毕业论文外文翻译-高桩码头加固方法分析

上传人:suns****4568 文档编号:81035999 上传时间:2019-02-20 格式:DOC 页数:15 大小:330.50KB
返回 下载 相关 举报
毕业论文外文翻译-高桩码头加固方法分析_第1页
第1页 / 共15页
毕业论文外文翻译-高桩码头加固方法分析_第2页
第2页 / 共15页
毕业论文外文翻译-高桩码头加固方法分析_第3页
第3页 / 共15页
毕业论文外文翻译-高桩码头加固方法分析_第4页
第4页 / 共15页
毕业论文外文翻译-高桩码头加固方法分析_第5页
第5页 / 共15页
点击查看更多>>
资源描述

《毕业论文外文翻译-高桩码头加固方法分析》由会员分享,可在线阅读,更多相关《毕业论文外文翻译-高桩码头加固方法分析(15页珍藏版)》请在金锄头文库上搜索。

1、大连海洋大学本科毕业设计外文资料及翻译外文资料及译文Analysis of Strengthening Method For High-Piled WharfsAbstract The main factors which cause the structural disease of high-piled wharfs, and the characteristic of strengthening methods are introduced and analysed taking a high-piled wharf as an example le. Finaly a strength

2、ening and rehabilitation method for the wharf is proposed, which can be used as the reference for the design of similar structural project subsequently.KEY WORDS: strengthening, high-piled wharf, structural design1.ForewordTo guarantee the safe and normal usage of a wharf, in addition to at design,

3、the construction stage provides the good inborn condition for a wharf, at use the stage to also need to catty on the long-term maintenance to a wharf. When a wharf appears the harm, aging etc. phenomenon or suffers the disaster, still need to carry on the check and examine a patient to a wharf, and

4、adopt to correspond of maintain or reinforce the measure.The disease of a wharf harms the main performance to become rusty the eclipse, concrete carbonization, concrete corrosion, the concrete piece to cut to face to decrease for the reinforcing bar, the concrete opens the, water, leaking, the struc

5、ture spend greatly, the structure tilts to one side to be partial to move etc. But produce the factor that these disease harm contain following several aspectses:(1) The building design quantity level, design especially medium to the consideration degree of the consideration degree of the durables;(

6、2) The function that constructs the material satisfies the degree of enduring sex request;(3) The construction quantity level, the craft measure of the exaltation concrete and the structure durable;(4) Building the environment condition of the place, an atmosphere, groundwater and corrosion factor w

7、ithin the industry environment.Table 1 introduce in common use reinforce the characteristic of method and apply the circumstance, and combine the solid example of engineering carries on the analysis.Table 1Reinforce the methodMain characteristicsApply the scopeThe enlargement cuts to face the method

8、Enlarge the piece to cut with the of same race material to accumulate in every aspect, exaltation structure loading ability and satisfy normal usage requestGeneral structure of beam, plank, pillar, walletc.A steel reinforces the methodReinforce with a steel at an on all sides pack, cut to face the s

9、ize and external to affect very small, loading the ability exaltation compare reatly, be subjected to the dint more dependableBe applicable to disallow to enlarge the concrete to cut to face but need the structure of the exaltation loading dint againThe exterior glues the steel to reinforce the meth

10、odGlue to stick the steel plate in an exterior of the concrete, load the dint with the exaltation, cut to face the size increment not much, the external appearance influence is smallNormal temperature environment under of is generally be subjected to by bend, to pull the piece of and medium light cl

11、ass the work makes the hoist beamGlue the fiber to build up compound material cloth to reinforce outsideThe exterior glues to stick carbon fiber cloth etc.Load the dint exaltation very big, glue to stick easily, cut to face to increase the thickness very small, outward the view affect smaller, the a

12、nti-decays the ability strongNormal temperature environment under of be subject to pull, be subjected to curved, be subjected to press the piece of and across the corrosion an etc. of piece, anti-greatlyPrepare should the dint reinforce the methodAdopt the in addition prepare should the dint steel p

13、ull the pole or support the pole, carrying on reinforce to the structure, loading the dint and the anti-etc. with the exaltationAcross the structure and large structure greatlyIncrease to establish the fulcrum to reinforce the methodIncrease to establish to prop up the point, let up the structure to

14、 across the degree and transform, correspond to improve the total loading ability of structureBeam, plank and an etc.Give the beam pulls out the pillar out the pillar techniqueUnder the condition of not dismantle or little dismantle the upper part structure or tore down or replace or connect the tec

15、hnique of the long postChange usage function and enlarge the old building of the indoor space reformationIncrease to establish to prop up the system and shear the dint wall to reinforce the methodStrengthen the structure resistance level lotus carries the ability and sides to just degree and stabili

16、tyThe anti-side dint reinforceIncrease to establish to pull the knot contact to reinforce the methodIn the house peripheral, lengthways, horizontal, to increase and establish and correspond of pull the knot contact, strengthen the whole stability of structure, keep accident trouble from descend the occurrence tumbles down continuouslyThe assemble type structure anti-tumbles down continuously and the anti-

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 中学教育 > 其它中学文档

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号