The construction of the emergency measures to ensure the quality of engineering

上传人:hs****ma 文档编号:457971693 上传时间:2022-12-22 格式:DOC 页数:6 大小:38KB
返回 下载 相关 举报
The construction of the emergency measures to ensure the quality of engineering_第1页
第1页 / 共6页
The construction of the emergency measures to ensure the quality of engineering_第2页
第2页 / 共6页
The construction of the emergency measures to ensure the quality of engineering_第3页
第3页 / 共6页
The construction of the emergency measures to ensure the quality of engineering_第4页
第4页 / 共6页
The construction of the emergency measures to ensure the quality of engineering_第5页
第5页 / 共6页
点击查看更多>>
资源描述

《The construction of the emergency measures to ensure the quality of engineering》由会员分享,可在线阅读,更多相关《The construction of the emergency measures to ensure the quality of engineering(6页珍藏版)》请在金锄头文库上搜索。

1、The construction of the emergency measures to ensure the quality of engineering (1) reasonable arrangement of construction personnel and management personnel, and are professionally trained and have years of experience in the construction of similar engineering, very competent for the project constr

2、uction and management. Once the crush task or need repair, scrambling to project, can immediately put into construction, and can ensure the quality, quantity, and construction on schedule. (2) the reasonable arrangement of construction and material approach, reserve sufficient materials, and after a

3、 second-round exam qualification. Not only want to buy used in the construction of the recent, consider the market factors and supply factors. Steel demand this month, for example, to 100 tons, for engineering to reserve 40 tonnes next month, and after a second interview. Avoid supplies couldnt keep

4、 up with the project need emergency case, or supplies and second-round exam is not qualified and reliable. (3) all of our construction machinery maintenance work must be made on schedule, and equipped with spare machinery, in order to avoid mechanical failure cause project quality couldnt keep up wi

5、th emergency situations. (4) equipped with water tank, generators, to avoid in the case of off power, water supply engineering quality problem. (5) emergency construction capital reserves. 9.4.3 product protection measures and plans 9.4.3.1 product protection organization management measures and pla

6、ns (1) was established by the project manager to lead the team finished product protection, including the civil engineering department, quality department and materials for all equipment and related personnel, set full-time member of the finished product protection, and define the relevant departmen

7、ts and personnels post responsibility. (2) establish and improve the finished product protection system, strictly enforce my unit of engineering construction finished product protection. In the construction of production at the same time clear the basic requirement of product protection and key. For

8、mulate the corresponding protective measures, and strengthen supervision and inspection. (3) strengthen the finished product protection publicity and education, make relevant personnel to understand well the finished product protection is the necessary condition to satisfy the normal construction an

9、d maintenance of the basic requirements of professional ethics. Each team or crew member that must be a responsible product protection (4) stepping up efforts in supervising the finished product protection work, one is the site operating personnel the civilized construction consciousness, the second

10、 is to develop the necessary product protection measures. Therefore should implement the corresponding rewards and punishment system and guarantee enough manpower and money. (5) the coordination between each subcontract professional crossover operation, and careful planning into the reasonable arran

11、gement of each specialty of processes and completion time, and implement the responsibilities for period of finished product protection. Regular meeting, solve problems and disputes exist in the protection products. (6) tissue products protect the handover formalities, the signing of the economic re

12、sponsibility of product protection, responsibility for product protection shall be investigated for economic responsibility, to deliberate and serious damage to the product responsibility aggravating punishment, until things get liability shall be pursued. 9.4.3.2 product protection measures during

13、construction (1) the template construction, finished product protection Site using templates, loading and unloading, and storage pay attention to protect points specification neat pattern, and prevent damage and deformation. Template installation process light with light, not strong pull hard top, c

14、annot be loose caused by man-made randomly dismantled after installation. Installed templates to prevent steel template, scaffolding and other damaged surface. Wall template cannot be as other objects in the platform on the template cannot be stacked weight, to prevent deformation and displacement o

15、f the template. Template surface coating of water-soluble release agent, to prevent oil pollution damage to the concrete surface and between the template and concrete bonding. Template demolition of no significance when skiing, prevent damage to the template. (2) the steel bar construction, finished

16、 product protection Reinforced transportation and storage of mechanical equipment and construction methods to appropriate, reinforcing steel bar under set up stow-wood neat pattern, and it is strictly prohibited to rough handling, prevent damage and deformation. Steel in the installation, pay attention to prevent deformation during the process of lifting. Reinforced during weaving, protection has installed steel finished product quality. Put embedded pipe