优质杂交油菜北繁制种基地3.5万亩建设项目可行性研究报告 新编写

上传人:黯然****天空 文档编号:154436265 上传时间:2020-12-06 格式:PDF 页数:127 大小:1.48MB
返回 下载 相关 举报
优质杂交油菜北繁制种基地3.5万亩建设项目可行性研究报告 新编写_第1页
第1页 / 共127页
优质杂交油菜北繁制种基地3.5万亩建设项目可行性研究报告 新编写_第2页
第2页 / 共127页
优质杂交油菜北繁制种基地3.5万亩建设项目可行性研究报告 新编写_第3页
第3页 / 共127页
亲,该文档总共127页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《优质杂交油菜北繁制种基地3.5万亩建设项目可行性研究报告 新编写》由会员分享,可在线阅读,更多相关《优质杂交油菜北繁制种基地3.5万亩建设项目可行性研究报告 新编写(127页珍藏版)》请在金锄头文库上搜索。

1、First compliance review of the appli cation of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through compli

2、ance reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a biddi ng agent qualifications meet the requiremen

3、ts; (3) the similar proje ct tendering agency agent number and provi de proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the proje ct as a project manager has similar pr ojec

4、ts the number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (

5、16 points) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bi d notice for associate) cumulative each reache d 1

6、00 million Yuan have 2 points, water proje ct cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agent

7、s similar projects: proxy bid amount (since January 1, 2007 winni ng notice shall prevail) bidding pr ojects in more than 50 million Yuan by 2 poi nts, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the constructi on proje ct as a project manager in the same proj

8、ect performance (10 points) Project Manager agent performance scores including agents of the bidding agencies of similar proje cts, as well as in other similar proje ct tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like

9、 the accumulated wi nning amount calculati on rule: agents for water conservancy proje ct bid amount (since January 1, 2007 winni ng notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rul e for the number of agents similar project s:

10、proxy bid amount (since January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy proje ct period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher peoples Gover

11、nment or the development and Reform Commission published the winni ng bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 poi nts per person, 2 years experience in tende

12、ring agent .Pig is not a pig. With domestic international market and technology big environment of cha nges, as Chi na traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farmi

13、ng, and management cost and the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whol e industry chain of regulation capacity, market competition capa city and anti-ri sk capacity. First, industry analysis (a) the basic situation in Chi na is a

14、traditional hog production and consumption country, 2008 46.15 million tons of pork, pig stock 462.64 million head by the end pig slaughter 609.6 million. National pig industrys annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. Sichua

15、 n province in 2008 produced 6.52 million tons of pork, with 694,000 tons of Chengdu city, live pig sell 10.46 million, first 15 Vice-provincial cities in the country. The whole nation advantage regional planning (2008-2015) there are 437 counties (cities), 55, Sichuan, Chengdu has 7 (including in p

16、engzhou). International pig industry mainly include the European Union, the United States, and Cana da, and Brazil and other absolute scale of animal husbandry industry and technology developed countries. Market 1, the domestic market from Chinas meat consumption habits and economic analysis of the development situation, the emergence of new trends in the market of domestic pork and its products. Docking is a pig production and sales more cl osely. The Yngtze River Delta, Pearl River Delta

展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 办公文档 > PPT模板库 > 总结/计划/报告

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号