福斯流体控制(苏州)有限公司新建工程混凝土施工方案

上传人:龙*** 文档编号:86710335 上传时间:2019-03-22 格式:DOC 页数:11 大小:71KB
返回 下载 相关 举报
福斯流体控制(苏州)有限公司新建工程混凝土施工方案_第1页
第1页 / 共11页
福斯流体控制(苏州)有限公司新建工程混凝土施工方案_第2页
第2页 / 共11页
福斯流体控制(苏州)有限公司新建工程混凝土施工方案_第3页
第3页 / 共11页
福斯流体控制(苏州)有限公司新建工程混凝土施工方案_第4页
第4页 / 共11页
福斯流体控制(苏州)有限公司新建工程混凝土施工方案_第5页
第5页 / 共11页
点击查看更多>>
资源描述

《福斯流体控制(苏州)有限公司新建工程混凝土施工方案》由会员分享,可在线阅读,更多相关《福斯流体控制(苏州)有限公司新建工程混凝土施工方案(11页珍藏版)》请在金锄头文库上搜索。

1、videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the five water treatment 357 timetables for three years to resolve outstanding issues, obviously worked, victory of the year. The Countys departments at all levels must firmly establish the guanghui is gold

2、and silver green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well five water treatment of winning the war, ever-higher levels of comprehensive well-off society was built. (A)

3、 lay the sewage uphill battle. This year we will river water quality improved at the county level, up to five this basic objective grasp of pollution control that focus, with the focus on three things: a good job, clear rivers reaching the County created. Organization look back special inspection, t

4、he County garbage River, black and odorous River is Dragnet investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the one-stop strategy, improving the inferior five water quality monitoring stations work this year to ensure the E

5、limination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of clear rivers standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water

6、source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve effluent from sewage treatment rate, running accuracy, compliance requirement, speed up the towns support network construction, is focusing on nanotubes home last meters question. Do

7、mestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural dom

8、estic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the Sun problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to dig up mud

9、, as the deepening water of this years plays. Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policy requires detailed cleaning, dredging plan, planning ahead of time cleaning out

10、mud way out, according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intens

11、ity of 混凝土工程施工方案南通五建建设工程有限公司2012年9月27日 混凝土工程专 项 施 工 方 案 工程名称:福斯流体控制(苏州)有限公司新建工程 建设单位:福斯流体控制(苏州)有限公司 设计单位:苏州工业园区设计研究院股份有限公司 监理单位:苏州建园建设工程顾问有限责任公司 施工单位:南通五建建设工程有限公司 编制: 审核: 审批: 日期: 福斯流体控制(苏州)有限公司建厂房工程混凝土工程施工方案一、工程概况:福斯流体控制(苏州)有限公司新建厂房工程是由福斯流体控制(苏州)有限公司投资的工业项目。位于苏州市工业园区强胜路北、利胜路东。是由南通五建建设工程有限公司承建。二、砼的供应

12、:因本工程工程砼量大,我项目部为能有充足的砼供应将采用上海双秋混凝土有限公司预拌商品砼。预拌砼质量按国标GB14902-94预拌混凝土,确保了砼的质量达到设计要求及有关规范的规定。砼的浇筑供应标号按图纸设计标号进行供应。三、砼的浇筑前的准备:1.为了加快工程施工进度,使得砼工序尽快地插入,计划将竖向构件的柱、墙的砼浇筑采用泵车布料,水平构件的梁板砼采用泵送,在尽量利用工作面,提前完成浇筑工作。2.每次砼浇筑前按砼的购销合同于24小时前,填写生产联系单送达砼供应公司,使砼的供应准时到达工地,确保砼浇注时间的准确,保证工程进度。3.砼浇筑部位的前道工序已全部施工完毕,并办理好了隐蔽工程验收手续。模

13、板已清理干净,并淋水湿润。4.每次砼浇筑前及时填报砼浇注申请令报现场监理,在得到砼浇筑令后开始浇注砼。5.机具准备:(1)振动器采用插入式和平板式两种,其中墙、柱、梁采用插入式振动器,板采用平板式振动器。(2)斗车采用0.09m3规格的准备10辆。(3)通讯:泵站与浇筑现场之间的通讯采用电话联系,以保证砼浇筑工作顺利进行。6人员准备1、泵送混凝土施工中,配备混凝土输送泵司机2人,搅拌机司机若干人(视浇筑方量决定),指挥信号联络1人,混凝土入泵车前检测坍落度1人,混凝土布料杆操作人2人,机修电工1人,混凝土振捣工10人,整个生产线需25至30人。各工种需持证上岗并保证打混凝土期间维修人员随叫随到

14、,配备一定的维修配件,全力保证工程需要。7.作业条件:(1)泵车空载运行一段时间,观察工作状态是否正常,正常否才能泵送砼。(2)润滑管道的水泥砂浆以准备好。(3)隐蔽工程验收手续,浇筑令已经办理好。四、操作工艺:(一) 柱墙砼浇筑:1.柱墙砼浇筑采取泵车布料及人工布料方式进行,按中、边、角的顺序依次施工,有利于整体结构的稳定,并可防止砼的浇注过程中的侧压力而引起梁柱的倾斜和偏移。2.柱墙砼分层浇筑振捣,每层浇筑厚度控制在500左右,砼的下料点应分散布置,循环推进,连续进行,用振动棒振实,浇筑过程中派有经验泥水工观察是否有漏振捣,随时敲打模板,有异常现象及时与上部振捣人员联系,并报告施工值班人员及时采取措施进行处理。3.柱截面小于300300mm时应先把振动棒插到底且振动,再向柱内下料,然后边振边拔振动器连续浇筑完毕。4.浇筑墙体洞口时,要使洞口两侧砼高度大体一致,振捣时振动棒应距洞边300以上,并从两侧同时振捣,以防止洞口移位变形。大洞口下部模板应开口并补充振捣,然后再封口。5.柱子的施工缝按规范留置在主梁底平。6.墙体的施工缝按规范留置在主梁底或门过梁跨度1/3范围内。7 .砼浇筑完毕应清理干净施工现场,做到工完料清。(二)梁