面向负荷的生产控制与JIT精编版

上传人:ahu****ng1 文档编号:145183255 上传时间:2020-09-17 格式:PPTX 页数:21 大小:605.76KB
返回 下载 相关 举报
面向负荷的生产控制与JIT精编版_第1页
第1页 / 共21页
面向负荷的生产控制与JIT精编版_第2页
第2页 / 共21页
面向负荷的生产控制与JIT精编版_第3页
第3页 / 共21页
面向负荷的生产控制与JIT精编版_第4页
第4页 / 共21页
面向负荷的生产控制与JIT精编版_第5页
第5页 / 共21页
点击查看更多>>
资源描述

《面向负荷的生产控制与JIT精编版》由会员分享,可在线阅读,更多相关《面向负荷的生产控制与JIT精编版(21页珍藏版)》请在金锄头文库上搜索。

1、Load-oriented manufacturing control just-in-time production for job shops,Production Planning Load conversion factor depreciation factor = planned output / Load limit = planning period planned lead time + planning period Limiting and balance work in process by order release.,Planned Inv. (I),(D),Loa

2、d limit,Planned lead time,Today,Planned Inv. (Buffer),Planned output(capacity),(D),Planned Release(I),Ideal Released Curve,Full load,Converted Load,Figure6. Derivation of conversion using the load limit,A considering the available capacities of a short-term planning periods(12Week) Planned orders we

3、re scheduled backward Selects periodically those of the planned orders Step1. Establish urgent orders Step2. Release wotrkable orders Time limit,3. Basic concept in load-oriented manufacturing control3.3 Technique of load-oriented order release,.,If capacities is needed Load-oriented release require

4、 appreciate decision,c,b,a,a,c,a,b,b,a,c,Planning period,Time limit,today,Time Days,Due,Over due,Future,Non-Urgent,Order 4,3,1,2,Workable,Workable,Unworkable,Omissible,A,B,C,Work centers,Load Hours,Load limit,Released Load,Remaining Load,Figure 7. Steps of Load-oriented order release,3. Basic concep

5、t in load-oriented manufacturing control3.4 Technique of load-oriented order entry,The ideas of Load-oriented order entry is to avoid overloaded weeks Checks the scheduled operation dates against available capacities for a midterm planning horizon (ex 12 weeks) Realistic due dates are offered and th

6、e expected bottlenecks are indicated. Initiation capacity changes in advance if possible Overload weeks Free date,.,.,Cumulative Load,Cumulative Capacity,Backlog,Overload Weeks,Underload weeks,Planning horizon,Today,Time week,Free Date,Overload Portion 83%,Total Load 100%,Load hour,Figure 8. Cumulat

7、ive load and capacity of a work center,.,. C is a critical work center,A,B,C,D,E,A,B,C,D,E,Overload Weeks,Today,Time week,Work center,A,B,C,D,E,Free Date,Order Lead Time,Operation Lead Time,Realistic Release Date,Realistic Delivery Date,Planning Horizon,Figure 9. Establishing a realistic delivery da

8、te of an order,4.Overview of a load-oriented manufacturing control system,1. Routing data 2. Order data 3. Item data 4. Shop calendar 5. Capacity data 6. Transaction data 7. Control data: detailed tables for w/c and free definable group,.,.,Shop Calendar,Capacity Data,Planning Data,Transaction Data,

9、Item Data,Order Data,Routeing Data,PROGRAM Transaction Data,PROGRAM Control Data,PROGRAM Shop Calendar,Program Graphs Reports,PROGRAM Operation Sequencing,PROGRAM Order Release,PROGRAM Order Entry,DIALOG Capacities,DIALOG Operation Complete,DIALOG Order Release,DIALOG Order Entry,Capacities Entries,

10、Capacities Release,Capacities Sequences,Graphs Reports,Control Data,CONTROL SYSTEM(PC),BASIC SYSTEM(HOST),PLANNING SYSTEM(PC),Figure 10. Load-oriented manufacturing control system showing the data flow,5.Example of the control system,1. The method of basic throughput diagrams is extended (Figure 1 w

11、ith diagrams) 2. Operation Throughput Element 3. Planned and actual average lead time are computed for each inventory as well as average due-date dev. For release, input, output and delivery,Entry,Release,Input,Output,Delivery,Disposition,Indirect,Direct,Downstream,Upstream,Open,Cycle,Total lead tim

12、e,Wait after operation,Transport,Wait before operation,Setup,Run,Interoperation time,Process time,Direct Load time,.,4. Pump-building factory characteristics products 9000 pumps Manufactured parts 26000 different items Manpower(Job shop) 180 persons Work centers 130 (mainly 2 shifts) Orders 350 per

13、week Operations 4,5 per order (Max 20) Run times 3,7 per operation Lot sizes 30 per order(1-1000) Factory began to work with the new system in 1987 Improvement (compared 1991 with 1987) Inventory was twice as high in 1987 Most delivery higher than in 1987 Cycle lead time(release delivery)were cut fr

14、om almost 8weeks to 5weeks Due-date deviations 4.5 to 1 week (lateness) Total lead time(entrydelivery) 14weeks to 9 weeks,Conclusion,Load-oriented manufacturing control system enables the factory 1. Reducing lead time and inventories 2. Keeping actual lead time on a planned level 3. Meeting the plan

15、ned due dates 4. Maintain an appropriate work-center utilization results in safer scheduling foundation for JIT production,1、有时候读书是一种巧妙地避开思考的方法。20.9.1720.9.17Thursday, September 17, 2020 2、阅读一切好书如同和过去最杰出的人谈话。09:22:3409:22:3409:229/17/2020 9:22:34 AM 3、越是没有本领的就越加自命不凡。20.9.1709:22:3409:22Sep-2017-Sep-

16、20 4、越是无能的人,越喜欢挑剔别人的错儿。09:22:3409:22:3409:22Thursday, September 17, 2020 5、知人者智,自知者明。胜人者有力,自胜者强。20.9.1720.9.1709:22:3409:22:34September 17, 2020 6、意志坚强的人能把世界放在手中像泥块一样任意揉捏。2020年9月17日星期四上午9时22分34秒09:22:3420.9.17 7、最具挑战性的挑战莫过于提升自我。2020年9月上午9时22分20.9.1709:22September 17, 2020 8、业余生活要有意义,不要越轨。2020年9月17日星期四9时22分34秒09:22:3417 September 2020 9、一个人即使已登上顶峰,也仍要自强不息。上午9时22

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 商业/管理/HR > 管理学资料

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号