莱钢2没 烧结施工组织设计

上传人:壹****1 文档编号:457669992 上传时间:2022-07-30 格式:DOC 页数:317 大小:1.95MB
返回 下载 相关 举报
莱钢2没 烧结施工组织设计_第1页
第1页 / 共317页
莱钢2没 烧结施工组织设计_第2页
第2页 / 共317页
莱钢2没 烧结施工组织设计_第3页
第3页 / 共317页
莱钢2没 烧结施工组织设计_第4页
第4页 / 共317页
莱钢2没 烧结施工组织设计_第5页
第5页 / 共317页
点击查看更多>>
资源描述

《莱钢2没 烧结施工组织设计》由会员分享,可在线阅读,更多相关《莱钢2没 烧结施工组织设计(317页珍藏版)》请在金锄头文库上搜索。

1、deployment requirements, vigorously strengthen the partys ideological and political construction, strong regulation four winds , the ideological and political quality of party members and cadres has a new improved. But also to see, some members cadres belief not really letter, and slim not really re

2、pair, not understand Marx doctrine principle, not learning party of innovation theory, not believes in party of political advocates; some members cadres party of consciousness and members consciousness desalination, in party not statements party, and not love party, and not nursing party, and not fo

3、r party; some members cadres political discipline, and political rules relaxation, mouth no shoot, mess assessment jump on the party of policies and so on. Solve the problem of party members and cadres ideologically, must start with the ideological and political construction, through the two learnin

4、g education into ideological and political work in day-to-day political life of the party, do fine catch, catch, catch a long, continuous force for a long time to work. 3. two education is condensed power development needs. With the deepening of reform and the full implementation of the rule of law,

5、 we are building Qiang Fu MGM an important task of the new XXX, which we need to rally the wisdom in all aspects, form a partnership to promote the development of a strong force. So, grass-roots party and general members to deep awareness two learn a do learning education of important meaning, effec

6、tive activated grass-roots party fighting fortress role, full play members pioneer model role, in full district development strategy practice in the dang good vanguard, and led bar-headed geese, build a support has iron general belief, and iron general faith, and iron general discipline, and iron Ge

7、neral play of members cadres team, for full district work provides strong political, and thought and organization based. 4. two learning education is to enhance the ability of party members and cadres needed. The current, complex and volatile state of the world of the party, our party is facing unpr

8、ecedented difficulties and challenges since the ruling, but also shoulders an important responsibility of politics, society, history, more urgent goal of realizing the great rejuvenation of the Chinese nation. Specific to our personal, minority party members love to party, party, party, retaining th

9、e consciousness of the party still needs to be strengthened to work and conscientiousness, initiatives still need to be enhanced, capacity level needs to be further enhanced. Our party . Create two learn a do learning education of strong atmosphere on how carried out two learn a do learning educatio

10、n, central programme and also issued has learning education programme, Central Organization Department issued has learning education of programme, province, and municipal issued has implementation programme, for all members and at level above leaders of learning education, respectively proposed has

11、different requirements, district also specifically developed has 1+2+4+1 of implementation programme, respectively clear has learning of main content, and Focus on ways and means of solving problems and learning. We want to seriously implement the Central and provincial, city and district of deploym

12、ent requirements, as more strict and more practical spirit grasp this work. Innovative ways of learning, and earnestly study and understand. To always put learn Constitution Party rules, and learn series speech as two learn a do learning education of heavy in the of heavy, 中国第一冶金建设公司 施工组织设计目录目 录第一章综

13、合说明11.1编制依据11.2编制原则1第二章 工程概况32.1本工程场址区域位置32.2工程范围32.3工程简介32.4厂区自然条件52.4.1气象条件52.4.2工程地质概况7第三章 施工布署83.1施工总体布署83.2施工阶段划分8第四章 施工总平面布置144.1施工总平面布置原则144.2施工平面布置144.3施工道路144.4施工供水154.5施工用电154.6施工排水154.7施工通讯164.8总平面管理164.9现场管理标准16第五章 施工进度计划185.1工期目标185.2施工进度计划185.3保工期的主要措施185.3.1组织保证185.3.2资源保证195.3.3管理措施1

14、9第六章 劳动力计划236.1施工人员计划安排原则236.2选派的施工队伍246.3劳动力计划25第七章 主要施工机械设备计划27第八章 主要周转材料和方案用料29第九章 材料管理计划309.1工程材料采购及管理309.2主要材料供应的质量保障309.3施工周转材料的供应保障319.4采购资金的保障319.5业主提供物资(甲供料)的保障31第十章 主要施工方案3210.1测量控制方案3210.2土建工程施工方案4510.2.1土石方爆破工程4510.2.2土方工程4510.2.3柱下独立基础4710.2.4环冷机基础施工5010.2.5设备基础施工5210.2.6框架主体结构工程5510.2.

15、6.1钢筋制作5511.2.6.2钢筋绑扎与安装5710.2.6.3模板施工6010.2.7钢屋架制作6910.2.8钢屋架吊装7610.2.9压型钢板安装7810.2.10钢结构的制作8310.2.11砌体围护结构11010.2.12装饰装修施工11510.2.13屋面防水工程施工方案12110.2.14通廊施工12210.2.15钢筋混凝土烟囱施工12310.3机械设备安装13610.3.1烧结机的安装13610.3.2热破碎机安装15610.3.3皮带运输机的安装15819.3.4主抽风管道制作及安装15910.3.5主抽风机安装16210.3.6桥式起重机安装16310.3.7除尘风机安装16410.3.8一、二次混合圆筒机安装工艺16610.4管道工程17410.4.1管道加工一般规定17410.4.2管道支、吊架安装17910.4.3给排水管道18210.5电气安装施工18410.5.1电气楼盘柜安装方案18410.5.2动力变压器安装方案18710.5.3电气保护管安装方案19210.5.4电缆桥架安装方案19410.5.5电缆敷设方案19510.5.6 10kV高压电缆头制作

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 资格认证/考试 > 自考

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号