技术交底英文

上传人:jiups****uk12 文档编号:90665502 上传时间:2019-06-14 格式:DOC 页数:10 大小:56.54KB
返回 下载 相关 举报
技术交底英文_第1页
第1页 / 共10页
技术交底英文_第2页
第2页 / 共10页
技术交底英文_第3页
第3页 / 共10页
技术交底英文_第4页
第4页 / 共10页
技术交底英文_第5页
第5页 / 共10页
点击查看更多>>
资源描述

《技术交底英文》由会员分享,可在线阅读,更多相关《技术交底英文(10页珍藏版)》请在金锄头文库上搜索。

1、work section: foundation and main structure work item: steel workDisclosure item: matters need attention when steel being cut and bound Disclosure content:1. 10、8、6.5 steel should be straightened before to be cut with steel straightener. Workers should operate steel straightener as per operating ins

2、truction, avoiding to be hurt by steels re-bounce. 2. Workers should operate cut-off machine and bending machine as per operating instruction. During bending and transportation, workers should pay attention to if the steels are bended tightly to avoid hurting others. Check the executive condition: G

3、OODwork section: foundation and main structure work item: welding machineDisclosure item: safety operation Disclosure content: 1. Welding machine should be stored in dry and well insulating condition. Check if first and second insulated wires are in good condition, if there is a shield on wiring sec

4、tion, if electrode holder is in good condition and if null line works at connecting section. After checking and verifying there is no hidden danger, welding machine can be used. 2. Workers should take insulating measure when they work in wet condition, such as in gutter, pipe and boiler. They can us

5、e insulating board or rubber and wear insulating shoes. Work surroundings should be well ventilated. 3. Operators should wear insulating glove and insulating shoes when they are welding. Shelf, rail, pipe steel and another conductor are forbidden to connect welded object. Copper wire is allowed to c

6、onnect welded object. 4. Operators should have operating certificate. Available fire-fighting equipments should be around working place, with pro staff in charge of this equipment. Keep inflammable far away form welding work section. Make sure no fire can be make by splashing spark. 5. Cut off power

7、 supply before removing holder line. Workers can not climb up with holder line. 6. When work finishing, workers should cut off power supply and check work place, making sure that there is no hidden danger. They could leave after that. Check the executive condition: GOODWork section: foundation and m

8、ain structure work item: concrete work Disclosure item: concrete workDisclosure content:1. Transport concrete to casting concrete work section with tower crane. Lift van should be stopped at 200-300mm above floor. Concrete should be casted slowly in case of frame fall apart. 2. Workers should follow

9、 operating instruction when they vibrate concrete. Plug vibrator into concrete quickly and extract it slowly. Workers should follow operating instruction when they use planar vibrator.3. Workers should check frame during and after casting concrete. If descending happen to frame, worker should fix it

10、 in time. Check the executive condition: GOODWork section: foundation and main structure work item: site mix workDisclosure item:Disclosure content 1. Workers who join in this construction should have a good knowledge on their own safety technical operating specification. During operating, workers s

11、hould work seriously. Operating after drinking is forbidden. 2. Machinist must receive training, pass relative examination and get operating certificate so that they can operate machine independently.3. Workers should use protective equipment and safety protective facility in right way. Everyone mus

12、t wear safe helmet when he enter into site. Baring feet and wearing slipper are not allowed on site. Safety belt must be used when worker work at some high section. Entrance and exit should be covered by protective shed or others insolating facility when workers are involved with each other at the s

13、ame time. Protective rail, baffle and safety net should be fixed above 3 meters from ground. Regular check helmet and safety net. 4. Safety sign and caution plate should be fixed on scaffolding. They can not be removed unless construction crew allow removing. 5. Traffic signs should be fixed on site

14、. “Dangerous” or “caution” sign should be fixed at some dangerous places. Check the executive condition: GOODWork section: foundation and main structure work item: Disclosure item: season workDisclosure content: 1. Before and after storm, workers should check temporary facility, scaffolding, electro

15、mechanical equipment and temporary circuit. If leakage of electricity, leakage of rain, lean, deformation and sinking are found, workers should mend and fix them in time. Serious problems must be solved immediately. 2. Roads on site should be maintained well. 3. Workers should take ventilating and cooling measure when their work surroundings is too hot to work.Check the executive condition: GOOD

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 中学教育 > 其它中学文档

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号