高校教师业务管理系统设计论文

上传人:Bod****ee 文档编号:47196233 上传时间:2018-06-30 格式:DOC 页数:54 大小:1.13MB
返回 下载 相关 举报
高校教师业务管理系统设计论文_第1页
第1页 / 共54页
高校教师业务管理系统设计论文_第2页
第2页 / 共54页
高校教师业务管理系统设计论文_第3页
第3页 / 共54页
高校教师业务管理系统设计论文_第4页
第4页 / 共54页
高校教师业务管理系统设计论文_第5页
第5页 / 共54页
点击查看更多>>
资源描述

《高校教师业务管理系统设计论文》由会员分享,可在线阅读,更多相关《高校教师业务管理系统设计论文(54页珍藏版)》请在金锄头文库上搜索。

1、calculated shall pay tender fee (tender agency fee accounts for the actual bidding agent item for fares). Than the selected person tendering agents service charge control the upper and lower limits, Cap for the State Development Planning Commission of the interim measures for the management of tende

2、ring agents service charges (meter prices 20021980) of tendering agents service fees under 100%, the lower limit for the State Development Planning Commission of the interim measures for the management of tendering agents service charges (meter prices 20021980) of tendering agents service fees under

3、 80%. Tendering agents service charge base should include the following tenders: construction, supervision and material over the above tenders are expected to be important, with each tendering agency entrusted with tender bid amount as a base for a separate computation of tendering agents service fe

4、es. Tendering agents service fee payment in accordance with the General Office of the State development and Reform Commission on tendering agents service charge of notification on the relevant issues (the change price 2003857). Sale of prequalification documents and solicitation documents going to c

5、hoose all, pricing should be based on the principle of profit not files, must not violate the relevant provisions in the price Department. 4.7 requirements in the form of application proxy application shall be prepared in the 5th chapter of the format. Application of various supporting documents sho

6、uld be requested by the selection of files grouped by order. Comparison and selection of the bidding agencies must provide supporting documents required by the file; the file you selected does not have the required supporting documents, bidding agency acknowledged the need to provide, or you can pro

7、vide. Proxy application shall be bound, and page-by-page coded in the order. 5th chapter application format notes: bidding agent .摘 要高校教师业务管理系统是运用信息技术来提高当前高校人事管理水平的有效途径,可以方便地对教师的业绩进行综合性量化评价。该系统可以对教师各项工作成果的相关数据进行管理,并由相应的部门对其真实性进行确认,与传统的手工统计相比增加准确性、公平性和统计效率,从而使得人事部门在考核教师业绩的过程中达到事半功倍的效果。该系统所体现的公平、公开、科学

8、的量化考核思想,能激发教师更高的工作热情,调动其积极性,充分发挥其在提高教学质量过程中的主导作用,从而提高整个学校的教学质量。该系统采用 B/S 模式,用 ASP.NET 实现前台开发,SQL Server 2000 作为后台数据库,主要包括教师个人信息管理模块、科研处核实模块、教务处核实模块、人事处量化管理模块,这四个模块覆盖了目前高校教师业务综合管理系统的常用功能,实现了对教师业绩信息的有效管理以及量化考核。关键词: 教师业务考核,量化管理, ASP.NETFirst compliance review of the application of the appraisal Committ

9、ee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through compliance reviews, be invalidated: (1) application of the formats, conten

10、ts, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements; (3) the similar project tendering agency agent number and provide

11、 proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the number of and references to meet the requirements; (6) no fraud ca

12、se. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 points) tender agent institutions similar project tender performance 1

13、6 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 million Yuan have 2 points, water project cumulative bid amount scored u

14、p not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar projects: proxy bid amount (since January 1, 2007 winning notice s

15、hall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performance (10 points) Project Manager agent performance scores including ag

16、ents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated winning amount calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for the n

展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 学术论文 > 毕业论文

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号