产品实现策划管理程序

上传人:我*** 文档编号:127241895 上传时间:2020-03-31 格式:DOC 页数:7 大小:117.50KB
返回 下载 相关 举报
产品实现策划管理程序_第1页
第1页 / 共7页
产品实现策划管理程序_第2页
第2页 / 共7页
产品实现策划管理程序_第3页
第3页 / 共7页
产品实现策划管理程序_第4页
第4页 / 共7页
产品实现策划管理程序_第5页
第5页 / 共7页
点击查看更多>>
资源描述

《产品实现策划管理程序》由会员分享,可在线阅读,更多相关《产品实现策划管理程序(7页珍藏版)》请在金锄头文库上搜索。

1、videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the five water treatment 357 timetables for three years to resolve outstanding issues, obviously worked, victory of the year. The Countys departments at all levels must firmly establish the guanghui is gold

2、and silver green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well five water treatment of winning the war, ever-higher levels of comprehensive well-off society was built. (A)

3、 lay the sewage uphill battle. This year we will river water quality improved at the county level, up to five this basic objective grasp of pollution control that focus, with the focus on three things: a good job, clear rivers reaching the County created. Organization look back special inspection, t

4、he County garbage River, black and odorous River is Dragnet investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the one-stop strategy, improving the inferior five water quality monitoring stations work this year to ensure the E

5、limination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of clear rivers standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water

6、source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve effluent from sewage treatment rate, running accuracy, compliance requirement, speed up the towns support network construction, is focusing on nanotubes home last meters question. Do

7、mestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural dom

8、estic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the Sun problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to dig up mud

9、, as the deepening water of this years plays. Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policy requires detailed cleaning, dredging plan, planning ahead of time cleaning out

10、mud way out, according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intens

11、ity of Q/COFMC-1009-2008 杭州中粮包装有限公司程序杭州中粮美特容器有限公司程序 Q/COFMC-1009-2008产品实现策划管理程序起草 谭振亚 审核 林邦辉 批准 周 政 2008/01/15实施杭州中粮包装有限公司发布杭州中粮美特容器有限公司文件/资料修正履历表文件名称产品实现策划管理程序修改日期修改页次文件修改后版本号更改内容提要2008.01.15整版Q/COFMC-1009-2008中粮包装/中粮美特两家公司作ISO9001体系文件整合/1、 目的对公司产品从与客户有合作意向开始,直至最终产品交付后的技术服务的每一个环节都有明确的控制和管理,确保产品满足客户

12、及食品安全和相关法律、法规的需求。2、 范围公司所有产品。3、 工作程序及相关部门职责3.1 在销售部与客户联系有合作意向或潜在合作意向时,即应获取客户的需求资料,同时联络品质管理部、工艺技术部、印前部、包装设计室等相关部门进行技术准备。a. 工艺技术部根据客户产品需求,进行新材料使用或立项开发、并最终制定客户的产品标准和产品工艺。b. 品质管理部根据客户产品内容物性质进行包装适宜性试验。c. 包装设计室根据客户需求对印刷图案/版面进行设计或修改,交客户确认。d. 印前部根据客户需求制作铁样并交客户确认,及其进行样张、菲林、PS板的管理。3.2 在签订正式合同前,销售部应按照合同评审控制程序了

13、解客户的基本要求,工艺技术部配合销售部完成对客户技术要求的确认。3.3 根据确认情况,销售部组织相关部门依合同评审控制程序,对合同(商务条款、技术要求等)内容进行评审。通过合同评审,由销售部与客户签订正式合同;未通过评审部分,与客户沟通解决。3.4 在与客户签订合同后,销售部应明确客户的具体订单需求,据此向生产计划部、工艺技术部下达销售生产指令。当客户有特殊或指定物料要求时,销售部应将相关需求及时联系相关部门评审,落实采购中心进行物料的采购准备。3.5 生产计划部和工艺技术部根据销售生产指令分别依生产计划控制程序、技术工艺控制程序制定生产计划、生产指令、工艺规程指令,并下达至制造、品控等相关部

14、门。3.6 工厂根据生产计划、生产指令、工艺要求进行生产,并负责过程控制。3.7 品控部根据检验规程和工艺标准要求进行过程检验及过程产品质量标识。3.8 品质管理部根据检验规程和工艺标准要求进行成品出货检验。3.9 经检验合格产品由储运部入库/防护;不合格产品根据不合格品控制程序处理。3.10 根据客户需求,由销售部下达发货指令通知发货。由储运部联系承运商将产品交付客户,并对装卸和承运商进行管理和监督。3.11 在与客户合作过程中,如客户有需要,销售部应联系品质管理部,由品质管理部组织向客户提供技术支持;在产品交付后,客户有质量抱怨,由品质管理部组织处理客户抱怨和投诉;按计划由品质管理部配合销售部对客户进行回访和客户满意度调查、情况反馈。3.12对于奶粉罐的生产过程,必须制定对应的前提方案、操作性前提方案及HACCP计划4 生产过程工序控制计划4.1 印涂铁工艺控制计划马口铁、涂料、油墨 涂料*或印刷* 烘干* 包装n个PASS印刷图案 菲林制作 样张制作 PS板制作4.2 制罐工艺控制计划(制罐)涂印铁 剪切 焊接* 补涂 烘干 缩颈翻边 卷封* 全喷烘干 检漏 包

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 办公文档 > 事务文书

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号