1、英文文献Engineering cost managementProject cost control emphasis should be transferred to the project construction early days, is transferred to the project decision and design stage. Project cost control in construction projects throughout the entire process, the key lies in the pre construction invest

2、ment decision-making with design phase, whereas in the investment decision is made, the key lies in designing. According to expert analysis: architectural design, in the preliminary design stage, design stage, construction design stage to the engineering effect were 75% 95%, 35% 75%, 5% 35%; while i

3、n the construction phase, through the optimization of construction organization design, construction cost saving the possibility of only 5% to 10%. We should put the focus shifted to the design stage, in order to get twice the result with half the effort.Pay attention to the technical and economic o

4、ptimization combination. The combination of technology with economy is most effective way to control engineering cost. China engineering fields for a long time did not do this. The lack of technical personnel economy idea, design thought is conservative, the design of the outcome of the economy are

5、not fully reflect. Therefore, we should solve the problem is to improve economic efficiency as the goal, in the construction process, organization, technology and economy organic ground union rises. Through the economic analysis, comparative study and effect evaluation, correct processing of advance

6、d technology and reasonable in economy between the relation of unity of opposites, strive to advanced technology under the conditions of economic rational, reasonable in economy based on advanced technology.Carry out limitation is designed method. To be consciously put the application of value engin

7、eering to the specific design, actively promote quota design in engineering design contract, by way of bidding. This has been proven in practice is an effective way, it is not only an economic problem, more precisely a technical and economic problems. This limitation is designed to effectively contr

8、ol the project cost. In order to make the limitation is designed to achieve the desired objectives, should be involved in the design personnel must be experienced skilled economic designer. Their design results must be practical, advanced and reasonable cost. Control of engineering cost on the other

9、 hand is the need for comparison, because the outcome is a process of gradual improvement, and not to decide, so the comparison is a measure of its practical, advanced and economical means.Do good project cost control in the process. ( 1) compilation of economic and feasible construction scheme. Bef

10、ore construction, construction enterprises should be combined with the construction drawings and the actual situation at the scene, their mechanical equipment, construction experience, the management level and technical specification acceptance criteria, a set of practical and feasible construction

11、scheme. The construction scheme is engineering implementation of the programme of action. ( 2) to technical personnel, materials, machinery and personnel staff communication and coordination. In the process of construction, construction technology, materials and mechanical personnel should cooperate

12、 closely, understand each other, to management as the core, to reduce costs for the purpose of. ( 3) to the project completion settlement. Strict supervision system. Control project cost effectively, in the early phase of the project shall be subject to supervision (including cost management ) syste

13、m. Through analyzing the design process of supervision, make the design more reasonable, cost control to limit the scope of, accomplish truly with the smallest investment maximize output.Strict supervision system. Control project cost effectively, in the early phase of the project shall be subject t

14、o supervision (including cost management ) system. Through analyzing the design process of supervision, make the design more reasonable, cost control to limit the scope of, accomplish truly with the smallest investment maximize output.To establish and perfect the independent project cost advisory bo

15、dy, cultivate a Zhi De have both engineering team. To establish a real sense of independent engineering cost consulting agencies. Through improving the laws and regulations, normative behavior, separate government functions from enterprise management, the establishment of independent business partne

16、rship, share-holding system, the limited responsibility system and other forms of organization, an industry-based, diversified services integrated project consulting company, build and development and reform the engineering cost intermediary service institutions, make construction project management of a gradual transition by an independent specialized agency in charge of project cost whole process tracking management, truly between owner and contractor plays an intermediary role. To strengthen