d后浇带及上挡墙施工方案

上传人:壹****1 文档编号:492322405 上传时间:2022-09-14 格式:DOC 页数:10 大小:335.02KB
返回 下载 相关 举报
d后浇带及上挡墙施工方案_第1页
第1页 / 共10页
d后浇带及上挡墙施工方案_第2页
第2页 / 共10页
d后浇带及上挡墙施工方案_第3页
第3页 / 共10页
d后浇带及上挡墙施工方案_第4页
第4页 / 共10页
d后浇带及上挡墙施工方案_第5页
第5页 / 共10页
点击查看更多>>
资源描述

《d后浇带及上挡墙施工方案》由会员分享,可在线阅读,更多相关《d后浇带及上挡墙施工方案(10页珍藏版)》请在金锄头文库上搜索。

1、authority, to dare to seriously, dare to struggle, dare to offend, the disciplinary offence does not indulge, do not give way, does not condone, ensure discipline put in place Constitution Party rules. (D) the broad masses of party members and cadres should set high standards and hold the bottom lin

2、e, conscientiously abide by the guidelines, the Ordinance. One is against the guidelines and of the 25 cases, closely their ideas, work, and life, focus on resolving the outstanding issues, strengthen study and carry out targeted and effective. Second is to set high standards and hold the bottom lin

3、e, conscious pursuit of high standards in self-discipline . The wind prone-prone, important nodes and masses feel strongly about issues, focus on four winds new forms, new trends, Stern acts that violate Central eight spirits. Efforts to increase informed exposure form check the correct four winds o

4、f the powerful momentum, release of discipline will signal. Meanwhile, extended monitoring antenna, through rural and fishery honest inspections, discover, check there is happening at the grass-roots masses around the issue of corruption and unethical practices, and to safeguard the peoples interest

5、s and social stability. Creative discipline. Grasp and use of supervision and discipline four types vacuum tube up the lot, discipline and law. A few and few serious investigation into the deal, and most maintain zero tolerance situation, through the layers of conductive pressure let discipline rule

6、s become the consciousness of each of the party members and cadres to follow. At present, to be imposed on the clues list-style management, strictly follow clues to dispose of five standards, classification and disposal, dynamic cleanup. Urged party committees at all levels the implementation of res

7、ponsibility, using a combination of party discipline and organization to address by means of effective control of those common, familiar strange a minor issue, not practice and exceptional case. Outstanding discipline features, breaches of discipline and rules issues in supervision and discipline an

8、d disciplinary focus. Same time, increase the case-cha, to serious indiscipline or against the four winds problem ban while the generation, not only to hold directly accountable, also holds the leadership responsibility not only holds the primary responsibility for party committees, and to pursue di

9、scipline supervisory responsibilities, promote accountability as the new normal. Implementation of oversight responsibilities. Maintain the seriousness and authority of the guidelines and the regulations, the discipline and rules truly become the ruler of the party the party. Discipline Inspection C

10、ommission as a specialized agency in inner-party supervision, accountability must be strengthened, and adhere to the iron discipline of accountability, effective discipline, discipline will investigate, seriously investigate and deal with acts in violation of guidelines and regulations, making it pr

11、one to blame, preventing broken window effect. Supervise the leading cadres play an exemplary role, and lead to strictly adhere to the guidelines and regulations, lead to maintain the seriousness and authority of the party rules of party discipline, that the party discipline and laws in place. Throu

12、ghout the daily supervision and management discipline, and strengthen supervision and inspection, strictly investigate and deal with a variety of disciplinary actions. Strengthening key areas, key sectors and key projects as well as focused on public and sector-specific齐礼阎小区7#院 后浇带及上挡墙施工方案目录第一章、工程基本

13、情况2一、工程概况2二、后浇带宽度及上挡墙高度2第二章、编制依据3第三章、施工要求3第四章、施工方法3一、施工顺序3二、后浇带及上挡墙加固设计3三、施工图纸6第五章、工程质量保证措施6一、基本要求6二、施工保证措施6三、质量保证体系6第六章、安全保证措施8一、安全管理体系8二、安全管理制度9三、安全技术措施9四、职工安全生产管理措施9后浇带及上挡墙施工方案第一章、工程基本情况一、工程概况齐礼阎小区7号院项目位于郑州市兴华南街与光明路交叉口西南角,为齐礼阎城中村改造项目。总用地面积约17512平方米,容积率为6.899, 地上建筑面积 12.08万(其中:住宅面积97494.5平方米,阳台面积

14、2962.66平方米,商业面积 17460.99方米,农贸市场面积2000平方米,社区服务用房:320平方米,公厕面积30.16平方米,物业面积541.01平方米),地下建筑面积27518.38平方米,建筑占地面积 6837.03平方米。 根据设计要求,本工程各主楼及车库筏板及地下室外墙后浇带均采用止水钢板和橡胶止水带止水,工程情况详见下表:楼号分区号地下室层数地上层数筏板厚度(mm)后浇带宽度(mm)1A东单元-3F25F1600800西单元-3F31F19008001B东单元-3F34F1900800西单元-3F19F13008002#楼-3F34F1800800车库-3F4F250/45

15、0800本工程建设单位:郑州市二七区淮河路街道办事处齐礼阎社区居民管理委员会;施工总承包单位:福建来宝建设工程有限公司;设计单位:中国核电工程有限公司郑州分公司;监理单位:河南宏业监理有限公司;二、后浇带宽度及上挡墙高度1、上挡墙高度及长度统计:楼号上挡墙高度(mm)上挡墙厚度(mm)上挡墙长度1A300见地下室图纸见地下室图纸1B3002#300车库300第二章、编制依据齐礼阎小区7#院结构施工图中华人民共和国建筑施工手册混凝土结构工程施工质量验收规范GB50204-2011各种相关验收规范、规程等第三章、施工要求1、施工方案必须满足相关规范要求,不需私自改动。2、焊工必须持证上岗,保证焊接质量。4、模板支设应稳固,以保证成品质量。5、施工前应组织施工人员进行交底,并确保方案的执行,必要的人员及材料必须在施工前全面考虑,确保施工进度。6、地下室外挡墙施工期间,应组织好排水降水及防雨工作,防止发生边坡塌陷。第四章、施工方法一、施工顺序1、后浇带施工顺序:放后浇带定位线筏板下部钢筋网片绑扎

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 办公文档 > 工作计划

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号