浙江金日翠雍天地二标段住宅楼施工组织设计

上传人:龙*** 文档编号:86710333 上传时间:2019-03-22 格式:DOC 页数:178 大小:683KB
返回 下载 相关 举报
浙江金日翠雍天地二标段住宅楼施工组织设计_第1页
第1页 / 共178页
浙江金日翠雍天地二标段住宅楼施工组织设计_第2页
第2页 / 共178页
浙江金日翠雍天地二标段住宅楼施工组织设计_第3页
第3页 / 共178页
浙江金日翠雍天地二标段住宅楼施工组织设计_第4页
第4页 / 共178页
浙江金日翠雍天地二标段住宅楼施工组织设计_第5页
第5页 / 共178页
点击查看更多>>
资源描述

《浙江金日翠雍天地二标段住宅楼施工组织设计》由会员分享,可在线阅读,更多相关《浙江金日翠雍天地二标段住宅楼施工组织设计(178页珍藏版)》请在金锄头文库上搜索。

1、videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the five water treatment 357 timetables for three years to resolve outstanding issues, obviously worked, victory of the year. The Countys departments at all levels must firmly establish the guanghui is gold

2、and silver green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well five water treatment of winning the war, ever-higher levels of comprehensive well-off society was built. (A)

3、 lay the sewage uphill battle. This year we will river water quality improved at the county level, up to five this basic objective grasp of pollution control that focus, with the focus on three things: a good job, clear rivers reaching the County created. Organization look back special inspection, t

4、he County garbage River, black and odorous River is Dragnet investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the one-stop strategy, improving the inferior five water quality monitoring stations work this year to ensure the E

5、limination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of clear rivers standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water

6、source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve effluent from sewage treatment rate, running accuracy, compliance requirement, speed up the towns support network construction, is focusing on nanotubes home last meters question. Do

7、mestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural dom

8、estic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the Sun problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to dig up mud

9、, as the deepening water of this years plays. Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policy requires detailed cleaning, dredging plan, planning ahead of time cleaning out

10、mud way out, according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intens

11、ity of 三和翠雍天地2#、3#楼施工组织设计 目 录第一章 工程综合说明 3 一、工程概况 3 二、施工管理目标 4 三、编制依据 5 第2章 施工组织部署 7 一、施工组织管理 7第3章 项目经理、管理班子配备及简况 26第4章 施工进度计划 30第5章 施工现场平面布置 36第六章 施工机械及周转材料配置 46第七章 主要分部分项工程施工方案 50第八章 工程项目施工顺序 55第九章 主要分项工程的施工方法 57第十章 脚手架工程 73第十一章 关键工序质量保证措施 97第十二章施工质量保证措施和目标 118第十三章 安全生产施工措施 146第十四章 文明施工标化管理措施 169附件

12、:一、 施工现场布置平面图二、 施工总进度网络图第一章工程综合说明一、工程概况项目名称:三和翠雍天地2#、3#楼工程地点:西宁市经济技术开发区民和路2号建设单位:青海三和房地产开发有限责任公司设计单位:深圳华博建筑设计有限责任公司勘察单位:青海建安岩土工程勘察技术有限公司监理单位:西宁青大工程建设监理有限公司施工单位:浙江金日建设有限公司(一)、工程阐述 三和翠雍天地2#、3#楼由青海三和房地产开发有限责任公司开发建设,为高层住区,工程地点位于西宁市经济技术开发区民和路2号。是集商业、住宅及地下停车为一体的多功能的智能型建筑。建筑为一类高层住宅楼耐火等级:地下层为一级、地上层为一级。地下一层为

13、车库、地上二层至二十二层为高层住宅,一二层局部为商业网点,部分为人防。工程结构形式为:剪力墙结构。建筑面积约37404.86平方米,建筑高度为66.40米。1、墙体工程:本工程除采用钢筋混凝土墙,其余采用蒸压加气混凝土砌块。2、屋面、卫生间厨房防水:防水等级为II级。3、地下室防水:该工程地下室防水等级为二级,地下室防水以结构自防水为主,外包防水为辅,临边面结构混凝土抗渗等级为S6.4、外墙装饰工程主要采用涂料墙面和面砖墙面。5、楼地面工程主要采用水泥砂浆(细石砼)楼地面。(二)业主要求1、工期要求本工程计划工期共583日历天,不包括休息日。施工工期:2012年5月8日至2013年12月31日

14、。2、质量要求一次性交验合格。(三)本工程的其它施工特点及基本对策1、业主对本工程的施工成果的期望值很高,我公司对完成本工程管理目标充满必胜信心,将不遗余力给以技术、人力、物力等的全方位支持。我们深信凭借我公司的实力和进取精神,业主的期望定能圆满地实现。二、施工管理目标1、质量目标我们将运用现代化的管理手段和方法,配备先进的施工设备,组织一支精干、经验丰富的施工队伍,以ISO9000质量管理体系、OHSAS18000职业安全卫生管理体系及ISO14000环境管理体系为标准,按项目法组织施工,充分发挥我公司的优势,全面履行施工合同中的各项承诺。本工程的质量目标是确保一次性交验合格,主体结构创优质结构工程,并确保本工程为“无渗漏”工程。2、工期目标根据业主要求,考虑我公司自身综合实力,结合本工程特点,在保证工程质量的前提下,克服施工中可能遇到的不利因素的影响,确保在施工工期内完成合同约定的全部施工任务并完成验收交付业主使用。故现场临设的布置,施工方案及进度计划,要充分考虑到现场环境和各种因素,并结合我公司的综合实力和管理优势,采取科学的管理,合理组织施工,确保早日竣工。3、安全文明施工我们将严格按照国家有关安全生产法规和规范组织安全生产,杜绝重伤及死亡事故,杜绝机械、火灾事故,月轻伤率控制在1.5以内,施工现场严格按照建筑施工安全检查标准及西宁市建设工程文明施工管理暂行

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 建筑/环境 > 设计及方案

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号