双线自动滋润油机(培训)

上传人:TH****3P 文档编号:119373943 上传时间:2020-01-13 格式:PPT 页数:46 大小:45.60MB
返回 下载 相关 举报
双线自动滋润油机(培训)_第1页
第1页 / 共46页
双线自动滋润油机(培训)_第2页
第2页 / 共46页
亲,该文档总共46页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《双线自动滋润油机(培训)》由会员分享,可在线阅读,更多相关《双线自动滋润油机(培训)(46页珍藏版)》请在金锄头文库上搜索。

1、aus Patentschrift Nr. 556 917,The worlds first two-line system, (HELIOS HA) today world standard, was born in our company. In 1928 we received THE patent no. 556917 for it.,The two-line system supplies the friction point with lubricant via two main lines that are alternatively pressurized. From the

2、main lines, branch lines lead to the metering devices. A change-over valve and end-of-line pressure switches ar used to alternatively pressurize and relieve the main lines.,The main parts of a two-line system are,Pipe to the friction points,Electric control box,Two-line System,End-of-line pressure s

3、witch,Main lines,Pressure line,Change-over Valve,Pump,Metering Devices,to the friction point,Reliefe line,Stichleitungen branch lines,Range of Applications,Central supply of widely spread lubrication points of lubrication points with different lubrication requirements of lubrication points on machin

4、es where machine groups are individually shut down of lubrication points with permanent high bearing backpressure,Characteristics of HELIOS Two-line Systems, Optimum monitoring and control possibility If a bearing clogs or a metering device outlet fails to function, all other outlet pairs will conti

5、nue to function normally Simple metering of lubricant per outlet pair Problem-free readjustment of metered lubricant output after installation Readily extendible High guarantee of function,Two-line Systems,3 Systems 1235 lube points,1 System 280 lube points,Schaufelradbagger 285 RBW Germany Bucket W

6、heel Excavator 285 RBW,Superstructure 4 Lube cycles Transport way Bucket wheel boom Crusher Lifting gear,Main line total 624 m 1248 m tube 30 x 3,3 Systems 1235 lube points,X,BLAST FURNACES,X,Hot Strip and Plate Mills,Haindl Paper, Augsburg Germany PM 3 LWC Offset Screen Width: 10.45 m Length: appro

7、x. 120 m Velocity: 2000 m/ min,Port Equipment,Functional Description,relief line,change-over valve,metering device,main lines,pressure line,central lubrication pump,end-of-line pressure switch,to the friction points,branch lines,metering device,1. Half Cycle,Functional Description,relief line,change

8、-over valve,metering device,main lines,pressure line,central lubrication pump,end-of-line pressure switch,to the friction points,branch lines,metering device,1. Half Cycle,Functional Description,relief line,change-over valve,metering device,main lines,pressure line,central lubrication pump,end-of-li

9、ne pressure switch,to the friction points,metering device,branch lines,1. Half Cycle,Animation,Functional Description,relief line,end-of-line pressure switch,change-over valve,lubricant metering device,main line,central lubrication pump,pressure line,to the friction points,branch lines,2. Half Cycle

10、,Animation,Functional Description,relief line,end-of-line pressure switch,change-over valve,lubricant metering device,main line,central lubrication pump,pressure line,to the friction points,branch lines,2. Half Cycle,Functional Description,relief line,change-over valve,metering device,main lines,pre

11、ssure line,central lubrication pump,end-of-line pressure switch,to the friction points,branch lines,metering device,3. Half Cycle,Functional Description,relief line,change-over valve,metering device,main lines,pressure line,central lubrication pump,end-of-line pressure switch,to the friction points,

12、metering device,branch lines,3. Half Cycle,Animation,Functional Description,relief line,end-of-line pressure switch,change-over valve,lubricant metering device,main line,central lubrication pump,pressure line,to the friction points,branch lines,4. Half Cycle,4. Half Cycle,Animation,Functional Descri

13、ption,relief line,end-of-line pressure switch,change-over valve,lubricant metering device,main line,central lubrication pump,pressure line,to the friction points,branch lines,Note: End-of-line pressure switch should be located before the last metering device. This prevents the grease from hardening

14、in the line,A,B,A,B,A,B,Cycle 1,Cycle 2,CONTROL UNIT,CONTROL UNIT,FROM PUMP,TO PUMP RESERVoiR,PAUSE TIME CYCLE I and II,I A,I B,II B,II A,to the friction points,Frictionpoints with a smaller amount ?,to the friction points,Two-line System w. secondary SSV Dividers,QUICKLUB - Progressive Metering Dev

15、ice for Grease & Oil Type SSV,Sectional View,Piston side,Outlet side,Piston detector,Compression volume : normal grease 1% - 1,5% bad grease 2% (many air bubbles in the grease),Rheometer Curve Grease : KP2K Temperature : 20 C,Pressure loss p.m Druckverlust p.M.,Rheometer Curve Grease : KP2K Temperat

16、ure : 0 C,Pressure loss p.m Druckverlust p.M.,Rheometer Curve Grease : KP2K Temperature : -10 C,Pressure loss p.m Druckverlust p.M.,Rheometer Curve Grease : KP2K Temperature : -20 C,Pressure loss p.m Druckverlust p.M.,Lubricant Flow within the SSV,Phase 2,Phase 3,Phase 4,Phase 5,Phase 1,Pumps,HJ 2,ZPU01/02

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 电子/通信 > 电子电气自动化

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号