水库泥沙淤积的不确定因素分析--毕业设计外文翻译

上传人:大米 文档编号:562899054 上传时间:2023-11-04 格式:DOC 页数:12 大小:103KB
返回 下载 相关 举报
水库泥沙淤积的不确定因素分析--毕业设计外文翻译_第1页
第1页 / 共12页
水库泥沙淤积的不确定因素分析--毕业设计外文翻译_第2页
第2页 / 共12页
水库泥沙淤积的不确定因素分析--毕业设计外文翻译_第3页
第3页 / 共12页
水库泥沙淤积的不确定因素分析--毕业设计外文翻译_第4页
第4页 / 共12页
水库泥沙淤积的不确定因素分析--毕业设计外文翻译_第5页
第5页 / 共12页
点击查看更多>>
资源描述

《水库泥沙淤积的不确定因素分析--毕业设计外文翻译》由会员分享,可在线阅读,更多相关《水库泥沙淤积的不确定因素分析--毕业设计外文翻译(12页珍藏版)》请在金锄头文库上搜索。

1、外文翻译 Uncertainty Analysis Of Reservoir SedimentationAbstract: Significant advances have been made in understanding the importance of the factors involved in reservoir sedimentation. However, predicting the accumulation of sediment in a reservoir is still a complex problem. In estimating reservoir se

2、dimentation and accumulation, a number of uncertainties arise. These are related to quantity of streamflow, sediment load, sediment particle size, and specific weight, trap efficiency, and reservoir operation。In this study, Monte Carlo simulation and Latin hypercube sampling are used to quantify the

3、 uncertainty of annual reservoir sedimentation and accumulated reservoir sedimentation through time. In addition, sensitivity analysis was performed to examine the importance of various factors on the uncertainty of annual reservoir sedimentation. The proposed procedures have been applied to the Ken

4、ny Reservoir at the White River Basin in Colorado.The uncertainty of annual reservoir sedimentation and the effect of each uncertain factor, taken individually and in combinations, on the uncertainty of accumulated reservoir sedimentation through time have been examined. The results show that annual

5、 streamflow and sediment load are the most important factors determining the variability of annual reservoir sedimentation and accumulated reservoir sedimentation.In the case of Kenny Reservoir, the uncertainty expressed by the coefficient of variation can be on the order of 65% for annual reservoir

6、 sedimentation and 39% for accumulated reservoir sedimentation volume.IntroductionReservoir sedimentation varies with several factors such as sediment production, sediment transportation rate, sediment type, mode of sediment deposition, reservoir operation, reservoir geometry, and streamflow variabi

7、lity. Sediment is transported as suspended and bed loads by streams and rivers coming into a reservoir. Due to flow deceleration when a river approaches a reservoir, the sediment transport capacity decreases,and some of the incoming sediment is trapped and deposited in the reservoir. In addition, th

8、e deposited sediments may consolidate by their weight and the weight of overlying water through time. Predicting the sediment coming into a reservoir,its deposition, and its accumulation throughout the years, after construction of the dam, have been important problems in hydraulic engineering. Despi

9、te the advances made in understanding several of the factors involved in reservoir sedimentation, predicting the accumulation of sediment in a reservoir is still a complex problem. Empirical models, based on surveys and field observations, have been developed and applied to estimate annual reservoir

10、 sedimentation load (RSL), accumulated reservoir sedimentation load, (ARSL), and accumulated reservoir sedimentation volume (ARSV) after a given number of years of reservoir operation. Likewise, several mathematical models for predicting reservoir sedimentation have been developed based on the equat

11、ions of motion and continuity for water and sediment.However,empirical methods are still widely used in actual engineering practice.In estimating resevoir sediment inflow, reservoir sedimentation,and reservoir sediment accumulation, either by empirical or analytical approaches, a number of uncertain

12、ties arises.The main factors affecting reservoir sedimentation are (1)quantity of streamflow; (2) quantity of sediment inflow into a reservoir;(3) sediment particle size; (4) specific weight of the deposits; and (5) reservoir size and operation. Depending on the particular case at hand, some factors

13、 may be more important than others. All of these factors are uncertain to some degree and, as a consequence, reservoir sedimentation will be an uncertain quantity too.In addition, which model (or procedure) is applicable to estimate some of the foregoing quantities and, in fact, which model is to be

14、 used to estimate the amount of sediment that will be trapped in a reservoir are questions that cannot be answered with certainty. For instance, Fan (1988) obtained information on 34 stream-,18 watershed-, and 20 reservoir-sedimentation models and stated that different models may give significantly

15、different results even when using the same set of input data. Such an additional factor, known as model uncertainty, may be quite a large component of the overall uncertainty. In any case, the planner and manager of a reservoir may be interested in quantifying how the uncertainty of some of the fact

16、ors affecting reservoir sedimentation translate into the uncertainty of annual sediment deposition and accumulated sediment deposition through time.In this paper, we address the issue quantifying the effect of parameter uncertainty on reservoir sedimentation based on a set of predefined models as will be described below.The effect of model uncertainty is not considered in this study.Several methods of uncertainty analysis have been developed and applied in water resources engin

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 建筑/环境 > 施工组织

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号