房产测量员国家职业标准

上传人:re****.1 文档编号:443075510 上传时间:2023-03-13 格式:DOC 页数:12 大小:272KB
返回 下载 相关 举报
房产测量员国家职业标准_第1页
第1页 / 共12页
房产测量员国家职业标准_第2页
第2页 / 共12页
房产测量员国家职业标准_第3页
第3页 / 共12页
房产测量员国家职业标准_第4页
第4页 / 共12页
房产测量员国家职业标准_第5页
第5页 / 共12页
点击查看更多>>
资源描述

《房产测量员国家职业标准》由会员分享,可在线阅读,更多相关《房产测量员国家职业标准(12页珍藏版)》请在金锄头文库上搜索。

1、detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required

2、 opening protection facilities; Lighting hole job safety miners lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating pe

3、rsonnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the constr

4、uction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 construction organizati

5、on name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, there should be adequate

6、lighting at night; Deep Foundation pit when soil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of ground

7、water seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook

8、 is solid, lifting vertical and not someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance wi

9、th the requirements, and cannot concentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site . 4-2-1 construction organization name pro

10、ject name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safetyHebei collaborative development, the Yangtze River

11、 economic belt development three the construction strategy, multi center, connecting the East and West, North and south through the network, the open area of city development pattern. We must focus on promoting the harmonious coexistence between man and nature. Remember that beautiful scenery is jin

12、shanyinshan, protect the environment is to protect productivity, improve the environment is to develop productive forces. Adhere to the green world, green benefits People, adhere to the basic state policy of conserving resources and protecting the environment, accelerate the transformation of the mo

13、de of economic development, vigorously support the development of green and clean production, and resolutely reject damage and destruction of the development mode of ecological environment and practice, must not be at the expense of the environment in exchange for the moment by the economic growth,

14、working out of a small price, low emission, good benefit, sustainable development path,Talent recruitment and the introduction of the only way to adapt to the development is the new growth and make the good ecological environment become the peoples quality of life, let the people breathe fresh air,

15、drink clean water, eat on be at ease food, living in the livable environment, and to feel the economic development brings tangible in the environmental benefits. To focus on the formation of opening to the outside world system. Open and lead the trend of the times. We should not only high quality, b

16、ut also dares to and good at going out, adhere to internal and external needs coordination, import and export balance, bringing out to both investment and technology simultaneously, to promote synergy strategic mutual trust, economic and trade cooperation and cultural exchanges, efforts to form a deep integration of mutual benefit Superclass shared development patterns of cooperation for economic development to develop a more broad space. To focus on the practice

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 建筑/环境 > 施工组织

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号