外文文献--HEAVY VEHICLE OVERLOAD CONTROL IN THE CITY OFTSHWANE城市中重型车辆超载控制 英文版

上传人:新** 文档编号:570156233 上传时间:2024-08-02 格式:PDF 页数:9 大小:488.94KB
返回 下载 相关 举报
外文文献--HEAVY VEHICLE OVERLOAD CONTROL IN THE CITY OFTSHWANE城市中重型车辆超载控制 英文版_第1页
第1页 / 共9页
外文文献--HEAVY VEHICLE OVERLOAD CONTROL IN THE CITY OFTSHWANE城市中重型车辆超载控制 英文版_第2页
第2页 / 共9页
外文文献--HEAVY VEHICLE OVERLOAD CONTROL IN THE CITY OFTSHWANE城市中重型车辆超载控制 英文版_第3页
第3页 / 共9页
外文文献--HEAVY VEHICLE OVERLOAD CONTROL IN THE CITY OFTSHWANE城市中重型车辆超载控制 英文版_第4页
第4页 / 共9页
外文文献--HEAVY VEHICLE OVERLOAD CONTROL IN THE CITY OFTSHWANE城市中重型车辆超载控制 英文版_第5页
第5页 / 共9页
点击查看更多>>
资源描述

《外文文献--HEAVY VEHICLE OVERLOAD CONTROL IN THE CITY OFTSHWANE城市中重型车辆超载控制 英文版》由会员分享,可在线阅读,更多相关《外文文献--HEAVY VEHICLE OVERLOAD CONTROL IN THE CITY OFTSHWANE城市中重型车辆超载控制 英文版(9页珍藏版)》请在金锄头文库上搜索。

1、 20th South African Transport Conference South Africa, 16 20 July 2001 Meeting the Transport Challenges in Southern Africa Organised by: Conference Planners Conference Papers Produced by: Document Transformation Technologies HEAVY VEHICLE OVERLOAD CONTROL IN THE CITY OF TSHWANE K PILLAY and DR. J BO

2、SMAN1 Transportation Planning, Tshwane Metropolitan Municipality P.O. Box 6338, Pretoria, 0001 Phone: 072 219 2136, Fax: 012 328 5137, E-mail: kpillaygpmc.org.za 1 Director, V3 Consulting Engineers Abstract Overloaded heavy vehicles decrease the life span of the road structure with added costs for m

3、aintenance and rehabilitation of the road pavement. The management and protection of the road network is necessary, while maintaining the economic base of the freight industry. While hauliers profit from weak law enforcement, overloaded vehicles are damaging roads, the annual road budget in real ter

4、ms is diminishing and the condition of roads is deteriorating. The premature deterioration of infrastructure inevitably compromises road safety, and adds to the high fatality rate on South African roads. As this continues, the long-term consequences are serious and its impact on the economy is the i

5、rony. Pavement Management Systems data for the City of Tshwane revealed significant deterioration of the road infrastructure, considerably at the road freight generators such as industrial areas. In 1998, the pre-feasibility study on the Strategy of Freight Transport Impact Management in the Greater

6、 Pretoria Metropolitan Council Area GPMC (now Tshwane Metropolitan Municipality) was completed. Twenty-two sites were identified to function as heavy vehicle overloading control points. In 1999 a pre-feasibility study on the Construction and Operation of Truck Control Stations in the GPMC Area on a

7、Public Private Partnership basis was completed. It was initially intended for the feasibility and implementation phases to be carried out on a public-private partnership basis. However, the Municipal Infrastructure Investment Unit advised that without the feasibility study the project was not financ

8、ially viable. The paper discusses the way forward which includes the administration of the feasibility planning, and a strategy to optimise the existing infrastructure and resources. The paper then describes the procurement procedure as stipulated in the Procedural Guidelines for Implementation and

9、Processing of Municipal Service Partnerships for the GPMC. 1. Introduction The Moving South Africa (South African transport strategy leading to 2020) study addressed freight transportation, amongst other transportation subjects. The relevant strategies include building density in the transport syste

10、m through focusing freight flows in select corridors and ensuring sufficient reinvestment to maintain quality infrastructure and operations. In 1998, a pre-feasibility study, Strategy of Freight Transport Impact Management in the Greater Pretoria Metropolitan Area (now Tshwane Metropolitan Municipal

11、ity) was completed. One of the options to implement an overload control strategy was through a Municipal Service Partnership (MSP). Therefore, in 1999 a feasibility study on the construction and operation of truck control stations in the Greater Pretoria Metropolitan area on a MSP basis, including t

12、he development of a MSP policy for transportation infrastructure and services was completed. The reports included: The status quo on road and rail freight in the Greater Pretoria area. The adverse effects of overloaded heavy vehicles on the road pavement. A Municipal Service Partnership (a derivativ

13、e of Public Private Partnerships) policy and procedural guideline. The economic feasibility of heavy vehicle overloading control in conjunction with an Intelligent Transport System (ITS). A discussion document, Overload Control on a Municipal Services Partnership Basis: A Pre-feasibility Study was c

14、ompleted in September 2000 and was part of the freight chapter of the Integrated Transport Plan of the Tshwane Metropolitan Municipality. Road freight transportation compliments the movement of goods from the various seaports and airports in and around Southern Africa. The development of the Maputo

15、Corridor (a toll road from South Africa to Mozambique), Mabopane Centurion Development Corridor (Western by-pass of Pretoria), and the N4 Platinum Toll Highway (Northern by-pass of Pretoria to Botswana) provides additional access for road freight transportation through the Tshwane Metropolitan Munic

16、ipality area. Overloaded heavy vehicles decrease the life span of the road structure with added costs for maintenance and rehabilitation of the road pavement. The premature deterioration of infrastructure inevitably compromises road safety, and adds to the high fatality rate on South African roads.

17、While hauliers profit from weak law enforcement, overloaded vehicles are damaging roads, the annual road budget in real terms is diminishing and the condition of roads is deteriorating. As this continues, the long-term consequences are serious and its impact on the economy is the irony. The manageme

18、nt and protection of the road network is necessary, while maintaining the economic base of the freight industry. Until recently, there were many debates and desperate pleas from officials to National government to provide additional funding and efficient law enforcement for heavy vehicle overloading

19、 control in South Africa. A concurrent constraint in overloading control is that the National Department of Transportation does not have an official heavy vehicle overloading statistics reporting system. However, the Centre for Scientific and Industrial Research (CSIR) have a far more representative

20、 database from weighbridge operations, but does not cover the whole of South Africa. Without comprehensive accurate statistics it is not possible to develop proper overloading control strategies (1). In 1995, approximately 20 percent of heavy vehicles were overloaded on South African National roads,

21、 resulting in only 9 percent of the national road network classified in good condition. Overloading statistics for 1999, prepared by the CSIR for Gautrans (Gauteng Provincial Department of Transportation), showed 52 percent of 14 700 vehicles weighed at 41 stations in Gauteng, were overloaded. There

22、 are approximately 35 000 heavy vehicles of gross vehicle mass greater than 5.5 tons operating in the Tshwane Metropolitan Municipality jurisdiction. Within the Tshwane Metropolitan Municipality area, only Centurion implements heavy vehicle overloading control effectively. In 1999, 80 percent of 826

23、 vehicles weighed at the Nellmapius Road weigh station in Centurion were overloaded. Recently (2000-2001), the provinces of Kwazulu Natal and Gauteng implemented overload control initiatives on mostly National routes. The facilities included permanent weighbridges, accommodation for law enforcement

24、officers, and holding facilities for overloaded vehicles. There were even explicit warnings in the media in the respective provinces. The focus of this paper is concerned on the Overload Control Strategy for the Tshwane Metropolitan Municipality area. Lower order roads are under stress due to overlo

25、aded vehicles deviating onto Metropolitan routes. Pavement Management Systems data for the Tshwane Metropolitan Municipality revealed significant deterioration of the road infrastructure, considerably at the road freight generators such as industrial areas. Overloaded freight vehicles further aggrav

26、ate the lack of funds to maintain and upgrade roads in the Tshwane Metropolitan Municipality area. Regarding overloading, the Tshwane Metropolitan Municipality is thus faced with the problem to find sufficient funds to control the overloading which will then result in a saving on the road maintenanc

27、e budget. Thus, there was the urgent need to develop and implement an overload control with the ultimate objective to reduce the financial and economic impact of pavement deterioration in the Tshwane Metropolitan Municipality. 2. Municipal Service Partnerships The roles of the public and private sec

28、tors have changed dramatically over the past 20 years as a result of intense pressure on public sector revenues and increasing competition in the private sector. In developing countries in particular, meeting basic needs and providing poverty-relief measures tend to take precedence over more sophist

29、icated infrastructure and services that are nevertheless vital for economic prosperity and improved quality of life. The other drawback in such countries, apart from the general lack of funds, is the shortage of the necessary expertise at their disposal. South African municipalities face the challen

30、ge of delivering affordable services of an acceptable quality to residents on an equitable and sustainable basis within the context of limited financial and human resources. Many successful local authorities around the world are responding to this challenge by exploring Municipal Service Partnership

31、s (MSP) as a way to enhance service delivery. This approach uses the expertise, investment and management capacity of the private sector to develop infrastructure as well as to improve and extend efficient services. Thus Municipal Service Partnerships, as contained in the Municipal Systems Bill for

32、South Africa, is a paradigm shift in service delivery. Municipal Service Partnerships can take various forms. At one end of the spectrum, government contracts with a private company for the overall management of a facility, and at the other, there is the ownership and operation of commercial facilit

33、ies by the private sector (privatisation). In the first case, the private company has full responsibility for the operation of the facility but it operates within guidelines set by the public sector owner. This can be done through a service contract, a management contract, or a lease. At the other e

34、nd of the spectrum, within the framework of private ownership, there are several models, such as: Build, Operate and Transport (BOT) Build, Own and Operate (BOO) Build, Own, Operate and Transfer (BOOT) Build, Operate, Train and Transport (BOTT) Build, Transfer and Lease (BTL) Build and Transfer (BT)

35、 Rehabilitate, Operate and Transfer (ROT) For example, the Western Cape Department of Transport is operating eight weighbridges, but have a shortage of traffic officers. The Department outsourced manpower from the private sector, as well as management and technical support for a pilot project effect

36、ive April 2000. Once a suitable system of operation is finalised, all eight weighbridges of the Department should be tendered to the private sector. Private sector companies providing outsourced manpower for a weighbridge is contractually obligated to meet minimum performance measures, as a result o

37、f improved overall efficiency of the overload control system (1). 3. Tshwane Overload Control Strategy The most economic and realistic solution to the overloading problem seems to be the use of a comprehensive and effective law enforcement programme. According to Slavik (2) such a programme should c

38、onsist of three elements viz., high apprehension rate, hurtful penalties, and successful prosecution. To achieve a high apprehension rate, the law enforcement must be intensive and effective. A network of strategically placed control points, some permanent, some mobile, should operate at all times.

39、Potential violators as a high probability of being caught should perceive the effect of the operation. When considering the consequences, the violators should decide that the risk is not worth taking. This attitude would reduce overloading, which is currently practised by many hauliers as a lucrativ

40、e transport policy, to a considerably smaller residual level, with only infrequent cases of incidental overloading. Law enforcement should be selective, concentrating with priority on recurrent violators, and on the most afflicted roads. The operation should use uniform procedures, be well co-ordina

41、ted countrywide, and harmonised with practices in neighbouring countries. In principle, the contribution to success of a high apprehension rate is much greater than that of penalties. A penalty is sufficiently hurtful when it cannot be regarded as a business proposition. Increasing the penalties bey

42、ond the magnitude is unlikely to add more power to law enforcement. Although the fines have increased to R120 000, practice shows that a temporary impounding of an overloaded vehicle, together with a need to rectify the load, is feared by the truckers far more than the fine. At present, the penalty

43、structure is not a problem; the law apprehension rate and unsuccessful prosecution is. Successful prosecution, resulting in the conviction of offenders should crown the effort spent on apprehension. Much work is still to be done in this field. Currently, many cases have been lost because of technica

44、lities usually related to the Trade Metrology Act and the questionable accuracy of truck scales and also because of magistrates who do not always appreciate the negative impact overloading of trucks have on the economy and society (2). In order to implement a law enforcement programme which can effe

45、ctively control overloading in the Tshwane Metropolitan Municipality area it was proposed that a cordon based network of truck overload control stations (TOCSs) be built. The proposed cordons are shown in Figure 6. Two cordons, an outer one roughly following the Tshwane Metropolitan Municipality bou

46、ndary, and an inner cordon, were proposed. The outer cordon could accommodate through freight movement, external freight movement and internal-external freight movements. The inner cordon is able to control internal freight movement and also act as a “safety net” for trucks missed by the outer cordo

47、n. If necessary a third cordon, an inner city one, can be considered at a later stage. A total of 12 truck control weigh stations were proposed on the outer cordon and 10 on the inner cordon. A feasibility study was proposed which includes the collection, accumulation, and analysis of comprehensive

48、traffic data at the 22 control points. From the data, a strategy for permanent, temporary, and screening weigh stations could be finalised. The possible model for overloading control in the Tshwane Metropolitan Municipality could be build and rehabilitate, operate, and transfer permanent and tempora

49、ry facilities at strategic points on the primary road network of Tshwane. The Municipal Infrastructure Investment Unit (MIIU) was approached for advice and funding. (The MIIU is a section 21 Company established by the government to help municipalities find innovative solutions to critical problems w

50、ith the financing and management of essential municipal services such as water supply, sanitation, waste, energy, transport, etc. These solutions include the involvement of new parties in service delivery, in various forms of public/private, partnership arrangements.) The MIIU revealed some major co

51、ncerns: From a financial viewpoint, the Municipality does not currently have the resources to implement this project or those resources are committed to other higher priorities. Certainly a Municipal Service Partnership (MSP) with private sector financing is an option but at present there is no secu

52、re income stream that will meet the conservative guarantees needed by South African banks to provide the needed capital financing. An annual Municipality budget allocation is subject to future political decisions. It was then realised that the Metropolitan Municipality and the Gauteng Provincial Dep

53、artment of Transportation (Gautrans) should consolidate their efforts and funds to carry out the feasibility study. The significance of this public-public venture is appropriate, as there is extensive overload control coverage on both Provincial and Metropolitan roads, including National routes too.

54、 The process includes the appointment of a technical facilitator who would assess the data and recommend the feasible overload control strategy for the City of Tshwane that includes an operational strategy, a strategy to upgrade and optimise existing infrastructure, capital costs, operating costs, t

55、he economies to scale on road maintenance saving, and the service cost to the Tshwane Metropolitan Municipality. Gautrans appointed the CSIR to monitor existing overload control points and to determine new control sites for Gauteng. Their database identified seven existing heavy vehicle overloading

56、control points in the Tshwane Metropolitan Municipality area. Hence, apart from the detailed traffic study of the 22 sections, existing weighbridges should also be included in the study. Some of these facilities are currently under-utilised and some not used at all. Two weigh stations are fully func

57、tional and only need additional equipment and manpower to monitor a larger geographical area. Existing and proposed new control stations are also indicated in Figure 6. 4. Optimising Existing Infrastructure ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) )

58、 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) )

59、 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) )

60、 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) )

61、 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) )

62、 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) )

63、 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) )

64、 ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) )000000000KiltKiltKiltKiltKiltKilt2.52.52.52.52.52.52.52.52.5( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( (555555555SILVERTONSILVERTONSILVERTONSILVERTONSILVERTONSILVERTONSILVERTO

65、NSILVERTONSILVERTONKILNERKILNERKILNERKILNERKILNERKILNERKILNERKILNERKILNERPARKPARKPARKPARKPARKPARKPARKPARKPARKWALTLOOWALTLOOWALTLOOWALTLOOWALTLOOWALTLOOWALTLOOWALTLOOWALTLOOPRETORIAPRETORIAPRETORIAPRETORIAPRETORIAPRETORIAPRETORIAPRETORIAPRETORIAINDUSTRIALINDUSTRIALINDUSTRIALINDUSTRIALINDUSTRIALINDUST

66、RIALINDUSTRIALINDUSTRIALINDUSTRIALKIRKNEYKIRKNEYKIRKNEYKIRKNEYKIRKNEYKIRKNEYKIRKNEYKIRKNEYKIRKNEYHERMANSTADHERMANSTADHERMANSTADHERMANSTADHERMANSTADHERMANSTADHERMANSTADHERMANSTADHERMANSTADSUNDERLANDSUNDERLANDSUNDERLANDSUNDERLANDSUNDERLANDSUNDERLANDSUNDERLANDSUNDERLANDSUNDERLANDRIDGERIDGERIDGERIDGERID

67、GERIDGERIDGERIDGERIDGESIMARLOSIMARLOSIMARLOSIMARLOSIMARLOSIMARLOSIMARLOSIMARLOSIMARLOM1M1M1M1M1M1M1M1M1R55R55R55R55R55R55R55R55R55R55R55R55R55R55R55R55R55R55R21R21R21R21R21R21R21R21R21R50R50R50R50R50R50R50R50R50N1N1N1N1N1N1N1N1N1N4N4N4N4N4N4N4N4N4N4N4N4N4N4N4N4N4N4N14N14N14N14N14N14N14N14N14N1N1N1N1

68、N1N1N1N1N1562562562562562562562562562R101R101R101R101R101R101R101R101R101104104104104104104104104104M10M10M10M10M10M10M10M10M10513513513513513513513513513566566566566566566566566566101101101101101101101101101514514514514514514514514514513513513513513513513513513573573573573573573573573573M35M35M35M3

69、5M35M35M35M35M35M26M26M26M26M26M26M26M26M26LYNNWOOD RIDGELYNNWOOD RIDGELYNNWOOD RIDGELYNNWOOD RIDGELYNNWOOD RIDGELYNNWOOD RIDGELYNNWOOD RIDGELYNNWOOD RIDGELYNNWOOD RIDGEGARSFONTEINGARSFONTEINGARSFONTEINGARSFONTEINGARSFONTEINGARSFONTEINGARSFONTEINGARSFONTEINGARSFONTEINEERSTERUSTEERSTERUSTEERSTERUSTEE

70、RSTERUSTEERSTERUSTEERSTERUSTEERSTERUSTEERSTERUSTEERSTERUSTELARDUSELARDUSELARDUSELARDUSELARDUSELARDUSELARDUSELARDUSELARDUSPARKPARKPARKPARKPARKPARKPARKPARKPARKBROOKLYNBROOKLYNBROOKLYNBROOKLYNBROOKLYNBROOKLYNBROOKLYNBROOKLYNBROOKLYNLYTTELTONLYTTELTONLYTTELTONLYTTELTONLYTTELTONLYTTELTONLYTTELTONLYTTELTO

71、NLYTTELTONATTERIDGEVILLEATTERIDGEVILLEATTERIDGEVILLEATTERIDGEVILLEATTERIDGEVILLEATTERIDGEVILLEATTERIDGEVILLEATTERIDGEVILLEATTERIDGEVILLEPRETORIAPRETORIAPRETORIAPRETORIAPRETORIAPRETORIAPRETORIAPRETORIAPRETORIANORTHNORTHNORTHNORTHNORTHNORTHNORTHNORTHNORTHMAMELODIMAMELODIMAMELODIMAMELODIMAMELODIMAMELOD

72、IMAMELODIMAMELODIMAMELODIRISSIKRISSIKRISSIKRISSIKRISSIKRISSIKRISSIKRISSIKRISSIKCENTURIONCENTURIONCENTURIONCENTURIONCENTURIONCENTURIONCENTURIONCENTURIONCENTURION6 66666 666777777777222222222G GGGGG GGGBB BBBBB BBCCCCCCCCC444444444EE EEEEE E EDD DDDDD DD5 55555 555H HHHHH HHHF FFFFF FFFK KKKKK KKKLL L

73、LLLL L L888888888101010101010101010111111111111111111MMMMMMMMMAAAAAAAAA121212121212121212333333333111111111ROOIHUISKRAALROOIHUISKRAALROOIHUISKRAALROOIHUISKRAALROOIHUISKRAALROOIHUISKRAALROOIHUISKRAALROOIHUISKRAALROOIHUISKRAALGATEWAYGATEWAYGATEWAYGATEWAYGATEWAYGATEWAYGATEWAYGATEWAYGATEWAYHIGHVELDHIGHV

74、ELDHIGHVELDHIGHVELDHIGHVELDHIGHVELDHIGHVELDHIGHVELDHIGHVELDKLERKSOORDKLERKSOORDKLERKSOORDKLERKSOORDKLERKSOORDKLERKSOORDKLERKSOORDKLERKSOORDKLERKSOORDROSSLYNROSSLYNROSSLYNROSSLYNROSSLYNROSSLYNROSSLYNROSSLYNROSSLYNAKASIAAKASIAAKASIAAKASIAAKASIAAKASIAAKASIAAKASIAAKASIAIRENEIRENEIRENEIRENEIRENEIRENEIREN

75、EIRENEIRENESINOVILLESINOVILLESINOVILLESINOVILLESINOVILLESINOVILLESINOVILLESINOVILLESINOVILLEAKASIAAKASIAAKASIAAKASIAAKASIAAKASIAAKASIAAKASIAAKASIAIRENEIRENEIRENEIRENEIRENEIRENEIRENEIRENEIRENE999999999FIGURE 6: PROPOSED NETWORK - TRUCK OVERLOAD CONTROL STATIONS (TOCSs)Heavy Vehicle Route BandsHazardo

76、us Material RoutesHeavy Vehicle Routes in GPMCNational RoutesRoads Prone To DamageLEGEND) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) )Boundary Cordon Stations) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) )Inner Cordon Stati

77、onsGPMC BoundaryIndustrial SitesArterial RoadsFreewaysMain RoadsSecondary RoadsInner City ITSInner CordonBoundary Cordon4.1 Provincial Weigh Bridges (Gautrans) The Boekenhoutkloof weighbridge is located about 25km to the west of Pretoria CBD in the vicinity of Hornsnek Road, and is utilised by the T

78、raffic College. Operation is not consistent. In November 1999, 1050 heavy vehicles were weighed, and from January to June 2000, only about 100 vehicles per month were weighed. The Donkerhoek weighbridge is located about 40km east of Pretoria in the vicinity of the N4, and is operated by the Gautrans

79、 Pretoria office. In September 1999, 550 heavy vehicles were weighed. The facility was since vandalised, and was restored in March 2001. The Wallmansthal weighbridge is a privately owned facility located about 50km north of Pretoria on the N1 and is contracted by Gautrans. This facility is under-uti

80、lised by the authorities. The CSIR also proposed a new facility for the Rosslyn industrial area, in the north-west of Pretoria. The facility was proposed in the Provincial Spatial Development Initiative at Rosslyn. 4.2 Local Authority Weigh Bridges The Centurion weighbridge is located about 20km sou

81、th of Pretoria at the Centurion vehicle-testing centre. This facility is thus far the most efficient and effective heavy vehicle overloading control centre in the Tshwane Metropolitan Municipality area. The centre also offers specialised training for officers in overloading control. The Pretoria wei

82、ghbridge is located in Pretoria West and is currently used for licensing purposes only. The Waltloo weighbridge is located in the east of Pretoria, in the vicinity of the Silverton and Waltloo industrial area, and is currently used for licensing purposes only. 5. The Way Forward It is necessary for

83、the Tshwane Metropolitan Municipality to implement a law enforcement programme preferably via a Municipal Services Partnership mechanism to minimise heavy vehicle overloading and to expedite prosecution of overloaded heavy vehicles in its jurisdiction. A detailed traffic investigation of the propose

84、d control points in Figure 6 should be carried out and a strategy should be in place. Currently the Tshwane Metropolitan Municipality and Gautrans are procuring funds to carry out the feasibility study. It is also envisaged that the South African National Road Agency Limited (SANRAL) also contribute

85、 to the project, since National roads are also covered in the study. However, thus far SANRAL is not willing to participate since it has already contributed massive investments in overloading control in Gauteng. In fact, SANRAs contributions to overload control are more than the mandatory contributi

86、on to the National Overload Control Fund. Concurrently, the National Overload Control Fund portion for Gauteng for the year 2000/2001 was utilised for the construction of a permanent overload control station at Heidelberg on the N3, approximately 60-km south-east of Johannesburg. Once an empirical o

87、verload control strategy is finalised, the process thereafter follows the procurement procedure as stipulated in the Procedural Guidelines for Implementation and Processing of Municipal Service Partnerships for the Tshwane Metropolitan Municipality. The detailed investigation will be discussed with

88、the Municipal Infrastructure Investment Unit (MIIU) on an advisory basis. The implementation of the overload control strategy should also actively involve Traffic Chief of the Tshwane Metropolitan Municipality. Further, the Department of Justice will also be involved to apply stringent measures to p

89、rosecute perpetrators and to raise the upper limit of fines for overloaded heavy vehicles. The current fines are not correlated to the damage caused to the road infrastructure, resulting in perpetrators willingness to pay small fines. 6. References 1. Sowman R. Situation Report on Heavy Freight Vehi

90、cle Overloading Control in South Africa, SARF 50th Anniversary Conference 2000. 2. Slavik, MM. Battle against Overloaded Trucks, Johannesburg 1995. HEAVY VEHICLE OVERLOAD CONTROL IN THE CITY OF TSHWANE K PILLAY and DR. J BOSMAN1 Transportation Planning, Tshwane Metropolitan Municipality P.O. Box 633

91、8, Pretoria, 0001 Phone: 072 219 2136, Fax: 012 328 5137, E-mail: kpillaygpmc.org.za 1 Director, V3 Consulting Engineers Resume of Kollan Pillay 1. A former resident of Verulam, north of Durban. 2. Graduated from Glenhaven Secondary School in Verulam, in 1991. 3. Graduated from University of Natal i

92、n 1995. 4. Employed by the National Department of Transport in 1996. 5. Graduated from Texas A&M University 1999. 6. Currently employed with the National Roads Agency in Pretoria. 7. Seconded to the Tshwane Metropolitan Municipality for experiential training in Transportation Planning and Road Construction. 8. Currently functioning as a resident engineer on the Upgrade of Dr Swanepoel Road north of Pretoria.