《第五章橡胶板及塑料板衬里工程_定额》由会员分享,可在线阅读,更多相关《第五章橡胶板及塑料板衬里工程_定额(8页珍藏版)》请在金锄头文库上搜索。
1、范文范例 学习指导5.1热硫化硬橡胶衬里工作内容:运料、配浆、下料削边、表面清洗、刷浆贴衬、火花检查、硫化、硬度检查。计量单位:10m2定额编号11-73511-73611-73711-738项目单位单价塔、槽类设备1.5m以下1.5m以上一层两层一层两层数量合计数量合计数量合计数量合计综合单价元1371.972120.951285.911962.45其中人工费元673.401047.10617.16943.50材料费元233.95387.20233.95387.20机械费元107.71131.69107.71131.69管理费元262.63408.37240.69367.97利润元94.28
2、146.5986.40132.09二类工工日74.009.10673.4014.151047.108.34617.1612.75943.50材料02010121硬橡胶板m2(11.24)(22.48)(11.20)(22.40)12413556胶料S1002kg(1.99)(3.58)(1.99)(3.58)12030113橡胶溶解剂油kg9.9019.10189.0934.36340.1619.10189.0934.36340.1602270106白布m4.000.301.200.301.200.301.200.301.2024170101丝绸绝缘布m225.000.5012.500.501
3、2.500.5012.500.5012.5031150301电kWh0.892.452.184.904.362.452.184.904.3631150503蒸汽t14.002.0728.982.0728.982.0728.982.0728.98机械99450303轴流通风机 功率7.5kW台班42.981.23252.951.76875.991.23252.951.76875.9999433310电动空气压缩机 排气量10m3/min台班527.340.1052.730.1052.730.1052.730.1052.7398410104火花检测仪台班20.310.102.030.1462.97
4、0.102.030.1462.97工作内容:同前。计量单位:10m2定额编号11-73911-74011-74111-742项目单位单价锥形设备1.5m以下1.5m以上一层两层一层两层数量合计数量合计数量合计数量合计综合单价元1425.182263.611326.672072.27其中人工费元708.181140.34643.801015.28材料费元233.95387.20233.95387.20机械费元107.71131.69107.71131.69管理费元276.19444.73251.08395.96利润元99.15159.6590.13142.14二类工工日74.009.57708.
5、1815.411140.348.70643.8013.721015.28材料02010121硬橡胶板m2(11.26)(22.52)(11.22)(22.44)12413556胶料S1002kg(1.99)(3.58)(1.99)(3.58)12030113橡胶溶解剂油kg9.9019.10189.0934.36340.1619.10189.0934.36340.1602270106白布m4.000.301.200.301.200.301.200.301.2024170101丝绸绝缘布m225.000.5012.500.5012.500.5012.500.5012.5031150301电kWh
6、0.892.452.184.904.362.452.184.904.3631150503蒸汽t14.002.0728.982.0728.982.0728.982.0728.98机械99450303轴流通风机 功率7.5kW台班42.981.23252.951.76875.991.23252.951.76875.9999433310电动空气压缩机 排气量10m3/min台班527.340.1052.730.1052.730.1052.730.1052.7398410104火花检测仪台班20.310.102.030.1462.970.102.030.1462.97工作内容:同前。计量单位:10m2
7、定额编号11-74311-744项目单位单价多孔板一层两层数量合计数量合计综合单价元5312.378834.99其中人工费元3229.365404.22材料费元262.66433.14机械费元108.79133.39管理费元1259.452107.65利润元452.11756.59二类工工日74.0043.643229.3673.035404.22材料02010121硬橡胶板m2(11.78)(23.56)12413556胶料S1002kg(2.00)(3.60)12030113橡胶溶解剂油kg9.9022.00217.8039.00386.1002270106白布m4.000.301.200
8、.301.2024170101丝绸绝缘布m225.000.5012.500.5012.5031150301电kWh0.892.452.184.904.3631150503蒸汽t14.002.0728.982.0728.98机械99450303轴流通风机 功率7.5kW台班42.981.23252.951.76875.9999433310电动空气压缩机 排气量10m3/min台班527.340.1052.730.1052.7398410104火花检测仪台班20.310.1533.110.234.67工作内容:同前。计量单位:10m2定额编号11-74511-74611-74711-748项目单位
9、单价管道108以下426以下一层两层一层两层数量合计数量合计数量合计数量合计综合单价元1772.363058.351344.372129.95其中人工费元911.681610.98631.961004.18材料费元267.90460.16267.90460.16机械费元109.58133.39109.58133.39管理费元355.56628.28246.46391.63利润元127.64225.5488.47140.59二类工工日74.0012.32911.6821.771610.988.54631.9613.571004.18材料02010121硬橡胶板m2(11.64)(22.96)(1
10、1.28)(22.56)12413556胶料S1002kg(2.00)(3.60)(2.00)(3.60)12030113橡胶溶解剂油kg9.9024.00237.6043.20427.6824.00237.6043.20427.6802270106白布m4.000.301.200.301.200.301.200.301.2024170101丝绸绝缘布m225.000.5012.500.5012.500.5012.500.5012.5031150301电kWh0.892.452.184.904.362.452.184.904.3631150503蒸汽t14.001.0314.421.0314.421.0314.421.0314.42机械99450303轴流通风机 功率7.5kW台班42.981.23252.951.76875.991.23252.951.76875.9999433310电动空气压缩机 排气量10m3/min台班527.340.1052.730.1052.730.1052.730.1052.7398410104火花检测仪台班20.310.1923.900.234.670.1923.900.234.67工作内容:同前。计量单位:10m2定额编号11-74911-75011-75111-752项目单位单价阀门76以下133以下一层两层