1、1 General1.1 The installation manual is only used for the installation,debugging and testing of SF85-18/5850 vertical shaft hydroelectric generator supplied by Dong Fang Electrical Machinery Co.,Ltd(here in after referred as DEC)on the project site.1.2 The installation manual primarily describes the

2、 general installation procedure and requirement for hydroelectric generator. It is not intended to describe the detailed installation procedure for each individual part. 1.3 Installation for all parts should be performed under the direction of the DEC site Technical Director according to the require

3、ment of the technical documents accompanying the unit.1.4 According to actual installation condition on site, the DEC site Technical Director will modify installation procedure or requirement for some part by technical requisition, so that the installation would be done smoothly. 1.5 Without the agr

4、eement of the DEC site Technical Director, no adding, canceling or altering the requirement of the technical documents sent along with unit.1.6 Before comprehend the method and procedure of the installation manual or technical requirement of the other technical documents sent along with unit, Instal

5、lation Contractor should not start the installation, in order to avoid reworking.1.7 If somebody can not understand completely the installation manual or have some different view for the installation manual, please consult with the DEC site Technical Director. 1.8 For some part, if there is not spec

6、ial requirement in the installation manual or the other technical documents sent along with unit, the installation must accord withspecification installation of hydraulic turbine generator units(GB/T8564-2003); and if the requirement is different between technical documents sent along with unit, Ins

7、tallation Contractor should report to Supervisor or Customer and consult with the DEC site Technical Director to deal with.1.9 After finishing each installation procedure, the installation records must be filled in the QCR, and submit the QCR to the DEC site Technical Director in time. at the time,

8、Installation Contractor should be in charge of truthness and precision of records, and only after the records are confirmed and signed by the DEC site Technical Director, the next procedure can be done.1.10 In the course of debugging and trial run for the unit, Installation Contractor should record

9、the data of test and trial run detailly. After trial run has been finished, Customer shall submit the whole installation, debugging and trial run records to the DEC site Technical Director, which will be used as basis of inspecting and accepting for the unit.2 Acceptance and storage 2.1 Acceptance2.

10、1.1 After the equipment has been transported to the delivery site, check and acceptance for the equipment should be taken in term of the contract in time.2.1.2 Before unload the equipment, Customer should check whether the packing cases of the equipment are in good condition, if find there is any lo

11、ss and damage occurred during transportation, Customer should contact immediately with the transportation agent and the Insurance Agent, mark down and record it in visual image, and inform in time. at the same time, Customer should offer the certificate proved by the transportation agent and the Ins

12、urance Agent to Produce Contractor, in order that Produce Contractor supply again and claim for compensation.2.1.3 After receiving cargo, Customer should convene the relative units to check and accept according to the delivery list and packing list offered by Produce Contractor within the stated tim

13、e of contract, and make the summary of check and acceptance, and the representatives of both parties of Customer and Produce Contractor must sign the summary of check and acceptance. Before both parties of Customer and Produce Contractor perform check and acceptance together, Customer should not ope

14、n the packing cases privately. Under the special condition, Customer should contact with Produce Contractor in advance, and get the agreement of Produce Contractor, Customer can open the packing cases by oneself.2.1.4 Antirust material on the finish surface of parts should not be removed before inst

15、allation. When check and acceptance, if find there is dent on the finish surface of parts or antirust material on the finish surface of parts has fallen off, remaining antirust material should be got rid of with organic solvent, then recoat antirust material again, and forbid using scraper or sandpa

16、per, etc which would damage the finish surface of parts to get rid of antirust material on the finish surface of parts. Before taking any action for any finish part, Customer must consult with the representative of DEC.2.1.5 For the assembled parts, If find its some components had been lacked or damaged when check and acceptance, Produce Contractor should be in charge of dealing with, and if the components had been lacked or