资源描述

《A县城给水工程初步设计》由会员分享,可在线阅读,更多相关《A县城给水工程初步设计(183页珍藏版)》请在金锄头文库上搜索。

1、A 县城给水工程初步设计中文摘要A 县城给水工程设计主要内容包括取水系统设计、给水处理系统设计和给水管网系统设计三大部分。设计书由设计说明书和设计计算书两部分组成。取水工程采用一级泵站加压双管将水输至新建净水厂方案。该方案拟在盐井河水库边建一级加压泵站,水一次加压至净水厂,经净化后,在二泵房采用变频供水方式二级加压将其配至城市管网。该工程远期设计规模为 3.3 万吨/日,水厂占地 1.67 公顷,以盐井河水库作为取水水源。水厂采用常规净水处理工艺,主要构筑物为取水泵房、配水井、网格絮凝池、斜管沉淀池、无阀滤池、清水池、吸水井和二泵房。选用聚合氯化铝为混凝剂,液氯为消毒剂。网格絮凝池反应时间约

2、8mins,斜管沉淀池清水区上升流速 2.00mm/s,斜管聚乙烯材料制作,采用蜂窝六边形,板厚 0.4mm,无阀滤池滤速 V=8.0m/h,水冲强度 15L/s.m2,冲洗时间为 5mins。出水水质达生活饮用水卫生标准。为了保证供水的安全性及可靠性,配水管网采用环状布置形式,在整个供水区域中共设置 24 个环。输水管管材采用钢管,管网管材采用球墨铸铁管。关键词关键词:取水系统、给水处理系统、给水管网系统ABSTRACTIABSTRACTA County water supply engineering design includes three large parts: water int

3、ate design, water treatment plant design and distribution pipe network design. The design book consists of design specification and design calculations.Two pressurized-water pipes are used to transport raw water to the new water treatment plant. The program proposes that the pumping station is built

4、 at the side of Yanjinghe reservoir. Raw water is sent to the water purification plant after pressed once, then purified to distribute water to the urban pipe network.The long-term scale of design is 33,000 cubic meters per day. The water treatment plant covers an area of 1.67ha. The Yanjinghe reser

5、voir is used as the water source of this project. It takes some cultural water purification courses. One pumping station, distribution well, tube static mixer, screen flocculation tank, tube sellter, pressure filter, cleanwater reservoir, absorbing well and second pumping station are the main constr

6、actions of the water treatment plant.Select polymerize aluminum chloride as the coagulant, liquid chlorine as the disinfectant. Screen flocculation tanks reaction time is about 8 minutes. Qingshui district increased velocity of tube settler is 2.00mm/s, with polyethylene material used hexagonal hone

7、ycomb, 0.4mm thick. Rae of filtration of pressure filter is 8.0m/h,and intensity of back washing is 15L/s.m2, whose washing time is 5mins. The treated water quality can reach the quality of drinking water standard.In order to ensure the safety and security of water supply, distribution system is mad

8、e up of pipe network. There are 24 circles in the distribution system. Water-delivery pipes are made of steel tube, and network pipes are made of Ductile costiron pipe.Key words: water intake system, water treatment system, distribution pipe network systemII目目 录录中文摘要.I ABSTRACT.III 引 言 .1 第一篇 A 县城给水

9、工程设计说明书 .3 1概述.31.1 设计题目.31.2 设计目的.31.3 任务及主要内容.31.4 基本资料.31.4.1 城市概况.31.4.2 供水现状.41.4.3 建设的必要性.41.4.4 城市人口.41.4.5 城市各区房屋层数和卫生设备情况.41.4.6 靠城市水厂供水的主要工业企业情况.51.4.7 城区绿化用地及主干道长度.51.4.8 水资源.51.4.9 工程地质情况.51.4.10 气象资料.51.4.11 水源水质.61.4.12 时变化系数.6 2水厂厂址选择.72.1 净水厂位置选择.72.2 厂址选择的原则.7 3给水系统.113.1 水源取水系统.113.1.1 给水水源分类.