SH∕T 3503-2017 交工文件全资料表格(3)

上传人:工**** 文档编号:488987942 上传时间:2023-11-14 格式:DOC 页数:144 大小:10.68MB
返回 下载 相关 举报
SH∕T 3503-2017 交工文件全资料表格(3)_第1页
第1页 / 共144页
SH∕T 3503-2017 交工文件全资料表格(3)_第2页
第2页 / 共144页
SH∕T 3503-2017 交工文件全资料表格(3)_第3页
第3页 / 共144页
SH∕T 3503-2017 交工文件全资料表格(3)_第4页
第4页 / 共144页
SH∕T 3503-2017 交工文件全资料表格(3)_第5页
第5页 / 共144页
点击查看更多>>
资源描述

《SH∕T 3503-2017 交工文件全资料表格(3)》由会员分享,可在线阅读,更多相关《SH∕T 3503-2017 交工文件全资料表格(3)(144页珍藏版)》请在金锄头文库上搜索。

1、wordSH/T 3503J319机组试车条件确认记录Machine Train Readiness for Test Run Confirmation Record工程名称:Project Name:单位工程名称:Unit Name:Equipment DescriptionEquipment Item No.ModelCapacityDriver TypeRevolutionr/minItemTechnical RequirementConfirmed byDateOwner/ SupervisionContractorGeneral ContractorConstruction Cont

2、ractorEquipment ManufacturerEquipment Dismantling InspectionDismantling inspection and restoration shall be pleted and recorded as per specification requirements.Auxiliary SystemThe system shall be verified as acceptable.Oil Piping SystemFlushing and pressure test shall be pleted and recorded as per

3、 specification requirements.Circulating or Lube Oil Applicable requirements shall be met.Electrical FacilityInstallation shall be pleted, testing qualified, and records made in accordance with the specification requirements.Instrument Interlock and Control SystemInstallation shall be pleted, system

4、testing qualified, and records made as per specification requirements.Process Piping SystemInstallation shall be pleted, pressure test and purging (cleaning) qualified, and records made as per specification requirements.Machine Train Test Run Plan Specific and clear test run procedure, measures and

5、quality acceptance requirements shall be available.Supporting Operation Process and ConditionsPreparation shall be pleted as required by the test run plan.Owners Responsible Person for Test Run:Confirmation on Test Run ConditionsReady for test run.General Responsible Person for Test Run:SH/T 3503J32

6、01往复式压缩机试车记录Reciprocating pressor Test Run Record共页 第页 Page of 工程名称:Project Name:单位工程名称:Unit Name:Equipment DescriptionEquipment Item No.ModelOperating MediumTest Run TypeNo-loadLoadedTest MediumAmbient TemperatureDriver TypeRevolution r/min Start-up CurrentAContinuous Running Time hTest Run DateSta

7、rt-up TimingInspection ItemDesign / Allowable ValueActual ValueRunning Recording TimeLube OilInlet Pressure, MPaInlet Temperature,Outlet Temperature,Cooling WaterInlet Pressure, MPaInlet Temperature,Outlet Temperature,Vibration Speed (Amplitude)mm/s(m)AxialHorizontalVerticalBearingTemperatureFront B

8、earingRear bearingThrust Bearing1stStage InletPressure, MPaTemperature,OutletPressure, MPaTemperaturePacking Box Temperature,Owner/Supervision ContractorGeneral ContractorConstruction ContractorEquipment ManufacturerDiscipline Engineer:Date:Discipline Engineer:Date:Foreman: Quality Inspector: Discip

9、line Engineer:Date: Site Representative:Date:SH/T 3503J320-2往复式压缩机试车记录续Reciprocating pressor Test Run Record(Continued)工程名称:Project Name:单位工程名称:Unit Name:Inspection ItemDesign/Allowable ValueActual ValueRunning Recording TimeStageInlet Pressure, MPaTemperatureOutletPressure, MPaTemperature,Packing B

10、ox Temperature,StageInletPressure, MPaTemperature,OutletPressure, MPaTemperature,Packing Box Temperature,StageInletPressure, MPaTemperature,OutletPressure, MPaTemperature,Packing Box Temperature,Test on the protective interlock system:Inspection after test run:Conclusion:SH/T 3503J321-1离心式压缩机试车记录Cen

11、trifugal pressor Test Run Record共页 第页Page of 工程名称:Project Name:单位工程名称:Unit Name:Equipment DescriptionEquipment Item No.ModelOperating MediumTest MediumDriver TypeRevolutionr/minStarting CurrentATest Run TypeNo-load LoadedAmbient TemperatureTest Run DateContinuous Running TimehIdling Times Starting TimingInspection ItemDesign/ Allowable ValueActual ValueRunning Recording Time1stStageInletFlow, Nm3/hPressure,MPaTemperature,OutletPressure, MPaTemperatur

展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 建筑/环境 > 施工组织

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号