毕业论文(设计)-土木工程外文翻译原文+翻译(桥梁)

上传人:zhuma****mei1 文档编号:53750059 上传时间:2018-09-04 格式:DOC 页数:15 大小:70.52KB
返回 下载 相关 举报
毕业论文(设计)-土木工程外文翻译原文+翻译(桥梁)_第1页
第1页 / 共15页
毕业论文(设计)-土木工程外文翻译原文+翻译(桥梁)_第2页
第2页 / 共15页
毕业论文(设计)-土木工程外文翻译原文+翻译(桥梁)_第3页
第3页 / 共15页
毕业论文(设计)-土木工程外文翻译原文+翻译(桥梁)_第4页
第4页 / 共15页
毕业论文(设计)-土木工程外文翻译原文+翻译(桥梁)_第5页
第5页 / 共15页
点击查看更多>>
资源描述

《毕业论文(设计)-土木工程外文翻译原文+翻译(桥梁)》由会员分享,可在线阅读,更多相关《毕业论文(设计)-土木工程外文翻译原文+翻译(桥梁)(15页珍藏版)》请在金锄头文库上搜索。

1、The bridge crack produced the reason to simply analyse In recent years, the traffic capital construction of our province gets swift and violent development, all parts have built a large number of concrete bridges. In the course of building and using in the bridge, relevant to influence project quali

2、ty lead of common occurrence report that bridge collapse even because the crack appears The concrete can be said to “ often have illness coming on “ while fracturing and “ frequently-occurring disease “, often perplex bridge engineers and technicians. In fact , if take certain design and constructio

3、n measure, a lot of cracks can be overcome and controlled. For strengthen understanding of concrete bridge crack further, is it prevent project from endanger larger crack to try ones best, this text make an more overall analysis , summary to concrete kind and reason of production , bridge of crack a

4、s much as possible, in order to design , construct and find out the feasible method which control the crack , get the result of taking precautions against Yu WeiRan. Concrete bridge crack kind, origin cause of formation In fact, the origin cause of formation of the concrete structure crack is compli

5、cated and various, even many kinds of factors influence each other , but every crack has its one or several kinds of main reasons produced . The kind of the concrete bridge crack, on its reason to produce, can roughly divide several kinds as follows :(1) load the crack caused Concrete in routine qui

6、et .Is it load to move and crack that produce claim to load the crack under the times of stress bridge, summing up has direct stress cracks , two kinds stress crack onces mainly. Direct stress crack refer to outside load direct crack that stress produce that cause. The reason why the crack produces

7、is as follows, 1, Design the stage of calculating , does not calculate or leaks and calculates partly while calculating in structure; Calculate the model is unreasonable; The structure is supposed and accorded with by strength actually by strength ; Load and calculate or leak and calculate few; Inte

8、rnal force and matching the mistake in computation of muscle; Safety coefficient of structure is not enough. Do not consider the possibility that construct at the time of the structural design; It is insufficient to design the section; It is simply little and assigning the mistake for reinforcing ba

9、r to set 河北联合大学轻工学院本科毕业设计外文翻译 第1页up; Structure rigidity is insufficient; Construct and deal with improperly; The design drawing can not be explained clearly etc 2, Construction stage, does not pile up and construct the machines , material limiting ; Is it prefabricate structure structure receive str

10、ength characteristic , stand up , is it hang , transport , install to get up at will to understand; Construct not according to the design drawing, alter the construction order of the structure without authorization , change the structure and receive the strength mode; Do not do the tired intensity c

11、hecking computations under machine vibration and wait to the structure . 3, Using stage, the heavy-duty vehicle which goes beyond the design load passes the bridge; Receive the contact , striking of the vehicle , shipping; Strong wind , heavy snow , earthquake happen , explode etc Stress crack once

12、means the stress of secondary caused by loading outside produces the crack. The reason why the crack produces is as follows, 1, In design outside load function , because actual working state and routine , structure of thing calculate have discrepancy or is it consider to calculate, thus cause stress

13、 once to cause the structure to fracture in some position. Two is it join bridge arch foot is it is it assign “ X “ shape reinforcing bar , cut down this place way , section of size design and cut with scissors at the same time to adopt often to design to cut with scissors, theory calculate place th

14、is can store curved square in , but reality should is it can resist curved still to cut with scissors, so that present the crack and cause the reinforcing bar corrosion. 2, Bridge structure is it dig trough , turn on hole , set up ox leg ,etc. to need often, difficult to use a accurate one diagramma

15、tic to is it is it calculate to imitate to go on in calculating in routine, set up and receive the strength reinforcing bar in general foundation experience. Studies have shown , after being dug the hole by the strength component , it will produce the diffraction phenomenon that strength flows, inte

16、nsive near the hole in a utensil, produced the enormous stress to concentrate. In long to step prestressing force of the continuous roof beam , often block the steel bunch according to the needs of section internal force in stepping, set up the anchor head, but can often see the crack in the anchor firm section adjacent place. So if deal with improper, in corner or component form sudden change office , block place to be easy to appear crack strength reinforcing bar of structure

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 学术论文 > 毕业论文

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号