产品研发合同英文版.docx

上传人:m**** 文档编号:559037297 上传时间:2024-02-18 格式:DOCX 页数:15 大小:25.88KB
返回 下载 相关 举报
产品研发合同英文版.docx_第1页
第1页 / 共15页
产品研发合同英文版.docx_第2页
第2页 / 共15页
产品研发合同英文版.docx_第3页
第3页 / 共15页
产品研发合同英文版.docx_第4页
第4页 / 共15页
产品研发合同英文版.docx_第5页
第5页 / 共15页
点击查看更多>>
资源描述

《产品研发合同英文版.docx》由会员分享,可在线阅读,更多相关《产品研发合同英文版.docx(15页珍藏版)》请在金锄头文库上搜索。

1、Classification: Final DraftDate:2023-11Project Name: Packer rubber for staged fracturing toolSpecification No:Internal Order No:Client: Revised No: GENERAL CONTRACTBETWEENAND OFTHE PACKER RUBBERFOR STAGED FRACTURING TOOLIN ALBERT CANADABYUNIVERSITY OF ALBERTAPrepared By: SheetGENERAL CONTRACT BETWEE

2、N AND UNIVERSITY OF ALBERTA OF THE PACKER RUBBER FOR STAGED FRACTURING TOOLIntroductionAccompanying with the fast growing of fracturing operation in petroleum industry in China, the usage of the staged fracturing tools will be expanded markedly. By the invitation of Prof. Gu, University of Alberta (

3、shall mean the Party B) will help Poly-Doctor Petroleum Technology Co. Ltd. Beijing (shall mean the Party A) to develop a packer rubber for staged fracturing tool. The site of the packer rubber manufacturing plant is selected in Alberta. (More information please is noticed in the attachment of the P

4、roposal of the packer rubber production line for staged fracturing tool in Alberta, Canada. Internal Order No: UAlberta-2023-11)Parties in this ContractEntrusting Party (Party A): Entrusted Party (Party B): University of Alberta116 St, 85 AveEdmonton, ABCanadaT6G 2R3Articles of Rights and Obligation

5、s of two PartiesThe following articles have been discussed and agreed upon between Party A (stands for ) and Party B (stands for University of Alberta):The scope of supply for this Contract is Party B helps Party A to build a packer rubber for staged fracturing tool (required technical specification

6、 is attached in the technical index).Party A entrusts Party B to research and develop technique proposal of a packer rubber for staged fracturing tool. The following articles are reached and abided by the both parties. Article 1: Definitions 1.1 Technique proposal of a packer rubber for staged fract

7、uring tool (hereinafter referred to as “the Solution”) shall mean all the required techniques to construct the general idea which will commit the attached technical index requirements in attachment. The Solution shall include all technical details of all designing schemes and experimental verificati

8、on for key parameters. 1.2 Technical documentations shall mean all the necessary documents to design the Solution and all the verification documents that Party B will use in designing the Solution. 1.3 “R&D” shall mean research and development.Article 2: Contents & Scopes of Contract 2.1 The require

9、ments of the Contract Solution 2.1.1 Technical Content: (a) Design technical proposal; (b) Key features verification; (c) Detailed technical requirements see technical index attachment. 2.2 The obligations of both parties 2.2.1 Party B shall submit the R&D plan to Party A within two months after thi

10、s Contract comes into effect.2.2.2 With the confirmation of the both parties, within the validity of the Contract, Party A shall designate Mr. as Party As project contact person. Party B shall appoint Mr. as Party Bs project contact person. If any changes of the contact person occur, one party shall

11、 inform the other party based on written materials in due time. If one party fails to promptly inform the other party, it shall be held responsible for any influence or damage caused by the untimely notification during the performance of the Contract. 2.3 Delivery Party B shall deliver the Contract

12、Solution to Party A before November 1st 2023, which shall be in accordance with the contents as specified in the technical index of Internal Order No: UAlberta-2023-11 of the attachment of the Contract. 2.4 Assessment & Acceptance Confirmed by the both parties, Party A shall adopt the signed standar

13、ds and methods to examine and accept the Contract Solution by Party B. 2.4.1 To ensure that the Contract Solution supplied by Party B is correct, reliable and advanced,Party A and B shall jointly perform the assessment and acceptance of the technical Solution and core parameters in accordance with t

14、he provisions of items 2.1 - 2.3 of the Contract and technique attachment. If the technical Solution are qualified, both parties shall jointly sign a certificate of acceptance in two copies, one for each party. 2.4.2 If the Solution is not able to meet the requirements of the Contract, both parties

15、shall hold friendly discussions to analyze the reasons and take measures to correct any defect and prepare for the second assessment and acceptance of the Contract Solution, and the second assessment shall be delivered to Party A after 120 days of the date of Delivery. If the Solution are still not

16、qualified after the second assessment and acceptance and the responsibility lies in Party B ,Party B shall be responsible for all the losses thus caused, Party A shall have the right to terminate the Contract and raise a claim against Party B according to Article 6;If the responsibility lies in Party A, both parties shall mutually discuss the furth

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 商业/管理/HR > 商业合同/协议

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号