k挂篮施工方案1

上传人:夏** 文档编号:503005547 上传时间:2023-10-17 格式:DOC 页数:105 大小:3.31MB
返回 下载 相关 举报
k挂篮施工方案1_第1页
第1页 / 共105页
k挂篮施工方案1_第2页
第2页 / 共105页
k挂篮施工方案1_第3页
第3页 / 共105页
k挂篮施工方案1_第4页
第4页 / 共105页
k挂篮施工方案1_第5页
第5页 / 共105页
点击查看更多>>
资源描述

《k挂篮施工方案1》由会员分享,可在线阅读,更多相关《k挂篮施工方案1(105页珍藏版)》请在金锄头文库上搜索。

1、Delegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Asse

2、mbly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the partys 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve,

3、smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.8

4、15 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. -Security measures: unplanned outages 2.5 times. No pe

5、rsonal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207

6、 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. -Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions perfo

7、rmance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. -Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduc

8、tion over the same period a year earlier. Major achievements: first, we should adhere to the two management system basis, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two management system for improvement. F

9、ocus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management networ

10、k role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervis

11、ion of production safety and the Olympic Games and other世纪大道西延一期工程连续箱梁专项施工方案(内附9号墩补充方案)中铁二十四集团福建铁路建设有限公司世纪大道西延一期工程项目部2011年1月目 录第一章:编制说明及依据第一节:编制说明3第二节:编制依据4第二章:工程概况第一节:工程简介5第二节:设计技术标准5第三节:主桥上部结构简介6第四节:主要工程数量7第三章:施工管理组织第一节:专项施工管理机构9第二节:施工人员组织9第三节:施工机械及设备组织11第四章:连续箱梁施工方案第一节:箱梁施工顺序及工艺流程12第二节:0号段施工14第三节

12、:悬臂梁段施工23第四节:箱梁施工测量及线型控制43第五节:边跨平衡段,合龙段施工47第五章:保证措施第一节:施工进度计划及工期保证措施58第二节:质量保证措施59第三节:安全生产保证措施61第六章: 季节性施工措施第一节:雨季施工66第二节:夏季施工66第三节:冬季施工67第七章:附件(图、表)附件1:箱梁施工进度计划表69附件2:0号块支架施工布置图70附件3:现浇段钢管支架施工布置图72附件4:主桥挂篮施工布置图73附件5:主桥挂篮计算书80第一章 编制说明及依据第一节 编制说明1、为了保证工程安全质量,使项目施工管理顺利进行、做到规范标准化施工、避免不必要的重复工作,根据所建的项目编写

13、本施工工艺。2、本工艺为预应力砼连续箱梁施工工艺,主要包括:模板、钢筋及混凝土工程,预应力张拉及压浆,0#块支架现浇,普通挂篮悬浇,平衡段、合拢段等工序及关键部位的施工工艺。3、本工艺的编制按照项目工程施工的顺序:先墩顶箱梁块段(即0#块段)施工,接着在0#块箱梁段顶板上拼装挂篮悬浇箱梁块段,并同时进行支架现浇边跨平衡段,最后灌筑合拢段砼,按设计规定步骤进行体系转换后成桥。4、 预应力连续箱梁悬臂灌注法施工,在大跨度的桥梁建设中得到广泛应用和较快发展,本工艺编写时,荷载及有关规定遵照公路桥涵施工技术规范并参照公路工程质量检验评定标准以及其他有关国家标准、部颁标准等条款。5、本工艺编写时尽可能吸收现代科技的发展和创新成果,但由于视野和水平所限,仍有不少缺憾之处。在确保桥梁质量的前提下,在应用本工艺时从实际出发,不断改进和提高,并应积极开展技术革新和科学试验活动,积极引进应用先进成熟的新技术、新工艺、新设备,以缩短施工工期,提高劳动生产率和经济效益。6、本工程挂篮主纵梁采用三角架形式,上下横梁采用型钢拼装而成。第二节 编制依据1、由北京特希达交通勘察设计有限公司提供的镜湖新区世纪大道西延一期工程

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 办公文档 > 工作计划

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号