糊盒机xxG系列YT英文说明书

上传人:飞*** 文档编号:44948245 上传时间:2018-06-14 格式:DOC 页数:26 大小:19.19MB
返回 下载 相关 举报
糊盒机xxG系列YT英文说明书_第1页
第1页 / 共26页
糊盒机xxG系列YT英文说明书_第2页
第2页 / 共26页
糊盒机xxG系列YT英文说明书_第3页
第3页 / 共26页
糊盒机xxG系列YT英文说明书_第4页
第4页 / 共26页
糊盒机xxG系列YT英文说明书_第5页
第5页 / 共26页
点击查看更多>>
资源描述

《糊盒机xxG系列YT英文说明书》由会员分享,可在线阅读,更多相关《糊盒机xxG系列YT英文说明书(26页珍藏版)》请在金锄头文库上搜索。

1、Operation manualZH-(series)GAdopts High efficiency, high performance Uses advanced foreign technology high velocity runningMANUFACTURER: WENZHOU YOUTIAN PACKING MACHINERY CO.LTD1CONTENTSafety Notices 21. Brief introduction 32.Precautions 43.Technical guidance on machine adjustment 44.Operation metho

2、ds and steps4.1 Paper feeding unit 44.2 Pre-folding unit 54.3 Crash Lock bottom unit 64.4 Folding unit 74.5 Clamping uni. 84.6 Pressing unit 95. Methods and steps of belt replacing5.1 Paper feeding unit 115.2 Pre-folding unit 125.3 Bottom hooking unit 135.4 Folding unit 146. Electric circuit diagram

3、(Attach the diagram-1) 15Attach the diagram-2-5 . 16-21Main spare parts general chart 22-252ForewordThank you for your purchase of the ZH-(Series)G folder gluer. The manual has introduced that machine principle, structure, function, technology parameter, transportation assemble, operation and safe m

4、atters needing attention. Before the installation and operation, you shall read it carefully.Safety NoticesThis machine must be carried out installation, operation, maintenance by sole duty personnel. Before installation, operation, running, examination, read this manual and their additional documen

5、t carefully. And shall not be operated in violation of regulations. After knowing well of the equipment condition, safety information and other notices, the people can start to do the installation, operation, inspection, maintenance of the equipment. The safety notices separate two degrees “Dangerou

6、s“ and to “Caution“ marking in the Manual. Dangerous: Mistake operation will cause dangerous situation, may possibly lead to death or serious injury condition.Caution: Mistake operation will cause dangerous situation, may possibly lead to middle or light injury condition, and may arouse equipment or

7、 devices damaged. In addition, Caution:Records in different circumstances, it may also lead to serious consequences. Pay attention to contents with dangerous sign and caution sign in foreword and whole manual. Please observe the regulation exactly. 1. InstallationDangerous:When hoisting, dont stand

8、below the equipment. Being careful about a collision! Electricity connection must be carried out by professional electrician. Make sure before electricity connection, the power must be disconnected, in order to avoid electric shock. Please be sure to connect the ground line properly, so as to avoid

9、electric shock and fire happened!Caution The machine should choose the place with convenient operation, good air circulation, and plentiful light. There should be one meter width space around machine, in order to do the maintenance and service of the machine. The machine does not require special ass

10、embling basis, but the floor must be plan and level, can bear machine weight and moderate vibration. Must use sheet rubber to put it in even and ensure that ground line connect to the earth. When installing, the machine must to adjust be to be level. The electricity connection shall be taken after f

11、ix of the body of equipment.3The equipment passes in and out the electric cable to must be put into the protection cover. Before electricity connection, be sure that the rated power is the same as the request. Please use special tools for installation and wiring. If any damage or breakdown arouse in

12、 the machine or the electricity component, please contact us immediately.2. RunningDangerous:The operation of the machine must be carried out by the specialty operator after training! Before connect to the power, please lock control cabinet. Dont open it during running. Doesnt use wet hand to operat

13、e the various electricity buttons, avoid getting an electric shock! The electricity box and the belt surface are not allowed to sneak into metal or hard materials to avoid danger. Dispose a malfunction or clear up equipment must dump! Examining and repairing with electricity must be carried out by p

14、rofessional personnel.Caution In operation, the room must keep the stable the temperature and relative humidity. When running, do not open the cover of the components. Before the adjusting the box, must run 5 10 minutes without boxes, examining if anything abnormal. When working must not open the an

15、y cabinets in the machine. If anything abnormal, please press the emergency button.3. Maintenance, examination and parts replacementDangerous:Be sure to cut off the power before doing maintenance! Electricity examines and repairs by professional persons must have protection methods. Caution Instead of the designated person shall not carry out equipment maintenance and repair. When equipment is left unused, starts every thirty days, the running time is not less than 1 hour. Every

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 行业资料 > 其它行业文档

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号