1、桥梁常用单词边梁:End girder(Beam)河道防护:River training中隔板 intermediate Cross beam地下排水沟:Subsoil drain一、结构物名称:边隔板:End Cross beam流水面高程(管道内底高程)Invert(1).结构物:Construction桥面板:Deck slablevel桥梁:Bridge现浇板:Cast in situ slab跨线桥:Flyover防撞护栏:Crash barrier (人行道)铁路桥:护栏:Railing;R.O.B. (Railway over bridge)磨耗层:Wearing coat小桥:

2、Minor bridge实心板Solid slab拱桥:Arched bridge空心板:Voided slab二、工艺及其相关地下通道:Underpass预应力 Pre-stressing Work;检查,视察:Check/Inspect人行天桥:Foot bridge压浆 Grouting;测量:Survey天桥:Overpass现浇预应力箱梁检查申请:RFI. (Request for便桥:Auxiliary bridge;PSC Box Girderinspection)1.垫层 Bedding/Cushion开挖:Excavate垫层砼:Bedding Concrete换填:Exch

3、ange (Replace)砂垫层:Sand bed/cushion钢管栏杆:Pipe handrail填石:Rock fill2.基础:Foundation桥头搭板:Approach slab石屑chip;扩大/明挖基础:泄水孑L Drainage spouts片石;chip stoneOpen foundation收集井:collection pit料石:chipped stone桩:Pile(2).涵洞:Culvert钢筋:Steel bar/Reinforcement桩基础:Pile foundation管涵:Pipe culvert箍筋 stirrup钢筋砼钻孔灌注桩:板函:Slab

4、 culvert弯沟:hookReinforced concrete bored pile箱函:Box culvert下料;Cut3.下部结构:Substructure倒虹吸:Inverted culvert弯曲:bend桩帽:Pile cap集水井:Storm water manhole(Catch绑扎:bind钢筋砼桩基承台:pit)绑丝:binding wireReinforced cement concrete pile cap检查井:Manhole保护层:Cover /protection桩头:Pile-head端墙:Head walllayer/protection coat桩式桥

5、台:Pile abutment底板:Bottom slab净保护层:Clear cover桥台:Abutment顶板:Top slab保护层垫块:Cover block台帽:Abutment cap帽石:Cap焊接:weld( jointing)桥墩:Pier裙墙:Apron焊缝:joint;圆柱:Column底墙(坡脚墙):Toe wall焊剂 welding flux墩帽:Pier cap截水墙(幕墙):Curtain wall焊条 welding rod侧墙(迂回墙)Return wall铺砌:Pitching焊丝 welding wire;翼墙:Wing wall砌石护坡:Stone

6、Pitching钢筋下料表:BBS.(Bar bending墙:Wall干砌石(乱石堆)Rip-rapschedule)加筋挡土墙:Retaining wall石墙:Stone masonry wall钢筋笼:Reinforcing cage加筋土挡墙:(Reinforced earth) wall护墙(矮墙)Parapet钢筋网:Reinforcing mesh支座垫石:Pedestal(3).水系:(6)搭接:Lap支座:Bearing水沟:Drain钢筋搭接:Splicing of bars橡胶支座:elastomeric bearing边沟:Side Drain钢筋接头:Joint o

7、f reinforcement背墙:Dirt wall (Back wall)中央水沟:Median Drain钢筋间距:spacing of bars4.上部结构:Superstructure开口沟,明沟:Open drain钢板:steel plateT 梁:T-Girder(Beam)钢筋砼沟:RCC drain骨架 skeleton预制钢筋砼T梁:Precast RCC. T砌石沟:Masonry drain钢丝刷wire brushgirder石笼:Gabion螺栓:bolt横隔板梁:Intermediate girder/Beam石笼铁丝网Gabion mesh(钢结构)螺栓连接:

8、bolted connection模板:Formwork/Shutter木模板:timber formwork钢模板:Steel Formwork脚手架:Scaffold/ False work/Staying 胶合板:plywood木楔:chock模板支设:Erection;模板加固:Fixed form模板拆除 Removal of formwork砼:Concrete钢筋砼:Reinforced concrete素砼:Plain concrete片石砼:Rubble concrete浇注砼:Cast concrete/Placing concrete砼泵:Concrete pump砼标号

9、:Concrete grade(Class)养 护:Curing水下砼用导管:Tremie砼保护层:Concrete cover砼拌合站:Concrete mixing plant/Concrete batching plant 振动器 vibrator;附着式模板振动器:External pneumatic vibrator离析 segregation or loss of its constituent materials;溜槽chute;蜂窝 honeycomb spot裂缝 crack/fissure;麻面 pockmark;露筋 reveal of reinforcement;干缩

10、shrinkage干缩裂缝 Contraction crack抗渗砼 watertight concrete;坍落度slump;终凝时间 final setting time;凝结时间 setting time;泵 pump;振动台:Shake table/Vibratory table 振动器 vibrator;胶囊:Balloon不均匀沉降 non-uniform distribution沉降缝 settlement joint: 伸缩缝(接头)Expansion joint(Gap)/ 伸缩缝:Contraction joint 施工缝:Construction joint 密封条形伸缩

11、缝Strip Seal expansion joint;水泥cement水泥砂浆cement mortar砂浆mortar石灰:lime;水准仪:Level machine全站仪:Total station全球定位系统:GPS, (Global position system)台背回填:Backfill施工荷载:Construction load施工图: Working drawing/Working shop毫米:Millimeter厘米 Centimeter米:Meter公里: Kilometer桩号:Chainage英寸:Inch英尺:Foot英里:Mile平方米:Square mete

12、r 立方米:Cubic meter数量:Nos.吨:Tonne公斤: Kilogramme克:Gramme木钉peg;铁钉:nail沥青纸:Tar paper水泥罐 bulk storage containers/silo 锤子:Hammer钢卷尺steel tape 铁锨 shovel/spade三、工种:人工: manpower;工人:workers ;工头,领班:forman/ Worker ganger1. 小工(体力劳动者):Unskilled labour壮工:labour2. 技工:Skilled labour焊工weldor钢筋工:Fitter /Steel fixer木工:

13、Carpenter砼工: Concrete gang / Concretor 瓦工/砌石工: Stone mason 电工:Electrician爆破工:Blaster管工:Rigger/Pipe layer警卫、门卫:Watchman打桩操作手:Piling rig operator 小型设备操作手:Light plant operator重型设备操作手:Heavy plant operator下部结构 substructure桥墩pier 墩身pier body墩帽 pier cap, pier coping台帽 abutment cap, abutment coping盖梁 bent c

14、ap又称“帽梁”。重力式桥墩gravity pier 实体桥墩solid pier 空心桥墩hollow pier 柱式桥墩 column pier, shaft pier 单柱式桥墩 single-columned pier, single shaft pier 双柱式桥墩 two-columned pier, two shaft pier 排架桩墩 pile-bent pier 丫形桥墩 Y-shaped pier 柔性墩 flexible pier制动墩 braking pier, abutment pier单向推力墩 single direction thrusted pier 抗撞墩 anti-collision pier锚墩 anchor pier辅助墩 auxiliary pier破冰体ice apron防震挡块 anti-knock block, restrain block桥台 abutment台身 abutment body前墙 front wall又称“胸墙”。翼墙 wing wall 又称“耳墙”。U 形桥台 U-abutment八字形桥台 flare wing-walled abutment 一字形桥台 head wall abutment T 形桥台 T-abutment箱形桥台 box type abutment拱形桥台