DOC-薄壁不锈钢管卡压式连接施工工艺

上传人:206****923 文档编号:90600622 上传时间:2019-06-13 格式:DOC 页数:10 大小:110.04KB
返回 下载 相关 举报
DOC-薄壁不锈钢管卡压式连接施工工艺_第1页
第1页 / 共10页
DOC-薄壁不锈钢管卡压式连接施工工艺_第2页
第2页 / 共10页
DOC-薄壁不锈钢管卡压式连接施工工艺_第3页
第3页 / 共10页
DOC-薄壁不锈钢管卡压式连接施工工艺_第4页
第4页 / 共10页
DOC-薄壁不锈钢管卡压式连接施工工艺_第5页
第5页 / 共10页
点击查看更多>>
资源描述

《DOC-薄壁不锈钢管卡压式连接施工工艺》由会员分享,可在线阅读,更多相关《DOC-薄壁不锈钢管卡压式连接施工工艺(10页珍藏版)》请在金锄头文库上搜索。

1、In order to ensure normal teaching order, protecting students healthy growth, ensuring that national (property) is not lost, to prevent or minimize the occurrence of safety accidents, follow the prevent, rescue each other, ensure safety and reduce losses principle, according to the local conditions,

2、 make the management system. 1, the principal is the responsibility of school safety, school security under the leadership of President security work leading group. The head teacher to the leadership team is responsible for, implementation of the accountability system. 2, school monthly student know

3、ledge about safety education, education should be diversified in the form every safety education for students of classes per week should be targeted. To carry on emergency issues dealing with education in General, self-help and mutual rescue knowledge. Emergency calls (such as 110, 119, 122, 120, an

4、d so on) use common sense in education. 3, the establishment of major accident reporting system. School students report major accident within an hour of education; student run and disappearances to report; report of the accident to a written report in triplicate, a correctional centre, a police stat

5、ion, a township peoples Government shall not conceal the accident. 4 week, teachers are on duty system, establish and improve the leadership values; strengthen the education, management of teaching activities in schools to ensure normal teaching order; responsible for school safety leadership always

6、 maintained close contact and district police stations, canvassing support from the police station on school safety and help. 5, strengthening teachers moral education, establish a dedicated love, improving education quality, observe the students psychological changes at any time and take preventive

7、 measures, no corporal punishment and covert corporal punishment on students, student out of the classroom, schools may not be. 6, units or departments use student Street propaganda or participate in the celebrations, as well as participating in other social work, without approval of the Correctiona

8、l Centre, school principals consent, without organization. Without the approval of relevant departments, may organize students to participate in fire fighting, disaster relief and so on. 7, schools should educate students to obey the school rules and regulations, on time, on time home to prevent acc

9、idents. 8, school to school inspections on a regular basis, found hidden in time, and in severe cases, it is hard to eliminate immediately closed, and reported to the local peoples Government, education, and rule of law section. 9, the school should always check the internal walls, retaining walls,

10、ponds, railings, handrails, doors, Windows, staircases and a variety of sports, extracurricular activities, facilities such as fire safety, infrastructure security, unsafe facility to immediately repair and demolition to ensure that teachers and students work, learn, live venues and facilities are s

11、afe and reliable. Song Lin Xiang Liu Jia ping elementary school March 2016 song Lin Xiang Liu Jia ping primary school fire safety systems to enhance fire safety, protection of public property and the life and property safety of teachers and students, school fire safety into day-to-day management, is

12、 developing the following fire safety system. 1, strengthen fire safety education of the whole school. According to the requirements of the Fire Services Act, so that everyone has of keeping fire control safety, protecting fire control facilities, fire prevention, reports of fire薄壁不锈钢管卡压式连接施工工艺1、前言:

13、随着人们生活水平的提高,对生活空间的要求更加完美、舒适、现代化、人文化。对建筑物的环境、设施、使用功能也提出了越来越高要求,各种新设备、新材料、新工艺不断更新换代层出不穷,在建筑施工中的广泛推广应用,就是为了更好地满足人们日益增长的物质文化使用功能需求。同时,新工艺的更新改进、新材料的更新换代,更有利于解放劳动力,提高劳动效率,增强经济和社会效益。薄壁不锈钢管卡压式连接施工工艺的出现正是应运而生,该工艺从人工、机械、材料等各个方面具有明显的优点,适用于广泛推广。2特点2.1施工时间大幅度缩短管子插入管件后,用专用的卡压工具卡压、瞬间即可完成连接作业。不需要螺纹连接时复杂的套丝作业,也不需要焊接

14、时前处理、后处理作业,管道施工综合成本大幅度减少。2.2不需要熟练技术工螺纹连接或焊接连接时需要熟练的技术工,而卡压式管件系列产品是使用专用卡压工具,只要注意施工要领,谁都可以操作而且能保证质量均一。2.3不使用火源管道施工现场不使用火源,施工安全性能大大提高。2.4清洁施工不需要螺纹连接用的切削液或其它附件,也不需要焊接连接时的一系列焊剂。因此不必考虑这些添加物所带来的各种影响。2.5配管轻量化因为不锈钢管为薄壁式,与其它管种相比流量大,对于超高层建筑建筑配管的轻量化优势特别明显。3适用范围适用于各类民用建筑物冷水、热水、饮用水、洁净水输送管道。4工艺原理不锈钢管传统施工工艺,不论是焊接还是

15、丝扣连接,对管材壁厚有严格的要求,套丝及焊接连接过程中需要套丝机、电焊机等机具,切削液、焊剂等添加物(副材),而且必须是熟练的操作工才能顺利完成复杂的操作工序,需要消耗大量的人工,工艺成本较高。而采用薄壁钢管卡压连接施工工艺,管子插入管件后,用专用的卡压工具卡压、瞬间即可完成连接作业。不需要螺纹连接时复杂的套丝作业,也不需要焊接时前处理、后处理作业,管道施工综合成本大幅度减少。5工艺流程与操作要点5.1工艺流程安装准备预制加工干管安装立管安装支管安装管道试压管道冲洗消毒达标管道保温整理交工5.2施工准备5.2.1管道安装工程施工应具备下列条件:A、施工设计图纸和其它技术文件齐全,并经会审或审查

16、。B、施工方案或施工组织设计已进行技术交底。C、材料、施工人员、施工机具等能保证正常施工。D、施工现场的用水、用电和材料贮放场地条件能满足需要。E、提供的管材和管件符合国家现行有关产品标准,其实物与资料一致,并附有产品说明书和质量合格证。5.2.2施工前应了解建筑物的结构,并根据设计图纸和施工方案制定与土建工程及其它工程的配合措施。安装人员应经专业培训,熟悉薄壁不锈钢管和管件的性能,掌握操作要点。5.2.3对管材和管件的外观和接头应进行认真检查,管件、管材上的污物和杂质应及时清除。5.3管道敷设5.3.1管道明敷时,应在土建工程粉饰完毕后进行安装。安装前,应首先复核预留孔洞的位置是否正确。5.3.2薄壁不锈钢管固定支架间距不宜大于15m,热水管固定支架间距的确定应根据管线热胀量、膨胀节允许补偿量等确定。固定支架宜设置在变径、分支、接口及穿越承重墙、楼板的两侧等处。

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 中学教育 > 其它中学文档

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号