《《精编》企业容器、换热器安装工序质量控制表》由会员分享,可在线阅读,更多相关《《精编》企业容器、换热器安装工序质量控制表(22页珍藏版)》请在金锄头文库上搜索。
1、表H-215 Tab.容器、换热器安装工序质量控制表Quality control table for installing procedures of vessel and heat-exchanger项目: Project:装置: Unit工号:Section位 号Location No.名 称Name规 格Specification材 质Material工作介质Medium压 力Pressure温 度Temperature 执行标准Standard for execution检 查 项 目Inspection item等级Grade签名/日期Signature/date施工单位Subco
2、ntractor监理单位Contractor 建设单位Owner设备及附件接收检查Acceptance of equipment & accessoriesC基础复检Check of foundationC找正AlignmentC灌浆前检查Inspection before groutingA内件安装Installation of internalsA严密性试验Air-tightness testAR抽芯试压Core withdrawal and pressure testAR附件安装Installation of accessoriesC平台、扶梯、护栏安装Erection of platf
3、orm, stair & guardrailC卧式设备滑动端检查Check of sliding end of horizontal equipmentB附注:Note表H-215 Tab.容器、换热器安装工序质量控制表Quality control table for installing procedures of vessel and heat-exchanger项目:晋丰集团(闻喜)1830 Project:项目装置: 双甲合成Unit工号:Section位 号Location No.E1702名 称Name热交换器规 格Specification1224*16934材 质Materi
4、al16MnR 20MnMo工作介质MediumH2N2NH3CH4Ar压 力Pressure31.4MPa温 度Temperature200C上部五通300C执行标准Standard for executionGB150-1998GB6654-1996检 查 项 目Inspection item等级Grade签名/日期Signature/date施工单位Subcontractor监理单位Contractor 建设单位Owner设备及附件接收检查Acceptance of equipment & accessoriesC基础复检Check of foundationC找正AlignmentC灌
5、浆前检查Inspection before groutingA内件安装Installation of internalsA严密性试验Air-tightness testAR抽芯试压Core withdrawal and pressure testAR附件安装Installation of accessoriesC平台、扶梯、护栏安装Erection of platform, stair & guardrailC卧式设备滑动端检查Check of sliding end of horizontal equipmentB附注:Note表H-215 Tab.容器、换热器安装工序质量控制表Qualit
6、y control table for installing procedures of vessel and heat-exchanger项目:晋丰集团(闻喜)1830 Project:项目装置: 双甲合成Unit工号:Section位 号Location No.E1703A名 称Name合成水冷器规 格Specification13244*10605材 质Material16MnR 20MnMo工作介质Medium壳程:水蒸汽 管程:H2N2NH3CH4Ar 压 力Pressure壳程:3.0MPa 管程:31.4MPa温 度Temperature壳程:40C管程:100C执行标准Stan
7、dard for executionGB150-1998GB6654-1996检 查 项 目Inspection item等级Grade签名/日期Signature/date施工单位Subcontractor监理单位Contractor 建设单位Owner设备及附件接收检查Acceptance of equipment & accessoriesC基础复检Check of foundationC找正AlignmentC灌浆前检查Inspection before groutingA内件安装Installation of internalsA严密性试验Air-tightness testAR抽芯
8、试压Core withdrawal and pressure testAR附件安装Installation of accessoriesC平台、扶梯、护栏安装Erection of platform, stair & guardrailC卧式设备滑动端检查Check of sliding end of horizontal equipmentB附注:Note表H-215 Tab.容器、换热器安装工序质量控制表Quality control table for installing procedures of vessel and heat-exchanger项目:晋丰集团(闻喜)1830 Pr
9、oject:项目装置: 双甲合成Unit工号:Section位 号Location No.E1703B名 称Name合成水冷器规 格Specification13244*10605材 质Material16MnR 20MnMo工作介质Medium壳程:水蒸汽 管程:H2N2NH3CH4Ar 压 力Pressure壳程:3.0MPa 管程:31.4MPa温 度Temperature壳程:40C管程:100C执行标准Standard for executionGB150-1998GB6654-1996检 查 项 目Inspection item等级Grade签名/日期Signature/date施
10、工单位Subcontractor监理单位Contractor 建设单位Owner设备及附件接收检查Acceptance of equipment & accessoriesC基础复检Check of foundationC找正AlignmentC灌浆前检查Inspection before groutingA内件安装Installation of internalsA严密性试验Air-tightness testAR抽芯试压Core withdrawal and pressure testAR附件安装Installation of accessoriesC平台、扶梯、护栏安装Erection of platform, stair & guardrailC卧式设备滑动端检查Check of sliding end of horizontal equipmentB附注:Note表H-215 Tab.容器、换热器安装工序质量控制表Quality control table for installing procedures of vessel and heat-exchanger项目:晋丰集团(闻喜)1830 Project:项目装置: 双甲合成Unit工号:Section位 号Location No.E1704名 称Name冷凝蒸发分离器(I)规 格Specification