2020年职称英语考试理工类A补全短文专项练习题

上传人:亦明 文档编号:145596133 上传时间:2020-09-22 格式:DOC 页数:5 大小:15.55KB
返回 下载 相关 举报
2020年职称英语考试理工类A补全短文专项练习题_第1页
第1页 / 共5页
2020年职称英语考试理工类A补全短文专项练习题_第2页
第2页 / 共5页
2020年职称英语考试理工类A补全短文专项练习题_第3页
第3页 / 共5页
2020年职称英语考试理工类A补全短文专项练习题_第4页
第4页 / 共5页
2020年职称英语考试理工类A补全短文专项练习题_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

《2020年职称英语考试理工类A补全短文专项练习题》由会员分享,可在线阅读,更多相关《2020年职称英语考试理工类A补全短文专项练习题(5页珍藏版)》请在金锄头文库上搜索。

1、XX年职称英语考试理工类A补全短文专项练习题 xx年职称英语考试理工类A补全短文专项练习题 xx年考试备考已经开始啦,为了促进大家的学习积极性,网了职称英语相关的复习资料,下面是xx职称英语考试理工类A补全短文练习题,供大家备考复习。 Rumor has it that a legendary (传说的) six-headed monster lurks in the deep waters of the Tyrrhenian Sea between Italy and the island of Sicily_(46) When pleted in xx,the worlds longest

2、 bridge will weigh nearly 300,000 tons-equivalent to the iceberg that sank the Titanic- and stretch 5 kilometers long. Thats nearly 50 percent longer than any other bridge ever built, says structural engineer Shane Rixon. _ (47) Theyre suspension bridges, massive structures built to span vast water

3、channels or gorges ( 峡谷) . A suspension bridge needs just two towers to shoulder the structures mammoth (巨大的) weight, thanks to hefty (高强度的) supporting cables slung between the towers and anchored firmly in deep pools of cement at each end of the bridge. The Messina Strait Bridge will have two 54, 1

4、00-ton towers, which will support most of the bridges load. The beefy(结实的 ) cables of the bridge, each 1.2 meter in diameter, will hold up the longest and widest bridge deck ever built. When construction begins on the Messina Strait Bridge in xx, the finst job will be to erect two 370 meter-tall ste

5、el towers. _ (48) Getting these cables up will be something. Its not just their length-totally 5.3 kilometers-but their weight._ (49) After lowering vertical suspender cables from the main cables, builders will erect a 60 meter-wide 54, 630-ton steel roadway, or deck-wide enough to aommodate 12 lane

6、s of traffic. The decks weight will pull down on the cables with a force of 70,500 tons. In return, the cables yank (拽) up against their firmly rooted anchors with a force of 139,000 tons-equivalent to the weight of about 100,000 cars. Those anchors are essential. _ (50) A. Some environmentalists ar

7、e against the project on biological grounds. B. What do the worlds longest bridges have in mon? C. If true, one day you might spy the beast while zipping (呼啸而过) across the Messina Strait Bridge. D. Theyre what will keep the bridge from going anywhere. E. The second job will be to pull two sets of st

8、eel cables across the strait, each set being a bundle of 44,352 individual steel wires. F. They will tip up the scales at 166,500 tons-more than half the bridges total mass. 46.C。选项C中有一个关键词beast,与第一句中的monster相呼应。所以C是答案。 47.B。第二段第二句的主语是they。由于表语是suspension bridges,they替代的一定是前面句子出现过的bridges。六个选项中,只有B含

9、有bridges。填在第二段段首,意思连贯。 48.E。空白处前面的句子中有the first job这几个词。有first,必有second/then。六个选项中,只有E含有the secondiob,所以E是答案。 49.F。空白处前面的句子说的是,把这些吊索吊高定位是有难度的,不仅仅由于它们很长,还由于它们很重。后面应该接着说吊索的情况,选项F具体地介绍了它们的重量。 50.D。空白处前面的句子说的是,桥桩很重要。后面接着还应该说桥桩的事情,选项D解释了桥桩的作用,故选D。 【xx年职称英语考试理工类A补全短文专项练习题】相关文章: 1. 2. 3. 4. 5. 6. 7. 8. 模板,内容仅供参考

展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 办公文档 > 其它办公文档

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号