xi蓝汛天竺内容感知产业园项目土方、基坑支护、降水、CFG桩施工组织设计

上传人:桔**** 文档编号:469700206 上传时间:2023-03-02 格式:DOC 页数:115 大小:1.98MB
返回 下载 相关 举报
xi蓝汛天竺内容感知产业园项目土方、基坑支护、降水、CFG桩施工组织设计_第1页
第1页 / 共115页
xi蓝汛天竺内容感知产业园项目土方、基坑支护、降水、CFG桩施工组织设计_第2页
第2页 / 共115页
xi蓝汛天竺内容感知产业园项目土方、基坑支护、降水、CFG桩施工组织设计_第3页
第3页 / 共115页
xi蓝汛天竺内容感知产业园项目土方、基坑支护、降水、CFG桩施工组织设计_第4页
第4页 / 共115页
xi蓝汛天竺内容感知产业园项目土方、基坑支护、降水、CFG桩施工组织设计_第5页
第5页 / 共115页
点击查看更多>>
资源描述

《xi蓝汛天竺内容感知产业园项目土方、基坑支护、降水、CFG桩施工组织设计》由会员分享,可在线阅读,更多相关《xi蓝汛天竺内容感知产业园项目土方、基坑支护、降水、CFG桩施工组织设计(115页珍藏版)》请在金锄头文库上搜索。

1、Gay is now a provincial key construction project of aluminum Ltd-province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall respons

2、ibility for the day-to-day affairs of the project. In order to ensure that southern companys control the scale of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation, the overall goal. He and Engineering Department under the leadershi

3、p of all the staff in the companys technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. Technical

4、 innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, insta

5、llation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industrys fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity o

6、f 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project

7、 is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other building materials, the old buildings on the base encountered great difficulties in dealing with significant inc

8、rease in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide d

9、ense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumption can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy

10、saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current ef

11、ficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost cont

12、rol, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according

13、to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good .蓝汛天竺内容感知产业园项目土方、基坑支护、降水、CFG桩施工组织设计目 录一、 编制依据41

14、、 招标文件、设计图纸42、 主要规范、规程、标准43、 勘察报告6二、 工程概况71、 工程项目概况72、 场地工程地质、水文地质条件7三、 项目目标及重点、难点分析与对策111、 项目目标112、 重点难点分析与对策12四、 方案设计131、 支护设计方案132、 CFG桩地基处理设计153、 降水方案164、 设计说明16五、 土方挖运方案181、 施工条件与准备182、 土方挖运方案183、 马道收尾194、 出土量及挖土机械配备195、 应注意的质量问题206、 挖土安全保证措施207、 挖土环保措施20六、 总体策划与部署211、 施工总体策划212、 总体施工部署22七、 施工组

15、织及各分项施工方案251、 施工组织计划252、 加工、材料和施工场地部署353、 施工测量364、 土钉墙施工方案385、 CFG桩施工方案406、 降水施工专项方案437、 监测方案468、 清理及移交489、 与总承包接口4810、 工程应急预案4911、 潜在事故危险性分析5212、 紧急处理措施5313、 施工过程中可能出现问题的预防措施及处理办法55八、 质量保证体系及措施561、 质量管理体系的总体要求562、 工程质量目标583、 项目质量管理体系584、 质量管理职责595、 质量管理制度606、 质量管理程序617、 质量检测设施及方法628、 确保工程质量的保证措施659 、分项工程质量保证措施71九、 施工进度计划保证措施731、 确保进度计划的组织措施732、 确保进度计划的管理措施753、 确保进度计划的技术措施774、 确保进度计划的材料与经济措施775、 施工进度计划保证措施80十、 雨季施工方案851、 总体要求852、 各分项施工具体要求853、 雨季施工防护措施86十一、 安全施工措施及环保方案911、 安全施工管理体系912、 施工现场安全管理措施943、主要分部分项工程安全技术措施984、 环保管理体系及措施1025、噪音的控制1046、消防保卫措施104十二、

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 资格认证/考试 > 自考

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号