资源描述

《se垃圾填埋场防渗膜工程施工组织设计》由会员分享,可在线阅读,更多相关《se垃圾填埋场防渗膜工程施工组织设计(114页珍藏版)》请在金锄头文库上搜索。

1、evaluation of scientific development. Nature security type-nature security is to maintenance people of health value for target, through strengthening security based management, and risk management, and equipment management and technology supervision, ensure production in the people, and real, and sy

2、stem, and system, elements security reliable, and harmony unified, full control various against factors, achieved thought no slack, and management no empty document, and equipment no hidden, and system no blocked, and unit zero non-stopped. Quality and efficiency-quality benefit is to adhere to the

3、enterprise survival, profit and development business truth, adhere to the all activity is economic activity, all costs can be controlled, money should not be wasted management philosophy, management analysis, to improve management quality, improve cost control capacity and market competitiveness. In

4、novation of science and technology-science and technology innovation is to play the role of science and technology as the primary productive force, active use of new technologies, new materials, new processes, new equipment, increase investment in science and technology, strengthening scientific and

5、 technological training, speeding up transforming scientific and technological achievements, forming a number of proprietary technology, enhancing core competitiveness. Resource-saving-the-resources saving enterprise was to reduce coal consumption, water consumption, electricity at the core, enhance

6、 the operation of lean management to realize low consumption, high efficiency, reduce production costs. Second is to strengthen the business, financial, material, information and the optimization of organization and management, saving the internal transaction costs. Harmonious development of harmoni

7、ous development-is to construct a foreign environment for development. XING refers to the internal security firm and internal management of the internal management measures are effective, harmonious. Foreign currency means Enterprise coordinating development of homeopathy, well, get along with the n

8、eighbors better. (B) XX 2013 five enterprises building intrinsic safety power company goals are: unplanned outage 0 times. Class of disorders 0, 0 is equivalent forced outage rate. No personal injury accident, material and equipment accidents do not occur, no fire, no environmental pollution acciden

9、t. Enterprise integrated to achieve zero cases of violation, zero accidents, zero. Quality goal is: when generating capacity 7.5 billion-kilowatt, sales of over 7.11 billion kWh, total profits of 306.6 million Yuan, . BFS+、PI、MIS、SCM Information systems infrastructure, fully integrated information s

10、ystem to realize information resources sharing; to expand the breadth and depth of the portal system, information system of Enterprise Management Assistant role to play; to improve the day-to-day operation and maintenance operation record of promoting causes and transfer system; to strengthen the tr

11、aining溧阳市环境卫生管理处垃圾填埋场防渗膜工程施工组织设计编制单位:XXXXXXXXX公司编制日期:XX年XX月XX日目 录第一章 施工组织设计综合说明第二章 编制说明第三章 工程概况第四章 施工部署第五章 施工技术方案5.1 总论5.2开工前的准备工作5.3防渗系统安装工艺流程5.4施工程序5.5施工大纲第六章 施工主要工序6.1 防渗工程施工安装顺序6.2 HDPE土工膜安装程序及工艺要求6.3土工布铺设施工程序及工艺6.4 HDPE管施工程序及工艺6.5 GCL钠基膨润土垫铺设施工程序及工艺第七章 施工总平面图第八章 质量保证措施及保证体系第九章 工期保证措施及工程总进度计划第十章

12、 资源配置(施工机械配置等)第十一章 确保安全生产的技术组织措施第十二章 文明施工组织措施第十三章 创安全文明标准化工地第十四章 雨季施工措施第十五章 环境保护措施第一章 施工组织设计综合说明我公司收到溧阳市环境卫生管理处施工招标文件及招标图后,公司及时组织工程科、技术科、质检科、材料设备供应科等有关部门技术人员认真详尽地阅读了溧阳市环境卫生管理处垃圾填埋场施工招标文件,同时借鉴多年同类工程施工的经验,这样加深了对本次施工关键问题的认识和理解,准确透彻地对施工中可能遇到的所有问题拟定了切实可行的方案和对策。公司严格遵循招标文件及合同文件的要求,结合我公司的人力、技术、机械设备、资金能力,认真编

13、制了本次工程的施工组织设计,详细阐述了施工中的工程质量目标及检查和检验方法、材料和设备的进场时间、进度计划和实施、现场实验、施工安全保护及文明施工措施等。本工程施工时间紧,短期内施工工程量较大,质量及安全文明施工要求高,我公司特制定了行之有效的工程项目动态管理措施,进一步编制施工图预算并针对各施工部位正确进行人工费、材料费、机构费的分解,从而编制具体、详细的施工进度计划,同时根据进度计划提出各种原材料、半成品、劳动力、机具设备等资源要求计划表及资金投入计划表,报建设方调查、评定,并落实进场。 我公司在溧阳市环境卫生管理处垃圾填埋场防渗膜工程施工中,将对“优秀、高效、安全、文明”的宗旨, 本着对

14、业主高度负责的态度,确保在50个日历天内完成该工程,使该工程质量等级达到合格标准。在施工中,服从建设单位、设计及监理工程师的管理,从严控制工程质量、认真做好安全文明施工,达到“溧阳市安全文明工地”标准。同时,在施工中同业主单位开展“增收节支、开源节流”活动,提出更多合理化建议,力争“少花钱、办实事”,将业主投资的每一分钱落到实处,在达到有效控制投资的目的,更好更快地交给业主满意的精品工程。1.1 工程质量目标公司将在溧阳市环境卫生管理处垃圾填埋场防渗膜工程施工中,建立、健全完善的质量保证体系和组织措施,通过项目程序化管理和规范化施工,对施工过程和施工质量进行全程监控,确保最终施工质量达到合格标

15、准。1.2 工程安全目标公司将在溧阳市环境卫生管理处垃圾填埋场防渗膜工程施工中,坚持“安全第一,预防为主”的方针,认真进行安全技术交底,施工班组每日班前召开安全快会,项目部每日班前召开安全快会,项目部每周召开一次安全例会,并作好记录。教育工人正确使用“三宝”、“四口”及危险处悬挂安全警示牌,现场配电采用三相五线制,使用TN-S系统,做到“三级配电,二级保护”。同时施工现场认真落实以岗位责任制为中心的安全制度,建立、健全 安全保证体系,搞好安全生产,确保整个施工过程为“零伤亡、零事故”的安全目标。1.3 施工进度控制计划工期为50个日历天(含人员、设备、材料进场和现场工艺试验)。本工程施工时间紧,短期间施工工程量较大,需要合理安排进度,建立高效、协调、机动的管理体系,科学地调配人力、物力和财力等资源,并结合资源配置计划,进行流水作业,做好工序撒拉和监管工作,最大限度地缩短施工工期。同时在加强预测和决策的基础上,编制施工项目的滚动计划,采用网络计划的形式并组织流水作业,跟踪检查进度计划执行情况,发现偏差,及时分析原因并及时对计划进行相应调整,确保实现项目工期。1.4 创建安全文明“达标工地”为降低施工中对周围环境污染和减少扰民噪音,达到设计和业主要求,我公司将从施工方案、施工工艺、施工现场管理等诸多方面入和,狠抓现场施工,达到“溧阳市级安全文明工地的标准”。环境保护:加强对施工现