《某毛纺厂废水处理工程工艺设计(doc毕业设计论文)》由会员分享,可在线阅读,更多相关《某毛纺厂废水处理工程工艺设计(doc毕业设计论文)(42页珍藏版)》请在金锄头文库上搜索。
1、摘 要本设计题目为“宣化某毛纺厂废水处理工程工艺设计” ,该工程所处理的污水主要是由染色废水和洗线、洗毯、刺绣车间废水组成。经建设方确认,本设计规模按日最大处理水量:2500 m3/d(包括处理站自用水排水量) 。污水主要污染物CODcr、SS、BOD5、S2-、色度等,其污水水质如下:染色废水:CODcr=1495mg/L,BOD5=340mg/L,SS=540mg/L,S2-=1.35-2.16mg/L,PH=3.7-8.62,色度=300 倍;洗线、洗毯、刺绣车间废水:CODcr=480mg/L,BOD5=300mg/L,SS=200mg/L,S2-=1.2mg/L,PH=3.7-8.6
2、2,色度=50倍。冬季平均温度-14.9 ,夏季平均温度为 29.2,年平均降水量 427.1mm,冬季主导风向为西北,夏季主导风向为东南。处理站处理水质为:BOD520mg/l,CODcr100mg/l,SS70mg/l,PH=6-9,色度50 倍,出水水质符合国家的二级排放标准。本设计采用水解酸化加生物接触氧化处理废水。处理构筑物主要有调节池、水解酸化池、生物接触氧化池、竖流式沉淀池、浓缩池、泵房、脱水机房和鼓风机房等。其主要构筑物生物接触氧化池采用传统的一段式接触氧化,总共采用两座,每座分为八格,处理效果明显。预处理的调节池和水解酸化池有效的降低了污水的各项指标,为生物接触氧化池的进水,
3、提供了最佳进水指标,同时还有效的降低了污水的色度,再加上后面的竖流式沉淀池的絮凝沉淀作用,色度指标大大降低,基本上可以满足出水的要求。关键词:印染废水 废水处理 生物接触氧化ABSTRACTThe design entitled “Xuanhua a woolen mill wastewater treatment process design,“ The works are mainly treated sewage effluent from dyeing and washing lines, washing blankets, embroidery workshop wastewater
4、 components. Confirmed by the construction side, the design of handling the largest-scale water daily : 2500 cubic meters per day (including water discharge from the station). Sewage major pollutants CODcr, SS, BOD5, S2-, color, the effluent quality are as follows : dyeing wastewater : CODcr=1495mg/
5、L, BOD5=340mg/L, SS=540mg/L. S2-=1.35-2.16mg/L, pH=3.7-8.62, color 300 times; washing line, washing blankets, embroidery workshop wastewater:CODcr=480mg/L, BOD5=300mg/L. SS=200mg/L, S2-=1.2mg/L, PH=3.7-8.62. color 50 times. The average winter temperature -14.9 , average summer temperature of 29.2 ,
6、with the average rainfall 427.1mm. Winter winds led to the northwest, the summer winds led to the southeast. Water Disposal Station : BOD5 20mg/l, CODcr 100mg/l, SS 70mg/l, PH=6-9, color 50, the effluent quality in the states two emission standards. The design acid hydrolysis Biological oxidation wa
7、stewater treatment. Dealing with the main structures regulation pool, pool acid hydrolysis, biological oxidation pond, the vertical flow sedimentation tank, concentrated pool, pumping stations, Dehydration room and the other blower. The main structures of biological oxidation pond used for the tradi
8、tional contact-oxidation, using a total of two, each divided into eight blocks. significant treatment effect. Pretreatment Regulation pools and pool acid hydrolysis effectively reduce the sewage indicators of biological oxidation pond inundated. Intake provides the best indicator, but also effective
9、ly reduce sewage color, plus behind the vertical flow sedimentation tank of flocculation and sedimentation, color indicators greatly reduced. Basically meet water requirements. Keywords : dyeing wastewater wastewater treatment biological oxidation 目 录第 1 章 概述61.1 设计依据及设计任务61.1.1 设计题目61.1.2 设计依据61.2 设计水量81.3 处理程度81.4 去除率8第 2 章 污水处理站方案的确定92.1 确定污水处理方案的原则92.2 污水处理方案的确定92.2.1 处理标准的确定92.2.2 污水处理路线选择92.3 污水处理工艺流程方案介绍112.3.1 传统活性污泥法112.3.2 氧化沟工艺122.3.3 生物接触氧化工艺132.4 工艺流程的确定