设计公司英文合同.doc

上传人:m**** 文档编号:557453063 上传时间:2022-12-31 格式:DOC 页数:3 大小:29.01KB
返回 下载 相关 举报
设计公司英文合同.doc_第1页
第1页 / 共3页
设计公司英文合同.doc_第2页
第2页 / 共3页
设计公司英文合同.doc_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

《设计公司英文合同.doc》由会员分享,可在线阅读,更多相关《设计公司英文合同.doc(3页珍藏版)》请在金锄头文库上搜索。

1、ContractParty A:Party B: According to the Contract Law of Peoples Republic of China as well as other relevant laws and regulations, through friendly negotiation, Party A and Party B entrusted to undertake design, and reached the following agreement:1. CommitmentParty A entrusted Party B _.Draft desi

2、gn period _ working days2. Design FeeTotal design fee: RMB3. Payment:a. Party A should pay 60% of total designing fee once signing the contract, i.e RMB.b. After confirming the designing schedule and style, and when in need of adjusting on electric designs, Party A should pay 30% of total design fee

3、, i.e RMBc. After fixing the complete designing schedule, Party A should pay the balance of the design fee, i.e RMB, Party B should hand over the printing CD after receiving the balance of payment.4. Period and means of delivery of the design plan.a. Party B must complete the draft of design within

4、the time agreed by the two parties. If party B can not complete on time due to reduplicative changes from Party A, the delivery time can be put off. To ensure the smooth cooperation, Party A must confirm or make suggestion within three working days after receipt of the design from Party B, Party B s

5、hould not exceed five working days to feedback the suggestion.b. Party A should supply the necessary designing information within 20 working days after signing of the contract. As Party A (not supply complete information and so on) make the design delayed, if delayed time more than three months (sub

6、ject to the date of contract), Party A should pay the balance design fee, Party B will carry on making the design. If more than six months, this contract will automatically be terminated. Party B will supply the original CD. If Party A still need Party B to make the design, Party A should pay anther

7、 palette and design fee.c. After the final confirmation of the design, Party B should supply the colored prints and electronic documents.d. Party A should bear the actual cost if needs the printing sample.5. Intellectual Property.a. Before Party A pay off all the design fee, Party B own the copyrigh

8、t, Party A can not use this design, and have no any right of this works.b. Party A have the right to sign the Copyright Transfer Contract, to have the proprietary rights, rights of use and alterations after paying off the payment. Copyright of design not used by Party A still belongs to Party B, Par

9、ty A do not have any right for this.c. After the final confirmation by Party A, if as the changes of Party As company name or commodity name to change the design plan or have all different idea with the original plan, it should be as new plan, and Party A should pay the balance fee, and sign new con

10、tract, Party B will make new design plan.d. After paying off, Party B can not alter the design and give any other company.6. Responsibility and authoritya. Responsibility of Party A(1) Party A should try their best to supply the information for this design.(2) Once finding the mistake, oversight or

11、disagreement with the contract, Party A should inform Party B in writing timely, and Party B should make amendment in time.(3) Party A should abide by the payment terms in the contract.(4) Party A should make the confirmation for all the documents and things that need confirmed timely. (5) Party A h

12、ave the right to give a suggestion for Party Bs design and make the works accords with the enterprise culture. b. Responsibility of Party B(1) Party B must make the plan and creative design according to the requirement in the contract made by Party A, and make full use of specialized knowledge and e

13、xperience, to supply first design and service to Party A.(2) Party B should supply all the design documents, making sizes and designs of every period according to the all requirement of the contract and appendix, and complete the design.(3) Party B should make the design according to the things that

14、 confirmed by Party A critically.(4) Party B should make the design creation as the requirement of Party A and supply the satisfied works.7. Breach of Dutya. Party A to terminate the contract before draft design completed, Party B will not return the deposit. Party A to terminate the contract after

15、the final design, they should pay all the fees.b. Party B to terminate the contract without cause, to return all the fees to Party A. 8. The two copies of the both signed contract, the two sides an armed, and have the equal legal effect.The design time begins after the contract signed and received the deposit. Party A Signature (seal): Party B Signature (seal): Address: Address:Tel: Tel:Date: Date

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 生活休闲 > 社会民生

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号