. Preliminary Design,Observation ModePointing Observation,Objects,4. Preliminary Design,Flight Procedure,Burst source,Objects,Configuration,Stowed in fairing,On orbit,4. Preliminary Design,4. Preliminary D

8、esign,Configuration,Service module(SVM): the SVM includes all units required to control and operate the S/C platform. The WFM and GRM are accommodated in the SVM, too. LAD Assembly(LADA): the LADA consists of LAD panel(#1#4), LAD sunshields, deployment mechanisms. The LADA are accomodated on either

9、sides of the SVM. Mirror Assembly Module(MAM): the MAM is located inside the telescope tube , contains the SFA -four tanks -six reaction wheels -two star trackers -four sun acquisition senors -three gyroscopes Support the LAD,WFM and GRM; Downside of SVM is the interface of the launch vehicle; Insid

10、e the SVM theres a contamination cover , its also the sun-shield of the WFM.,Service module(SVM) :,4. Preliminary Design,SFA and PFA are accomodated in the mirror platform. Conceived as independent unit. Can be later integrated into the telescope support structure. Kinematic mounts :Minimising the i

11、mpact of mechanical and thermal-elastic loads onto the optics alignment.,Mirror Assembly(MA) :,LAD Assembly,4. Preliminary Design,Two wings (each wings two panels or one panel(TBD)); LAD support platform use the hign thermal conductivity material for the structure; The deployment mechanisms perform

12、the connection between LAD panel and satellite, withstand the launch loads in the stowed condition; On orbit, the DM releases the panel reliably, and then performs the deployment of the LAD payloads, with the automatic latching at the end of its travel; After the latching, the DM maintains the angul

13、ar position and assure the stiffness.,10 modules each panel 1973(L)1212(B)132(H),20 modules each panel(TBD) 2384(L)1973(B)132(H),4. Preliminary Design,Maintain the required focal length; Support the solar array and ka-antenna; Provide the catching interface for on-orbit servicing(TBD); The ICU of th

14、e focal detectors are accomodated on top of the TT;,Telescope Tube(TT) :,4. Preliminary Design,Hosts the 13 focal plane cameras; With the sun-shield to protect the detectors from the suns; The shape is designed to minimize the envelope dimesions and fit the fairing;,Focal Plane Assembly(FPA) :,4. Pr

15、eliminary Design,TCS: Mirror assembly thermal design,The insulating washers(fiberglass) are used to limit the conductive heat transfer between the MA and MSP. The MA are covered by 15-layer MIL to insulate heat radiation of SVM. The external surface of TT is used for radiator of the MA.,SFA: 202,PFA

16、: 202,4. Preliminary Design,TCS: SDD thermal design,The FPA is connected to the TT by insulating washers, to limit the conductive heat transfer between the SDD and FPSP. The SDD are covered by 10-layer MIL. The SDD heat dissipation are firstly collected by the ethane loop heat pipe, then the collected heat dissipation is refrigerated by the pulse-tube refrigerator(5W180K ,power 120W). Finally, the hot junction heat dissipation of refrigerator is tra

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 高等教育 > 大学课件

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号