海韵大厦商办楼室内、外智能化系统工程施工组织设计

上传人:龙*** 文档编号:86710337 上传时间:2019-03-22 格式:DOC 页数:166 大小:635.50KB
返回 下载 相关 举报
海韵大厦商办楼室内、外智能化系统工程施工组织设计_第1页
第1页 / 共166页
海韵大厦商办楼室内、外智能化系统工程施工组织设计_第2页
第2页 / 共166页
海韵大厦商办楼室内、外智能化系统工程施工组织设计_第3页
第3页 / 共166页
海韵大厦商办楼室内、外智能化系统工程施工组织设计_第4页
第4页 / 共166页
海韵大厦商办楼室内、外智能化系统工程施工组织设计_第5页
第5页 / 共166页
点击查看更多>>
资源描述

《海韵大厦商办楼室内、外智能化系统工程施工组织设计》由会员分享,可在线阅读,更多相关《海韵大厦商办楼室内、外智能化系统工程施工组织设计(166页珍藏版)》请在金锄头文库上搜索。

1、videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the five water treatment 357 timetables for three years to resolve outstanding issues, obviously worked, victory of the year. The Countys departments at all levels must firmly establish the guanghui is gold

2、and silver green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well five water treatment of winning the war, ever-higher levels of comprehensive well-off society was built. (A)

3、 lay the sewage uphill battle. This year we will river water quality improved at the county level, up to five this basic objective grasp of pollution control that focus, with the focus on three things: a good job, clear rivers reaching the County created. Organization look back special inspection, t

4、he County garbage River, black and odorous River is Dragnet investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the one-stop strategy, improving the inferior five water quality monitoring stations work this year to ensure the E

5、limination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of clear rivers standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water

6、source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve effluent from sewage treatment rate, running accuracy, compliance requirement, speed up the towns support network construction, is focusing on nanotubes home last meters question. Do

7、mestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural dom

8、estic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the Sun problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to dig up mud

9、, as the deepening water of this years plays. Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policy requires detailed cleaning, dredging plan, planning ahead of time cleaning out

10、mud way out, according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intens

11、ity of目 录第一章总体概述一、施工组织总体设想二、方案针对性三、工程进度及质量目标四、备注说明五、编制依据六、工程概况七、与各单位间的配合7.1施工前的配合要求7.2施工期间的协调工作7.3 不可预见的协调八、智能化工程工作范围九、编制智能化工程总体实施方案十、优化施工图设计、施工技术督导和工程管理十一、对智能化工程进行质量验收和评定十二、智能化工程特点第二章 施工组织设计与实施方案综述一、项目管理二、商务管理三、设计管理四、施工管理五、工程的技术管理六、工程质量管理七、安全生产管理第三章 施工组织及人员安排一、项目组织结构1.1 项目经理职责1.2 副项目经理1.3 工程实施的人力资源

12、初步计划1.4 工程实施过程中紧急事件处理策略二、工程项目管理责任2.1工程管理及责任2.2设计联络和人员规定2.3包装要求2.4发运要求2.5运输及现场保管2.6安装及调试第四章总体施工方案一、基础工程1.1管道预埋主要施工程序及方法1.2线缆敷设施工方案及技术措施1.3计算机网络系统施工方法及技术措施1.4安防系统施工方法及技术措施1.5信息发布系统施工方法及技术措施1.6机房工程施工方法及技术措施1.7停车场管理系统施工方法及技术措施1.8公共与紧急广播系统1.9其他子系统二、设备安装调试工程三、总体管理措施四、施工准备4.1施工管理制度的建立4.2 施工技术准备4.3 现场准备4.4

13、施工队伍准备4.5 材料进场准备4.6 施工使用设备4.7主要施工、检测机械设备进场计划4.8主要材料、设备进场计划五、施工平面布置图5.1施工平面布置原则5.2施工平面布置5.3施工平面布置图及施工道路平面图六、施工部署6.1 施工指导思想6.2 项目施工管理架构6.3 施工阶段划分6.4 各施工段的施工顺序6.5 安装工程特点七、工程资源投入计划7.1 施工设备的投入7.2 劳动力的投入7.3 主要材料进场计划八、工程进度安排及保障8.1 施工进度计划8.2 工期保证措施8.3 工程的主要阶段第五章 工程实施步骤一、工程施工图设计1、工程深化设计要求2、设计图纸设计与会审流程二、施工步骤和

14、施工方法2.1系统工程施工图具体设计深度2.2施工步骤、注意事项:三、设备材料进场管理四、质量保证计划五、安全生产计划第六章 工程实施中几个重点及对策一、工程实施与土建、装修工程在时间进度上的配合二、线管预埋和线槽架设要求第七章 工程质量保证措施一、 建立质量保证机构,强化工程质量管理二、 加强项目部质量管理工作,从提高人员素质入手三、 严把材料进货关,确保施工机具的正常使用四、 优化施工方法,达到预防为主的目的五、 加强工序质量检查,做好成品保护工作六、 质量保证体系6.1公司质量体系构成6.2公司质量体系运行情况6.3系统工程质量保证体系6.4质量保证措施6.5工序质量检验和质量控制6.6

15、施工质量通病第八章施工进度安排一、施工进度计划说明二、简要说明三、施工进度保证措施第九章 工程实施过程中的重要管理措施一、节约措施十二条二、安全生产、文明施工措施1、安全生产施工章程2、施工安全保证措施3、工地文明施工4、文明施工保证措施三、工地现场消防措施四、工地现场成品、半成品保护措施五、现场施工用水电措施六、环境保护措施七、施工期间防雷、防风及防雨等措施八、地下管线及其它地上地下设施的加固措施室外管网、支路管加固措施室外孔井加固措施地下室桥架加固措施地下室支路管加固措施第十章 竣工验收10.1总 则10.2监控系统验收规范10.3周界防范系统验收规范10.4门禁系统验收规范10.5停车场系统验收规范10.6计算机网络及通讯系统验收10.6.1通讯系统测试10.6.2计算机网络系统10.7公共与紧急广播系统测试与验收10.7.1公共与紧急广播系统的试运行测试与验收10.7.2竣工测试与验收A.验收内容B.仪器C.验收步骤第十一章中标后服务计划