白水塘至丘海大道条延长线河道整治工程施工组织设计

上传人:s9****2 文档编号:488574391 上传时间:2023-08-15 格式:DOC 页数:126 大小:840.03KB
返回 下载 相关 举报
白水塘至丘海大道条延长线河道整治工程施工组织设计_第1页
第1页 / 共126页
白水塘至丘海大道条延长线河道整治工程施工组织设计_第2页
第2页 / 共126页
白水塘至丘海大道条延长线河道整治工程施工组织设计_第3页
第3页 / 共126页
白水塘至丘海大道条延长线河道整治工程施工组织设计_第4页
第4页 / 共126页
白水塘至丘海大道条延长线河道整治工程施工组织设计_第5页
第5页 / 共126页
点击查看更多>>
资源描述

《白水塘至丘海大道条延长线河道整治工程施工组织设计》由会员分享,可在线阅读,更多相关《白水塘至丘海大道条延长线河道整治工程施工组织设计(126页珍藏版)》请在金锄头文库上搜索。

1、evaluation of scientific development. Nature security type-nature security is to maintenance people of health value for target, through strengthening security based management, and risk management, and equipment management and technology supervision, ensure production in the people, and real, and sy

2、stem, and system, elements security reliable, and harmony unified, full control various against factors, achieved thought no slack, and management no empty document, and equipment no hidden, and system no blocked, and unit zero non-stopped. Quality and efficiency-quality benefit is to adhere to the

3、enterprise survival, profit and development business truth, adhere to the all activity is economic activity, all costs can be controlled, money should not be wasted management philosophy, management analysis, to improve management quality, improve cost control capacity and market competitiveness. In

4、novation of science and technology-science and technology innovation is to play the role of science and technology as the primary productive force, active use of new technologies, new materials, new processes, new equipment, increase investment in science and technology, strengthening scientific and

5、 technological training, speeding up transforming scientific and technological achievements, forming a number of proprietary technology, enhancing core competitiveness. Resource-saving-the-resources saving enterprise was to reduce coal consumption, water consumption, electricity at the core, enhance

6、 the operation of lean management to realize low consumption, high efficiency, reduce production costs. Second is to strengthen the business, financial, material, information and the optimization of organization and management, saving the internal transaction costs. Harmonious development of harmoni

7、ous development-is to construct a foreign environment for development. XING refers to the internal security firm and internal management of the internal management measures are effective, harmonious. Foreign currency means Enterprise coordinating development of homeopathy, well, get along with the n

8、eighbors better. (B) XX 2013 five enterprises building intrinsic safety power company goals are: unplanned outage 0 times. Class of disorders 0, 0 is equivalent forced outage rate. No personal injury accident, material and equipment accidents do not occur, no fire, no environmental pollution acciden

9、t. Enterprise integrated to achieve zero cases of violation, zero accidents, zero. Quality goal is: when generating capacity 7.5 billion-kilowatt, sales of over 7.11 billion kWh, total profits of 306.6 million Yuan, . BFS+、PI、MIS、SCM Information systems infrastructure, fully integrated information s

10、ystem to realize information resources sharing; to expand the breadth and depth of the portal system, information system of Enterprise Management Assistant role to play; to improve the day-to-day operation and maintenance operation record of promoting causes and transfer system; to strengthen the tr

11、aining白水塘至丘海大道延长线河道整治工程 白水塘至丘海大道延长线河道整治工程施工组织设计项目负责人: 邢向阳 编 制: 符 文 审 核: 吴孝祥 单 位: 海南琼山建筑基础工程公司 日 期: 2014 年 3 月 28日 目 录1、编制说明2、工程概述3、总体施工方案及主要施工方法4、工程投入的主要物资(材料)情况描述及进场时间5、工程投入的主要施工机械设备情况描述及进场计划6、劳动力安排情况描述7、确保工程质量的技术组织措施8、确保安全生产的技术组织措施9、确保安全度汛措施10、确保文明施工的技术组织措施11、确保工期的技术组织措施12、水土保持及环境保护措施13、水利水电工程应急预案

12、14、施工总平面布置图及临时用地表15、附表一 拟投入本标段的主要施工设备表16、附表二 拟投入本标段的实验和检测仪器设备表17、附表三 拟投入本标段的劳动力计划表18、附表四 计划开工日期、完工日期和施工进度网络图19、附表五 施工总平面图20、附表六 临时用地表第一章 编制说明为确保“白水塘至丘海大道延长线河道整治工程”工程施工的顺利进行,做到优质、文明、安全、按期完成施工任务,特编制本施工组织设计,用以竞标和中标后指导实施性施工组织设计编制,并指导施工过程管理。 本施工组织设计是根据由工程招标文件、施工图、现场勘察等结合本公司的管理水平、技术水平、施工队伍、机械设备及物质供应等综合能力具

13、体情况编制而成。一、编制依据本施工组织主要依据以下法律法规,技术标准规范及有关技术文件和图纸进行编制。(1)防洪标准(GB 502011994);(2)水利工程建设项目验收管理规定(水利部第30号令);(3)水利水电建设工程验收规程(SL 2232008);(4)水利水电工程施工组织设计规范(SL 3032004);(5)水利水电工程天然建筑材料勘察规程(SL 2512000);(6)水利水电工程等级划分及洪水标准(SL 2522000);(7)水利水电建设工程验收规程SL2231999;(8)建筑工程施工质量验收统一标准GB503002001;(9)建筑地基基础工程施工质量验收规范GB502

14、022002;(10)水利工程工程量清单计价规范(GB 505012007);(11)水利水电工程施工组织设计规范(SL 3032004)。(12)水工建筑物岩石基础开挖工程施工技术规范SL4794;(13)水利水电工程爆破施工技术要求DL/T5135-2001。(14)建筑地基基础工程施工质量验收规范(GB 502022002);(15)水利水电工程施工通用安全技术规程(SL 3982007);(16)水利工程工程量清单计价规范(GB 505012007);(17)建筑地基基础设计规范GB500072002;(18)建筑地基处理技术规范JGJ79-2002;(19)堤防工程施工规范SL260

15、-98;(20)堤防工程施工质量评定与验收规程SL239-1999;(21)建筑桩基技术规范(JGJ94-94);(22)灌注桩基础技术规程(YSJ21292 YBJ4292);(23)土工合成材料应用技术规范(GB50290-98);(24)土工合成材料测试规程(SL/T235-1999);(25)水利水电工程土工合成材料应用技术规范(SL/T225-98);(26)土工试验规程(SL237-1999);(27)混凝土结构工程施工质量验收规范GB502042002;(28)混凝土质量控制标准GB5016492;(29)钢筋焊接及验收规范JGJ1896;(30)水工混凝土钢筋施工规范DL/T 5169-2002;(31)水工混凝土施工规范DL/T51442001;(32)砌体工程施工及验收规范GB502032002;(33)浆砌石坝施工技

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 办公文档 > 工作计划

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号